Reports tabled at the Ordinary Meeting of Council on Tuesday date held at City Hall, Little Malop Street in Geelong.


  1. Election of Deputy Mayor

  2. Review of Road Management Plan

  3. Victorian Waste and Resource Recovery Policy – Getting Full Value

  4. Victorian Waste and Resource Recovery Policy – Ministerial Advisory Committee

  5. 2013-2014 Sport and Recreation Victoria Funding Program Submissions

  6. Contractual Matter (Confidential)



1. Election of Deputy Mayor

During the Ordinary Meeting of Council on 27 November 2012, Cr Stretch Kontelj was elected as Deputy Mayor until 27 May 2013.  In accordance with 11C(2) of the City of Greater Geelong Act 1993, Council must elect a Deputy Mayor upon the office becoming vacant.

Cr Macdonald moved, Cr Nelson seconded –

That Council elect a Deputy Mayor for a six month period from 28 May 2013 to 28 November 2013.

Carried.

Cr Nelson moved, Cr Heagney seconded -

That Cr Bruce Harwood be nominated as Deputy Mayor for a six month period 28 November 2013 until 28 May 2013.

There being no further nominations, Cr Bruce Harwood was declared elected as Deputy Mayor of the City of Greater Geelong for a six month period from 28 November 2013 to 28 May 2013.

Carried.

Cr Macdonald left the meeting room at 7.29pm for the evening.


[Back to List]

2. Review of Road Management Plan

Portfolio:

Infrastructure – Cr Ellis

Source:

City Services – Engineering Services

General Manager:

Gary Van Driel

Index Reference:

Subject: Roads, Footpath & Streets / Asset Management Roads Maintenance & Repair


Summary

The purpose of this report is to seek Council’s approval of the review of the Road Management Plan (Version 5.0) under the provisions of the Road Management Act 2004 (RMA).

The Road Management Plan sets out the inspection frequencies, maintenance standards and response times that are applied to the road infrastructure for which Council is responsible.

The Road Management Plan (Version 4.0) was adopted by Council on 27 October 2009. The RMA regulations require that the plan be reviewed when a new Council is elected. The RMA also requires that the plan be made available for public comment if that review proposes a reduction to level of service

General changes have been made to the Plan, including updates to relevant documents and updating tables of asset quantities. The proposed changes are summarised as follow:

The proposed Road Management Plan (Version 5.0) was available for public comment for 28 days from the 23 February 2013. No comments were received.

This Road Management Plan (Version 5.0) is now in its final recommended format and Council may now proceed to adopt it so that it may be gazetted.

Cr Ellis moved, Cr Harwood seconded -

That consideration of the report be def

Carried.


[Back to List]

3. Victorian Waste and Resource Recovery Policy – Getting Full Value

Portfolio:

Environment and Sustainability - Cr Richards

Source:

City Services

General Manager:

General Manager: Gary Van Driel

Index Reference:

Index Reference: Waste Management


Summary

Cr Richards moved, Cr Harwood seconded -

That Council writes to the Minister welcoming the Policy direction and in particular the commitment by the State Government to address key waste management issues and offers to be involved and assist, to the extent that it is able, in the development of the statewide integrated waste and resource recovery system.

Carried.


Report

Background

In October last year the State Minister for Environment and Climate Change released the draft Victorian Waste and Resource Recovery Policy for consultation and comment.

At its meeting on 11 December 2012 Council resolved to respond to the call for comment by:

advised that the Policy should

On 15 April 2013 the Minister released the Getting Full Value - Victorian Waste and Resource Recovery Policy.

The Policy sets a 30 year vision ‘to have an integrated state wide waste management and resource recovery system that provides an essential community service by protecting the environment and public health, maximising the productive value of resources and minimising long term costs to households, industry and government’ with principles and policy priorities for the next 10 years.

It is part of the Victorian Government’s economic and environmental strategies set out in the recently released Securing Victoria’s Economy and Environmental Partnerships and assumes that if Victoria’s waste is managed effectively it will provide economic development opportunities.

The key objectives of the Policy are to provide:

The Policy states that the Victorian Government will:

A full copy of the Policy may be viewed at Department of Sustainability and Environment.

As with the draft Policy, the Policy recognises the need for a review of the governance processes (ie: the roles and responsibilities of the state organisations, namely the Department of Environment and Primary Industry, Sustainability Victoria and the regional waste management groups) and supports the current Ministerial Advisory Committee process that was established under the draft Policy. A separate report has been prepared regarding a response to this review.


Discussion

The Policy is a comprehensive list of waste management issues and most importantly clearly outlines what the State Government plans to do about these issues. As such it includes government commitments and actions and provides a strong support base for local government generally and this Council’s waste management direction.

The Policy also identifies that the previous Victorian policy, Toward Zero Waste, served its purpose by setting targets for waste reduction that has resulted in the diversion of the ‘easy to do’ waste types and on the back of this it is necessary to take a different approach, one of more direct Victorian Government action, commitment and practical support.

The most significant commitment is in the Vision ‘to establish a state wide integrated waste management system’ that incorporates all waste streams with land use planning and regulator support across all the varying community needs, both in the short and long term. This system will be developed through the preparation of a state wide infrastructure strategic plan that acknowledges current waste infrastructure, identifies the gaps and provides direction on infrastructure development. Of importance in this process is the prioritisation of organics as a waste stream requiring specific attention. The Policy proposes an organics strategy that seeks suitable organics processing technologies, regulator support and developer encouragement.

In terms of the particular issues raised by Council in its response to the draft Policy, the Policy:

While the Policy is comprehensive it will not provide any quick fixes as it is a calculated policy that incorporates a 30 year vision with principles and priorities to be observed over the first ten years. It takes a responsible approach of gathering data to enable well informed decision making that will be embodied in various strategic directions. It is considered that this is exactly what the waste industry in Victoria needs at this time.

The potential failing in the Policy is the significant focus on waste management as an economic driver and the possible outcome that if this does not prove to be the case then the environmental benefits may be disregarded.

In terms of setting targets the Policy has taken the approach that these will be established in the form of performance measures once sufficient data is available to ensure that these are realistic and can be regularly measured. These performance measures will specifically address environmental impacts of landfills, illegal dumping and litter, waste generation reduction, waste and resource recovery processes and productivity, competitive markets for recovered materials and assessments of how planning and regulatory organisation are dealing with these aspects. These performance measures will be report on bi-annually.

It is recommended that the Policy be supported and that Council again offer to assist, to the extent that it is able, in the development of the various strategies proposed.


Environmental Implications

The underlying focus of the Policy is to reduce the environmental impact of the waste we produce.


Financial Implications

There are no financial implications as a result of this report.

Policy/Legal/Statutory Implications

The Policy is the key strategic document for the management of waste in Victoria and establishes the foundation for waste management direction in the State. It will be translated into regional waste management plans and Council will be obliged to follow its direction, within the limitations of its own capabilities and community demands.

The Policy, along with Council’s previously adopted waste management position paper, will form the basis for the preparation of Council’s own waste management strategy.


Officer Direct or Indirect Interest

No Council officers have any direct or indirect interest in this matter, in accordance with Section 80© of the Local Government Act.

Risk Assessment

There are no notable risks to Council as a result of the recommendation from this report.


Social Considerations

The Policy should provide direction for the provision of waste management services by the Council that may have social considerations, however, Council will be able to address these matters at a future time as part of the consideration of any aspect of its waste management service delivery.


Communication

Other than the response to the Minister there are no communication issues as a result of this report.


[Back to List]

4. Victorian Waste and Resource Recovery Policy – Ministerial Advisory Committee

Portfolio:

Environment and Sustainability –Cr Richards

Source:

City Services

General Manager:

Gary Van Driel

Index Reference:

Waste Management


Summary

and raised a number of detailed questions around these issues, primarily to do with the relationships and roles and responsibilities of the Victorian government bodies and in particular those of the regional waste management groups and their configuration throughout Victoria.

Cr Richards moved, Cr Harwood seconded -

That Council writes directly to the Minister and to the Ministerial Advisory Committee recommending that the waste and resource recovery infrastructure plan and the organics strategy be developed prior to any further consideration of the issues before the Ministerial Advisory Committee and that these strategies be prepared as a matter of urgency.

Carried.


Report

Background

In October last year the Victorian Minister for Environment and Climate Change released the draft Victorian Waste and Resource Recovery Policy for consultation and comment.

The draft Policy committed to the appointment of a Ministerial Advisory Committee (MAC) to advise on institutional and governance arrangements to deliver on the objectives outlined in the draft Policy.

The MAC has been established, comprising three members with expertise in local government, waste management and economic management with the task to investigate and carry out industry consultation during April and May and report to the Minister by the end of May.

Local government consultation sessions have been conducted over the period 26 April to 9 May. A Council officer attended a consultation session on 1 May.

The MAC has ‘not encouraged’ consultation submissions other than through the consultation sessions, relying on these and information gathered from previous reviews and investigations.

The MAC is required to review only the Victorian government organisations involved in waste management, namely Department of Environment and Primary Industry, Sustainability Victoria and the regional waste management groups. The role of local government as the service provider for municipal waste is acknowledged.

The consultation focussed on the key issues of:

and raised a number of detailed questions around these issues, primarily to do with the relationships and roles and responsibilities of the Victorian government bodies and in particular those of the regional waste management groups and their configuration throughout Victoria.

Develop the statewide waste and resource recovery system strategic documents (ie: the Waste and Resource Recovery Infrastructure Plan and the Organics Strategy) as a precursor to further consideration of these issues to first identify what is required under these strategies. This is in accordance with Council submission to the Policy consultants in December 2012.

Discussion

The Ministerial Advisory Committee review has been confirmed as an action under the now released Victorian Waste and Resource Recovery Policy – Getting Full Value, as previously reported to Council.

The vision of this Policy is ‘to have an integrated state wide waste management and resource recovery system that provides an essential community service by protecting the environment and public health, maximising the productive value of resources and minimising long term costs to households, industry and government’ with the preparation of a waste and resource recovery infrastructure strategic plan and organics strategy key actions to guide the implementation of this system. The previous report identifies these actions as crucial to the forward direction for waste management in Victoria, as at present there is no strategic direction other than waste reduction targets set under the previous State waste strategy. That is, there is a destination but no road map. The Policy provides this road map.

In addition to these strategic documents the Victorian Policy flags the likelihood of waste infrastructure being established on a ‘hub and spoke’ arrangement with the hub containing specific infrastructure items (eg: major landfill, waste treatment facility) with feedstock delivered by transport networks from the outer areas (ie; the spokes).

The infrastructure plan and organics strategy will provide guidance on the type of facilities required and the preferred locations and feedstock sources and as a consequence will help in determining the preferred procurement processes and provide for transparency in the expenditure of future landfill levee funding.

If prepared through a collaborative process these strategic documents will assist in gaining buy in from all stakeholders. It should be noted that the Policy promotes the integration of waste which includes commercial and industrial waste and construction and demolition waste, all of which are controlled by the private sector. This will add a further level of complexity to the future direction and the future governance and institutional arrangements. Identifying how these wastes streams will be managed is critical prior to deciding on how those responsible for these waste are to be included in the planning processes.

It is the therefore the strong recommendation of this report that these strategic documents should be developed prior to any serious consideration of how the State authorities should be structured and roles and responsibilities determined in order that these aspects can be aligned to best deliver on the directions that are identified. To establish these processes in the current waste management strategic void is not likely to provide the best outcome.

This approach does highlight the urgency around the preparation of these strategic documents and, as with the previous report of the Victorian Waste and Resource Recovery Policy, Council should offer its assistance to the extent that it is able for the preparation of these documents.


Environmental Implications

The underlying focus of the Victorian Waste and Resource Recovery Policy and consequently the Ministerial Advisory Committee considerations, is to reduce the environmental impact of the waste we produce.


Financial Implications

There are no financial implications as a result of this report.


Policy/Legal/Statutory Implications

The Policy is the key strategic document for the management of waste in Victoria and establishes the foundation for waste management direction in the State. It will be translated into regional waste management plans and Council will be obliged to follow its direction, within the limitations of its own capabilities and community demands.

How the Policy is to be implemented will have a significant bearing on how Council delivers its waste services in the future therefore it is critical that the most effective structure to deliver on the Policy is established. The recommendations of this report are considered to provide the best opportunity of achieving the most effective future waste management system.


Officer Direct or Indirect Interest

No Council officers have any direct or indirect interest in this matter, in accordance with Section 80c of the Local Government Act.


Risk Assessment

There are no notable risks to Council as a result of the recommendation from this report.


Social Considerations

Other than ensuring that the Policy delivery occurs in the most effective and transparent manner there are no social considerations resulting from this report.


Communication

Other than the response to the Minister there are no communication issues as a result of this report.


[Back to List]

5. 2013-2014 Sport and Recreation Victoria Funding Program Submissions

Transport – Cr Richards

Portfolio:

Sport & Recreation - Cr Irvine

Source:

Projects, Recreation & Central Geelong / Sport & Recreation

General Manager:

Dean Frost

Index Reference:

Subject: Grants & Subsidies / Sport & Recreation
Grants & Funding - incoming


Summary

Cr Irvine moved, Cr Richards seconded -

That Council endorse the:

  1. development of submissions for Sport and Recreation Victoria’s funding programs for expenditure in the 2014/15 financial year as follows:

    Community Facilities Funding Program – Major Facilities Category

    Community Facilities Funding Program – Minor Facilities Category

    Community Facility Funding Program – Soccer Facilities

    Community Facilities Funding Program – Planning Category

    Country Football & Netball Program

  2. revised process for the selection of projects for submission to Sport & Recreation Victoria, and that revision to include bringing the report back to Council for endorsement.

Carried.


Background

Each year, the State Government make funds available for sport & recreation projects through a number of Sport and Recreation Victoria (SRV) grant programs.

Generally, these funding programs encourage:

There are two funding programs that are of particular relevance to this report – Community Facility Funding Program and Country Football Netball Program. Within the Community Facility Funding Program there are four categories that are of relevance to this report (as outlined below).

Grant Program/ Category

Who can apply

No. of Applications

Maximum Amount per Grant

Maximum Total Project Cost

Funding Ratio** (minimum)

Community Facility Funding Program – Major Facilities Category

Sporting clubs, community groups & Councils

One (1)

$650,000

No limit

1 State : 2 Local

Community Facility Funding Program - Minor Facilities Category

Sporting clubs, community groups & Councils

Up to three (3) – seeking a maximum total of $200,000

$100,000*

$500,000

1.5 State : 1 Local

Community Facility Funding Program – Soccer Facilities

 

Sporting clubs, community groups & Councils

Up to two (2) – seeking a maximum total of $100,000

$100,000

No limit

1.5 State : 1 Local

Community Facility Funding Program – Planning Category

Councils

One (1)

$30,000

No limit

1.5 State : 1 Local

Country Football Netball Program

Sporting clubs, community groups & Councils

Up to three (3), seeking a maximum total of $100,000

$100,000

No limit

1.5 State : 1 Local

*Applications under the Minor Facilities category for the maximum grant amount need to involve an exceptional project or circumstance.

**Funding ratio is specific for regional cities


Discussion

This report relates to two matters for the consideration of Council: 1) endorsement of projects to be submitted to SRV for funding consideration, and 2) revision of the process for the selection and endorsement of projects to be submitted to Sport & Recreation Victoria by Council.

This report refers specifically to the recommended applications for possible funding by SRV under the Community Facility Funding Program (Major Facilities, Minor Facilities, Soccer Facilities and Planning categories) and Country Football & Netball Program. In determining recommended projects, the SRV funding guidelines/criteria and the likelihood of success have been considered.

Projects submitted to SRV for consideration will be eligible for funding in the 2014/15 financial year. Projects that will have commenced prior to the announcement of funding are not eligible and cannot be considered for submission to SRV.

Applications to SRV are due on the following dates:

* Please note that the funding program guidelines (including funding criteria) were released by the State Government on 6 May 2013.

Community Facility Funding Program - Major Facilities Category

The Major Facilities category provides funding opportunities for projects with significant regional and/or multi-use benefit, as well as providing participation outcomes across wide geographic and demographic populations.

The assessment criteria for this category are as follows:

Why?

Demonstrate the extent to which the project:

20%

Responds to identified community needs and issues and is strategically supported by local or regional plans and/or State Sporting Associations/peak bodies planning.

Addresses a gap in local/regional provision of facilities.

How?

Demonstrate the extent to which the project:

20%

Clearly identifies the project scope, methodology and how proposed

outcomes can be completed within a prescribed timeframe (detailed in a

Project Management Framework).

Includes provision of appropriate project costing and confirmation of funding sources.

Includes formally endorsed schematic plans that address safety, risk management, Universal Design principles, Environmentally Sustainable Design**.

Demonstrates economic impact during construction and operation, including employment during and after construction.

Who?

Demonstrate the extent to which the project:

10%

Engages, consults and collaborates with a variety of stakeholders.

Will be managed by an appropriately qualified team.

Considers inter-municipal linkages and issues where appropriate.

What will the project achieve?

Demonstrate the extent to which the project:

50%

Increases (or in certain cases maintains) participation in sport and recreation. As a result of the project, what will be the additional participation and programming outcomes? Please provide support letters that clearly state how each partner will benefit.

Encourages the broadest possible community participation in sport and

recreation activities.

Has significant regional/sub-regional and/or multi-purpose benefits.

Improves the quality and range of sport and recreation opportunities.

Demonstrates appropriate business planning, which addresses operational

and financial sustainability.


A number of projects were considered for the Major Facilities category. The City of Greater Geelong can submit one (1) application for consideration by SRV under this category. In evaluating projects, consideration was given to projects that provide the greatest benefit to the community and meet the assessment criteria for the funding program. Availability of local funding sources was also taken into consideration.

Council staff have had discussions with the SRV regional office to gain feedback on potential projects. The project that is proposed to be submitted to SRV for funding consideration is outlined below:

Project: Geelong Criterium Circuit Pavilion

Project Description: Construction of a pavilion at the Geelong Criterium Circuit (Belmont). This project will provide much needed amenity, administrative and social facilities for cycling events, club competition & training, and programmed activities at the criterium circuit. The criterium circuit currently has no pavilion or amenity facilities.

Total project cost: $1,400,000

Funding sources: $466,000

Council contribution required: $934,000

Community Facility Funding Program - Minor Facilities and Soccer Facilities Categories

The Minor Facilities and Soccer Facilities categories provide funding opportunities for locally significant projects that increase participation in sport & recreation and improve community access to facilities.

While these two grant categories are separate, they share common assessment criteria. The Minor Facilities category is for all sport and recreation activities, whereas the Soccer Facilities category is for soccer facilities only.

The assessment criteria for these categories are as follows:

Why?

Demonstrate the extent to which the project:

20%

Responds to identified community needs and issues, based on consultation and addresses a gap in the provision of local facilities.

Is strategically supported by local or regional plans and/or State Sporting Associations/peak bodies plans.

How?

Demonstrate the extent to which the project:

20%

Clearly identifies the project scope, methodology and that proposed outcomes
can be completed within a prescribed timeframe.

Includes the provision of quotations/internal cost estimates, and schematic plans (endorsed by the project partners) for the project.

Includes confirmation of funding contributions (both financial and in-kind) with letters detailing level and type of in-kind contribution provided.

Addresses issues around safety, risk management, Universal Design Principles and Environmentally Sustainable Design.

Includes project costs provided by a certified quantity surveyor, tender price or independent qualified expert for projects with a total project cost of more than $500,000 (excluding GST). (For Soccer Facilities only).

Who?

Demonstrate the extent to which the project:

10%

Consults and collaborates with a variety of stakeholders.

What will the project achieve?

Demonstrate the extent to which the project:

50%

Increases (or in certain cases maintains) participation in sport and recreation. As a result of the project, what will be the additional participation and programming outcomes? Please provide support letters that clearly state how each partner will benefit.

Encourages the broadest possible community participation in sport and
recreation activities.

Considers multi-use and improves the quality and range of sport and
recreation opportunities.


Minor Facilities Category

A number of project registrations were submitted to Council by sporting clubs and community groups that are eligible for the Minor Facilities category. The City of Greater Geelong can submit up to three (3) applications for consideration by SRV under this category. In evaluating project registrations, consideration was given to projects that provide the greatest benefit to the community and meet the assessment criteria for the funding program. Availability of funding contributions from local sources was also taken into consideration.

Council staff have had discussions with the SRV regional office to gain feedback on the proposed projects. The projects that are proposed to be submitted to SRV for funding consideration are outlined below:

Project 1: Regional Paddle Sports Pavilion Redevelopment

Project Description: Redevelopment of the existing pavilion/storage facility on the Barwon River at Balyang Sanctuary. This project will provide increased capacity for multiple user groups to use the facility as a base for activities. The pavilion is the central facility for paddle sports within the municipality, providing regional benefit to the community.

Total project cost: $300,000

Funding sources: Grant $80,000, Club $80,000 In-kind (Club) $25,000

Council contribution required: $115,000

 

Project 2: Barwon Heads Village Park Playground Upgrade

Project Description: Upgrade of the playground at Barwon Heads Village Park on Sheepwash Rd. This was identified as a sub-regional playground in the Geelong Play Strategy. The playground is due for upgrade works to provide greater opportunities for informal recreation. Sub-regional playgrounds within the Geelong are designed to provide unique play experiences throughout the municipality.

Total project cost: $250,000

Funding sources: Grant $70,000

Council contribution required: $180,000

Project 3: Eastern Park Tan Track Development

Project Description: Upgrade of the Tan Track at Eastern Park to provide a central facility for informal walking and running activities. The project will include the installation of timing equipment, distance markers, signage, crossing points and path upgrades.

Total project cost: $150,000

Funding sources: Grant $50,000

Council contribution required: $100,000

Soccer Facilities Category

A number of project registrations were received by Council that are eligible for the Soccer Facilities category. The City of Greater Geelong can submit up to two (2) applications for a total of $100,000 for consideration by SRV under this category. In evaluating project registrations, consideration was given to applications that provide the greatest benefit to the community and addressed the assessment criteria.

Council staff have had discussions with the SRV regional office to gain feedback on the proposed project. The project that is proposed to be submitted to SRV for funding consideration is outlined below:

Project 1: Barwon Heads Village Park Soccer Field Upgrade

Project Description: Upgrade of the playing field at Barwon Heads Village Park to include irrigation and drought tolerant turf. This project will allow increased use of the playing field for soccer. This project is supported by the Barwon Heads Village Park Master Plan.

Total project cost: $200,000

Funding sources: Grant $100,000

Council contribution required: $100,000

Community Facility Funding Program - Planning Category

Council has an opportunity to apply for funding through the Planning Category to undertake a recreation planning or facility feasibility project. Planning projects are generally required to address a Council/region-wide project and/or provide solutions to complex sport and recreation issue.

The assessment criteria for this category are as follows:

Why?

Demonstrate how the planning process:

20%

Responds to identified community needs and issues and is supported by local organisations and/or Sporting Associations/peak bodies planning.

How?

Demonstrate the extent to which the project:

20%

Clearly identifies the project scope, methodology and proposed outcomes in a
draft project brief.

Encourages innovative approaches to address issues such as risk management, Universal Design, multi-use and environmental sustainability.

Who?

Demonstrate the extent to which the project:

10%

Will consult and collaborate with a variety of project partners and stakeholders.

Considers inter-municipal linkages and issues (where appropriate).

What will the project achieve?

Demonstrate the extent to which the project:

50%

Proposes outcomes that would increase (or in certain cases maintain) participation
in sport and recreation.

Plans for projects that encourage the broadest possible community participation
in sport and recreation activities.

Considers multi-use and improves the quality and range of sport and recreation facilities and programming outcomes.

 

The following project is considered the highest priority amongst potential planning projects.

Project: Greater Geelong Recreation & Leisure Needs Study

Project Description: The Greater Geelong Recreation & Leisure Needs Study will investigate and quantify the recreation and leisure needs of current and future communities within the municipality. The focus of this study will be to provide broad strategic direction on future resource allocation to meet current and anticipated leisure needs. A key focus for the project will be the development of service plans to be delivered under Council’s asset management framework. The project will include analysis of capital contributions, service provision and economic development opportunities.

Total project cost: $100,000

Funding sources: Grant $30,000

Council Contribution required: $70,000

Country Football & Netball Program

The Country Football & Netball Program provides funding opportunities for football and/or netball facility projects that increase participation in football and netball and improve community access to facilities.

The assessment criteria for this category are as follows:

Why?

Demonstrate the extent to which the project:

20%

– Responds to identified community needs and issues and is supported strategically by other local or regional plans and/or State Sporting Associations/peak bodies planning.

– Aligns with Victorian Government priorities, for example, the project is in a location of rapid population growth, a Community Renewal, Community Building Initiative or Neighbour hood Renewal area.

How?

Demonstrate the extent to which the project:

20%

– Clearly identifies the project scope, methodology and proposed outcomes that can be completed within a prescribed timeframe.

– Includes the provision of quotations/internal cost estimates, concept/schematic plans for the project and confirmation of funding contributions (both financial and in-kind).

– Encourages innovative approaches to address items such as risk management, universal design principles, multi-use and environmental sustainability.

Who?

Demonstrate the extent to which the project:

10%

– Consults and collaborates with a variety of stakeholders including relevant peak bodies.

What will it achieve?

Demonstrate the extent to which the project:

50%

– Increases, or in certain cases maintains participation and addresses the demand for facilities.

– Considers multi-use and improves the quality and range of sport and recreation opportunities.

– Improves access to those groups traditionally disadvantaged, for example, people with a disability, women, young people, older adults, people from non-English speaking backgrounds, Indigenous people and those rurally isolated.

 

A number of project registrations were received by Council that are eligible for the Country Football & Netball Program. The City of Greater Geelong can submit up to three (3) applications for a total of $100,000 for consideration by SRV under this category. In evaluating project registrations, consideration was given to applications that provide the greatest benefit to the community and addressed the assessment criteria.

Council staff have had discussions with the SRV regional office to gain feedback on the proposed project. The project that is proposed to be submitted to SRV for funding consideration is outlined below:

Project 1: Netball Court Upgrade – Herne Hill Reserve

Project Description: Upgrade of netball facilities at Herne Hill Reserve from one netball court to two plexipave netball courts with lighting. Herne Hill Reserve is one of the few remaining reserves to have only one court available for competition and training. The upgrade of facilities to include an additional court will allow St Josephs Football Netball Club to host all competition and training at the reserve. The club currently runs training and competition outside of regular fixture times due to the limitations of having a single court. This project will necessitate the relocation of turf cricket nets at the reserve.

Total project cost: $200,000

Funding sources: $60,000 Grant, $80,000 Club, In-kind (Club) - $5,000

Council contribution required: $55,000

Preferred Applications

A summary of the projects, costs and funding contributions is provided below:

COMMUNITY FACILITIES FUNDING PROGRAM: MAJOR FACILITIES CATEGORY

PROJECT / GRANT NAME

PROJECT COST

GRANT AMOUNT REQUESTED

PROJECTED COUNCIL CONTRIBUTION

PROJECTED COMMUNITY CONTRIBUTION

Geelong Criterium Circuit Pavilion

$1,400,000

$466,000

$934,000

NIL

 

COMMUNITY FACILITIES FUNDING PROGRAM: MINOR FACILITIES CATEGORY

PROJECT / GRANT NAME

PROJECT COST

GRANT AMOUNT REQUESTED

PROJECTED COUNCIL CONTRIBUTION

PROJECTED COMMUNITY CONTRIBUTION

Regional Paddle Sports Pavilion Redevelopment

$300,000

$80,000

$115,000

$105,000

Barwon Heads Village Park Playground Upgrade

$250,000

$70,000

$180,000

NIL

Eastern Park Tan Track Development

$150,000

$50,000

$100,000

NIL

 

COMMUNITY FACILITIES FUNDING PROGRAM: SOCCER FACILITIES CATEGORY

PROJECT / GRANT NAME

PROJECT COST

GRANT AMOUNT REQUESTED

PROJECTED COUNCIL CONTRIBUTION

PROJECTED COMMUNITY CONTRIBUTION

Barwon Heads Village Park Soccer Field Upgrade

$200,000

$100,000

$100,000

NIL

 

COMMUNITY FACILITIES FUNDING PROGRAM: PLANNING CATEGORY

PROJECT / GRANT NAME

PROJECT COST

GRANT AMOUNT REQUESTED

PROJECTED COUNCIL CONTRIBUTION

PROJECTED COMMUNITY CONTRIBUTION

Greater Geelong Recreation & Leisure Needs Study

$100,000

$30,000

$70,000

NIL

 

COUNTRY FOOTBALL & NETBALL PROGRAM

PROJECT / GRANT NAME

PROJECT COST

GRANT AMOUNT REQUESTED

PROJECTED COUNCIL CONTRIBUTION

PROJECTED COMMUNITY CONTRIBUTION

Herne Hill Reserve Netball Court Upgrade

$200,000

$60,000

$55,000

$85,000

Revision of Project Selection and Endorsement Process

SRV provides Councils with a number of opportunities to apply for funding for facility projects each year. SRV requires Councils to seek expressions of interest (EOI) from sporting clubs and community groups, evaluate projects and submit applications to SRV for funding consideration. Council officers also review reserve master plans and strategic documents to identify eligible projects. The general timeframe to run this process is 12 weeks, allowing for the following steps:

In recent funding rounds, Council has been given considerably less than 12 weeks by SRV to submit projects. This has led to Council running shortened expression of interest and evaluation processes, as well as requiring the development of applications during the Council report process. This has negatively affected the community’s ability to submit sufficiently developed projects and has impacted on Councils ability to give due consideration to potential funding submissions.

In an effort to address this, Council has run its expression of interest process prior to the official release of the funding program guidelines from SRV. While this assists in allowing the time necessary to complete the expression of interest and application processes, it 1) is reliant on early advice from the funding agency regarding timeframes for applications, and 2) exposes Council to changes in funding program guidelines.

The requirement to submit a Council report seeking endorsement for projects prior to making submissions to SRV (and other funding agencies) impacts on Councils ability to respond to funding opportunities in a timely manner as they arise.

The recommendation of this report is to allow Council’s Sport & Recreation Department to run the following process for external funding opportunities without the requirement to submit a report to Council seeking formal endorsement:

  1. Seek EOIs from sporting clubs/community on an ongoing basis

  2. Community and Council informed of the deadline for EOIs based on SRV funding program due dates

  3. Evaluation of EOIs against funding program criteria and Council requirements

  4. Discussion with funding agency regarding potential funding submissions

  5. List of EOIs submitted in each ward sent to each Ward Councillor

  6. Recommendations for preferred projects established

  7. Recommended projects discussed with Sport & Recreation Portfolio Councillor (including discussion on Council funding contributions)

  8. Recommended projects discussed with Ward Councillors where relevant (including discussion on Council funding contributions)

  9. Confirm projects to be developed

  10. Development of applications for formal submission to the funding agency

  11. Projects contribution requirements submitted for Council budgetary consideration

The revised process will allow greater flexibility in responding to funding program timeframes and an increased ability to engage the community in Council’s expression of interest processes. The revised process will keep Councillors informed of EOI timeframes and potential projects in their respective wards.

Environmental Implications

There are no foreseeable environmental implications associated with this report, however during the assessment process, projects that included environmentally sustainable design initiatives were highly regarded.


Financial Implications

There are no immediate financial implications associated with adopting the recommendations of this report.

If funding submissions to SRV are successful, Council shall have to make a commitment to relevant projects for the 2014/15 financial year which would be determined via the budgetary process.

Support for projects within the Community Facility Funding Program (Minor Facilities & Soccer categories) and Country Football Netball Program have been expressed by the relevant the Ward Councillors.

  

Policy/Legal/Statutory Implications

There are no legislative or legal ramifications associated with adoption of this report.


Officer Direct or Indirect Interest

No Council staff or persons engaged in the evaluation of project registrations, development of recommendations or development of this report have a direct or indirect interest in the matters considered within the report.


Risk Assessment

There are no immediate risks associated with this report. A component of some projects may entail relevant risk management matters pertaining to the projects.


Social Considerations

The recommended projects will encourage the development of innovative community sport and leisure facilities. The expected population growth within the municipality necessitates the increased and improved provision of community sport facilities that provide a social outlet for the local community.

Participation in sport and recreational activities has long been recognised as an important contributor to community health and well being.

Benefits of physical exercise and recreation are well documented and include improved health and fitness, development of social skills, increased community connectedness and enhanced self-esteem. Thus an application for SRV funding for community recreation projects has significant social benefits.

Communication

Council’s project registration process for the various funding opportunities discussed in this report was open to sporting clubs and community groups between 3 April 2013 and 24 April 2013. Council has used a range of communication methods to inform clubs and community groups of the process for projects to be registered and the associated timeframe (as outlined below).

In addition to the project registration process, staff from the Sport and Recreation Department of Council have investigated, and are aware of potential projects that fit within the funding programs discussed in this report through liaison with sporting clubs and community groups.

Council staff also discussed projects with a range of sporting clubs and community groups during the project registration period to provide advice on developing projects.

The guidelines for SRV’s Community Facility Funding Program were released on 6 May 2013.
[Back to List]

6. Contractual Matter (Confidential)

Portfolio:

Major Events - Cr Nelson

Source:

Projects, Recreation & Central Geelong / Events

General Manager:

Dean Frost

Index Reference:

Subject: Events


Summary

Cr Heagney moved, Cr Ansett seconded -

That in accordance with Section 89 (2) (d) of the Local Government Act 1989, this contractual matter be considered at the conclusion of all other business at which time the meeting be closed to members of the public.

Carried.


[Back to List]