  1. Amendment C288 Adventure Park, Bellarine Highway, Wallington – Consideration of Panel Report and Adoption

  2. Amendment C299: 77-79 Draper Street and 128-130 Asbury Street East, Ocean Grove – Panel Report and Adoption

  3. Amendment C59 – Protection of the Emergency Medical Services Helicopter Flight Paths at Geelong Hospital

  4. Central Geelong Zoning Provisions Review

  5. Flinders Peak Secondary College Options Analysis

  6. Community Engagement Policy

  7. Consideration of Tender Submissions for Tender T1400052 – Design and Construction of an Iconic Christmas Tree



1. Amendment C288 Adventure Park, Bellarine Highway, Wallington – Consideration of Panel Report and Adoption

Portfolio:

Planning – Cr Heagney

Source:

Planning & Tourism – City Development

General Manager:

Peter Bettess

Index Reference:

Application: 288/2014


Purpose

The purpose of this report is to enable Council to consider the Panel Report to Planning Scheme Amendment C288 applying to the Adventure Park land at Wallington and to adopt the Amendment.


Summary

Cr Macdonald moved, Cr Ellis seconded -

That Council:

  1. adopts Amendment C288 as outlined in Appendix 4 of this report; and

  2. submits the adopted Amendment with the prescribed information to the Minister for Planning requesting approval.

Carried.


Background

Amendment C288 resulted from an application made by Collie Planning P/L on behalf of Adventure Park P/L (owned by the Salmon family) to rezone their 72.4 ha site from Farming Zone to Comprehensive Development (CDZ) zone, insert a new Schedule 3 to the CDZ and incorporate the Adventure Park Comprehensive Development Plan into Clause 80.01 of the Planning Scheme.

The subject land is occupied by a major water based theme park along the Bellarine Highway/Swan Bay Road frontages whilst the balance of the site is generally cleared ex-farming land. Adventure Park is already a major tourist attraction on the Bellarine Peninsula and is Victoria’s biggest theme park. It currently operates between October and April each year, with the busiest time being warm summer days at weekends and in holiday periods.

Adventure Park is in an area generally surrounded by farmland within a Farming zone. On the south side of both Swan Bay Road and the Bellarine Highway the land is zoned Rural Living and occupied by dwellings on 2 – 4 ha lots. Immediately opposite the site at Bellarine Highway Swan Bay intersection Council has recently issued a permit for a cidery/restaurant.

Appendix 1 shows the current zoning of the land and surrounding area. Appendix 2 is an aerial photo of the same area. Amendment C288 recognises the substantial recreation and tourist facility on the land and rationalises the planning approval process for the ongoing future development of the land.

Amendment C288 was placed on exhibition from 12 December 2013 until 27 January 2014. Notices where placed in the Geelong Advertiser and Independent and sent to all nearby owners and occupiers and all relevant public authorities.

As a result of the exhibition of the Amendment the Council received a total of 10 submissions of which 5 either supported or offered no objection (applicant and public authorities) and 5 nearby landowners who either objected or raised some points of objection to the amendment.

The main points raised in the objecting submissions were:


Discussion

The Council considered the submissions at its meeting on 11 March 2014 and resolved to refer them to an Independent Panel appointed by the Minister for Planning.

The main thrust to the Council’s resolution and its subsequent presentation to the Panel proposed the inclusion of additional provisions in the accompanying zone Schedule and changes to the Comprehensive Development Plan to directly address the above concerns raised by nearby landowners.

A Directions Hearing on 10 April 2014 and the Panel Hearing on 1 May 2014 were both conducted at Council offices. The Council, applicant and two nearby residents made presentations to the Panel.

The Panel report recommends the Amendment be adopted with the additional provisions proposed by Council (which have been agreed to by the applicant) together with some additional minor modifications.

A copy of the Panel’s report has previously been circulated to all Councillors. Appendix 3 is Section 7 Conclusions and Recommendation of the Panel’s report.

The Panel’s recommendations are supported and the modified Amendment can now be adopted. Appendix 4 is the Amendment recommended for adoption. Appendix 5 is the updated Comprehensive Development Plan.

Changes made to the exhibited amendment documentation to address issues raised in the submissions include:


Environmental Implications

The subject land comprises the existing Adventure Park surrounded by cleared land previously used for farming. Future development of the site will have no adverse environmental impacts.


Financial Implications

Amendment C288 has no financial implications.


Policy/Legal/Statutory Implications

The Panel concurs with Council that the Amendment is generally consistent with State and Council planning policies which are supportive of tourist development and protection of high quality natural landscapes. The Adventure Park site is well clear of any future planned urban settlements on the Bellarine Peninsula and as such the proposed Amendment is consistent with planning strategies in Clause 21.14 Bellarine Peninsula.


Alignment to City Plan

Amendment C288 supports the Growing our Economy strategic direction of City Plan, in particular the priorities of supporting the growth of existing businesses and promotion of tourism to attract visitors to the region.


Officer Direct or Indirect Interest

No Council Officers have any direct or indirect interest, in accordance with Section 80 (c) of the Local Government Act, to which this Amendment relates.


Risk Assessment

No risks have been identified in processing Amendment C288 and adopting it as recommended by an Independent Panel.


Social Considerations

Adventure Park is an already popular recreation and tourism facility. Its expansion will further increase the recreational opportunities for Geelong residents and visitors, create further short and long term employment opportunities and generate benefits to the wider Geelong economy.


Human Rights Charter

Amendment C288 does not impact on any basic rights, freedoms and responsibilities as set out in the Charter. Planning legislation ensures an open community consultation process enabling people to freely express their views and obtain a fair hearing before an Independent Panel.


Consultation and Communication

Full public notification of the Amendment has been given in accordance with the provisions of the Planning and Environment Act. All adjoining and nearby residents received direct notification of the exhibition of the Amendment and provided an opportunity to present their submission to an Independent Panel appointed by the Minister for Planning.


Appendix 1 – Current Zoning

Current Zoning

Appendix 2 – Aerial Photograph

Aerial Photograph

Appendix 3 – Panel Conclusions and Recommendation

7. CONCLUSIONS AND RECOMMENDATIONS

Adventure Park is an established, high quality tourist establishment located on a highly accessible site on the Bellarine Peninsula. Although it is located within a predominantly rural area it does not detract from the character of that area.

Amendment C288 has been proposed in order to facilitate the ongoing operation and development of Adventure Park under a more appropriate zoning and control regime. The Amendment proposes to include land in the ownership of Adventure Park in a Comprehensive Development Zone, which will provide a degree of certainty as to the land onto which Adventure Park can expand and the general locations on that land where recreational activities and ancillary uses may be developed.

Given that future development will occur over an extended period, it is unreasonable to expect that the precise detail of that development be provided at this stage. As a consequence, the zoning the Amendment proposes provides a degree of flexibility as to the form and precise location of future development. However, the detail lacking at this stage will be required at the time new development is proposed in the form of precinct masterplans. In the assessment of these masterplans, an opportunity will be provided for community input.

The Panel, having considered the submissions and evidence put to it, has concluded as follows:

Based on the reasons set out in this Report, the Panel recommends:

Greater Geelong Planning Scheme Amendment C288 should be adopted as exhibited, subject to changes set out in the following recommendations:

  1. The Comprehensive Development Plan should be replaced by the version attached to the evidence of Mr Collie entitled ‘Adventure Park Comprehensive Development Plan April 2014’. This version should be properly referenced in Schedule 3 to the Comprehensive development Zone and in the Schedule to Clause 81.01

  2. The exhibited version of Schedule 3 to the Comprehensive development Zone should be replaced by the Council’s ‘Post Exhibition Version’ but amended further to:

    1. Alter the condition in the Table of uses, Section 1, applying to Camping and caravan park to read “must be in the form of cabins (and not tents, caravans or campervans”.

    2. Alter the provisions of Clause 2.0 Masterplan, to include the following requirement:

      “Prior to considering any request to approve or amend a Masterplan the responsible authority must:

      • notify the owners and occupiers of adjoining land and provide them an opportunity to provide comment within 14 days; and

      • publish a notice of the proposed Masterplan in a newspaper circulating in the area inviting comment from people likely to be adversely impacted within 14 days.

      In deciding whether or not to approve or amend the Masterplan the responsible authority must consider any comments received.”

    3. Alter the wording of the final dot point in Clause 5.0 Buildings and works, to read:

      “Accommodation not exceeding 15 metres in height above the natural ground level or otherwise as specified in an approved Masterplan"

    4. Number the sections titled ‘Exemption from notice and review’ and ‘Information to be provided’ as Clauses 6.0 and 7.0 respectively.


Appendix 4 – Amendment Documents for Adoption

Planning and Environment Act 1987

GREATER GEELONG PLANNING SCHEME AMENDMENT C288

INSTRUCTION SHEET

The planning authority for this amendment is Greater Geelong City Council

The Greater Geelong Planning Scheme is amended as follows:


Planning Scheme Maps

The Planning Scheme Maps are amended by a total of one attached map.

Zoning Maps

Planning Scheme Map No. 70 in the form of the attached map marked “Greater Geelong Planning Scheme, Amendment C288”


Planning Scheme Ordinance

The Planning Scheme Ordinance is amended as follows:

  1. In Zones – following Clause 37.02, insert a new Schedule 3 in the form of the attached document.

  2. In Incorporated Documents – Clause 81.01, replace the Schedule with a new Schedule in the form of the attached document.

End of document


Amendment C288 - Comprehensive Development Zone - Schedule 3

 

SCHEDULE TO CLAUSE 81.01

 

12/09/2013
C243 C288

Name of document

Introduced by:

 

14 Shepherd Court, North Geelong, Cotton On Office Redevelopment, July 2011

C257

 

Adventure Park Comprehensive Development Plan May 2014

C288

 

Advertising Sign Guidelines, City of Greater Geelong, November 1997.

NPS1

 

Armstrong Creek East Native Vegetation Precinct Plan, May 2010

C206

 

Armstrong Creek East Precinct Structure Plan, May 2010 Amended November 2011.

C214

 

Armstrong Creek East Precinct Development Contributions Plan, Version 4.1 Alternate Version November 2011.

C214

 

Armstrong Creek North East Industrial Precinct Development Contributions Plan, May 2010.

C207

 

Armstrong Creek North East Industrial Precinct Growling Grass Frog Conservation Management Plan, May 2010.

C207

 

Armstrong Creek North East Industrial Precinct Native Vegetation Precinct Plan, May 2010.

C207

 

Armstrong Creek North East Industrial Precinct, Precinct Structure Plan, May 2010.

C207

 

Armstrong Creek Urban Growth Plan Framework Plan, November 2008, Updated September 2012

C240

 

Armstrong Creek West Precinct Development Contributions Plan, February 2013

C240

 

Armstrong Creek West Precinct Native Vegetation Precinct Plan, November 2012

C240

 

Armstrong Creek West Precinct Structure Plan, September 2012

C240

 

Australian Standard AS 2021-1994, Acoustics - Aircraft Noise Intrusion - Building Siting and Construction. Standards Association of Australia 1994.

NPS1

 

Environmental Weeds, City of Greater Geelong, September 2008

C129 (Part 1)

 

Geelong City Urban Conservation Study Vol. 1 Restoration and Infill Guidelines, Commercial and Civic Buildings, Graeme Butler for the City of Geelong, 1993

C258

 

Geelong Library and Heritage Centre Redevelopment, March 2013

C287

 

Geelong Ring Road – Section 4C Incorporated Document, June 2010.

C232

 

Geelong TAC Office Development, October 2006.

C142

 

Heritage and Design Guidelines, City of Greater Geelong, 1997.

NPS1

 

Key Development and Increased Housing Diversity Areas, July 2009, updated 2012.

C254

 

Jetty Road Urban Growth Area Development Contributions Plan, September 2011

C230

 

Melbourne Geelong Interconnection Project, June 2010.

C229

 

Native Vegetation Precinct Plan, Geelong Ring Road Employment Precinct, March 2013

C243

 

Newtown Heritage Study Review Report, Volume 3, City of Greater Geelong, 2008

C191

 

New Station Estate Restructure Plan, July 2010

C187

 

Rail Infrastructure Projects (comprising the Rail Gauge Standardisation Project, the Regional Fast Rail Project and the Fibre Optic Project), December 2002.

VC17

 

Rail Upgrades at Geelong Port Project, May 2010.

C211

 

Rippleside Comprehensive Development Plan, February 2000.

C2

 

Rippleside Urban Design Guidelines, June 2000.

C2

 

Thirteenth Beach Golf Resort Barwon Heads, Barwon Heads Comprehensive Development Plan, Land Design Partnership, Anthony Cashmore & Associates and the Planning Group, May 2001 amended September 2006.

C54

 

Waterfront Geelong Design and Development Code, Keys Young, July 1996

NPS1

 

West Fyans-Fyans Street Precinct Structure Plan, June 2009

C205



Schedule 3 to the  Comprehensive Development Aone - Page 1 of 6
Schedule 3 to the  Comprehensive Development Aone - Page 2 of 6
Schedule 3 to the  Comprehensive Development Aone - Page 3 of 6
Schedule 3 to the  Comprehensive Development Aone - Page 4 of 6
Schedule 3 to the  Comprehensive Development Aone - Page 5 of 6
Schedule 3 to the  Comprehensive Development Aone - Page 6 of 6

Appendix 5 – Comprehensive Development Plan Map May 2014

Comprehensive Development Plan Map May 2014
[Back to List]

2. Amendment C299: 77-79 Draper Street and 128-130 Asbury Street East, Ocean Grove – Panel Report and Adoption

Portfolio:

Planning - Cr Heagney

Source:

Planning and Tourism

General Manager:

Peter Bettess

Index Reference:

Application: 299/2014


Purpose

The purpose of this report is to enable Council to consider the Panel report for Amendment C299 which proposes the rezoning of the ex-netball courts in Draper Street and Asbury Street East, Ocean Grove and to adopt the Amendment.


Summary

Cr Farrell moved, Cr Macdonald seconded -

That Council:

  1. Adopts Amendment C299 as outlined in this report; and

  2. Submits the adopted Amendment together with the prescribed information to the Minister for Planning requesting approval.

Carried.


Background

Council is the proponent for Amendment C299 which rezones 4 residential properties situated at 77 – 79 Draper Street & 128 – 130 Asbury Street, Ocean Grove from Public Park and Recreation zone to General Residential 2 zone. It is also proposed to extend Design and Development Overlay 14 (the 7.5 metres permit height trigger) over the land to be rezoned.

For many years these properties were used for recreational purposes and are occupied by netball courts and a small clubrooms. The courts have protective mesh fencing on 3 sides and six pole mounted lights. Each of the 4 separately Titled lots is approximately 807 sq metres (total area 3228 sq metres).

As a result of the construction of the new netball facility at the Shell Road Recreation facility the old courts are no longer required. Following the rezoning of this land it is Council’s intention that it be sold. (Item 4, Council Minutes of meeting 27 August 2013).

The Council has given public notice of its intention to sell the land pursuant to Section 189 of the Local Government Act. Submissions were heard by the Submissions Hearing Panel on 3 June and are subject to a separate report to a Council meeting.

Appendix 1 shows the land subject of the rezoning application and existing zonings.

Appendix 2 shows the subject land and the surrounding area which is predominantly used for residential purposes other than the substantial Memorial Reserve (2.4ha) located on the south side of Draper Street opposite the subject land.

In considering whether to pursue this rezoning proposal, Council had regard to whether or not this immediate area would be adequately served with local open space. In this case, it is considered there is no shortage of open space in the immediate area with residents having easy access to:

The rezoning proposal is consistent with the Ocean Grove Sporting Infrastructure Plan dated May 2010 which proactively plans for the formal outdoor sporting needs of current and future residents of Ocean Grove, with particular emphasis on the town’s major active recreation reserves i.e. Shell Road, Collendina and Memorial Reserves.

As part of the background research, this report notes (page 17) that the Bellarine Peninsula Recreation and Leisure Needs Study 2005 refers to selling the old netball courts following their relocation to Shell Road to help offset the costs of the new facility developments. The Infrastructure Plan (page 34) also makes reference to the inadequate facilities and amenities at the existing site and the constraint on further development being wedged between residential properties.


Discussion

Amendment C299 was placed on exhibition between 31 October 2013 and 2 December 2013. Notices were placed in the Geelong Advertiser, Independent and Ocean Grove Voice and sent to all nearby owners and occupiers and all relevant public authorities.

As a result of the exhibition of the Amendment the Council received a total of 19 submissions. Of these, 4 either supported the Amendment or offered no objection and 15 objected to the Amendment.

Three supporting submissions argue that the land is very suitable to provide for future residential development for people with a disability which will be a benefit to the Ocean Grove community.

Objecting submitters consider there has been inadequate community consultation and that with the continuing growth of the town the land should be retained for future recreational and/or community use.

The issues raised in the submissions where considered by Council at its meeting on 11 February 2014. Council resolved to refer all submissions to an Independent Panel appointed by the Minister for Planning.

A Directions Hearing on 14 March 2014 and the Panel Hearing on 16 March 2014 were both conducted at Council offices in Geelong. The Council, as both applicant and planning authority, made presentations to the Panel, as did five residents (one supporting use of the land for housing people with disability, four objecting and arguing the land should be retained for open space/recreational purposes).

The Panel report recommends that the Amendment be adopted. It finds that the rezoning of the land is consistent with adopted Council strategic recreational strategies being the Bellarine Peninsula Recreation and Leisure Needs Study 2005 and the Ocean Grove Sporting Infrastructure Plan, both of which make reference to the prospect of selling the land occupied by the old netball courts when the new facility at the Shell Road Recreation Reserve is completed. It also finds that this area is well served by existing open space at Memorial Reserve and Arthur Powell Reserve.

A copy of the Panel’s report has previously been circulated to all Councillors. Appendix 3 is Section 6 Conclusions and recommendations of the Panel’s report. The Panel’s report was publicly available on the Council’s website.

The Panel’s recommendation is supported and therefore the Amendment can be adopted. Appendix 4 is the Amendment recommended for adoption. The subject land is proposed to be included in the GRZ2 zone (as distinct from the exhibited GRZ) in accordance with the future zoning of the surrounding R3 zoned area and as per Council’s presentation to the Panel.


Environmental Implications

The proposed rezoning has no environmental implications


Financial Implications

The proposed rezoning provides a positive financial outcome for Council in that it will enable it to sell land no longer required for recreational purposes.


Policy/Legal/Statutory Implications

Under the Local Government Best Practice Guideline for the Sale and Exchange of Land, the Council is required to ensure that “…….prior to being offered for sale, property should be appropriately zoned. This will ensure that the ultimate use of the land is determined by that zone and the highest possible sale price is achieved”.

The proposed amendment is not inconsistent with any State or Council planning policies. To the extent which these policies advocate the benefits of urban consolidation, this amendment will enable infill development to occur in a location which excellent accessibility to all urban facilities and services.

The Panel has determined that “the Amendment has been prepared following a thorough strategic planning process”.


Alignment to City Plan

The proposal is consistent with the Community Wellbeing strategies of City Plan which are directed at delivering a network of open space and sporting facilities to keep people active. It is consistent with the Municipal Strategic Statement and Bellarine Peninsula Strategic Plan which are listed strategies in delivering community wellbeing priorities.


Officer Direct or Indirect Interest

No Council Officers have any direct or indirect interest, in accordance with Section 80 (c) of the Local Government Act to which this Amendment relates.


Risk Assessment

No risks have been identified regarding the rezoning of this land.


Social Considerations

There is ample existing remaining recreational land in the immediate neighbourhood to meet the requirements of surrounding residents.

The site is well located for infill residential development with good accessibility to the town’s community and commercial facilities and services.


Human Rights Charter

The proposal does not impact on any human rights and responsibilities set out in the Charter. Planning legislation ensures an open community consultation process enabling people to freely express their views and if necessary obtain a fair hearing before an Independent Panel.


Consultation and Communication

The Amendment has been exhibited in accordance with the provisions of the Planning and Environment Act to provide for full public comment. As part of this process direct written notification was provided to all adjoining and nearby property owners potentially affected by the Amendment.

All submitters have been provided with an opportunity to appear before an Independent Panel appointed by the Minister for Planning.


Appendix 1 Existing Zones

Existing Zones

Appendix 2 – Aerial Photo

Aerial Photo

Appendix 3 – Panel Conclusion

6. CONCLUSIONS AND RECOMMENDATIONS

The Panel finds that the Amendment is consistent with the Council’s strategic recreational strategies for Ocean Grove and the Bellarine Peninsula area. The Amendment has been prepared following a thorough strategic planning process.

The decision to rezone the land (and potentially sell) has been based on the recommendations of well researched reports that have undergone extensive public consultation. Many of the recommendations in the reports have been implemented, or are soon to be.

The Council has determined that the land is no longer required as a netball facility, particularly as the new facilities have been completed and expanded at the Shell Road site. The land is within very close proximity to, and well served by, existing open space at Memorial Reserve and the Arthur Powell Reserve.

The task of the Panel has been to determine whether the proposed General Residential Zone is the most appropriate zone for the land at 77-79 Draper Street and 128-130 Asbury Street East, Ocean Grove, if the land is to be sold.

For the reasons outlined in this report, the Panel recommends that Amendment C299 to the Greater Geelong Planning Scheme should be adopted as exhibited.


Appendix 4 - Amendment

Planning and Environment Act 1987

GREATER GEELONG PLANNING SCHEME AMENDMENT C299

INSTRUCTION SHEET

The planning authority for this amendment is Greater Geelong City Council.

Planning Scheme is amended as follows:


Planning Scheme Maps

The Planning Scheme Maps are amended by a total two (2) attached map sheets.

Zoning Maps

  1. Amend Planning Scheme Map No 81 in the manner shown on the one attached map marked “Greater Geelong Planning Scheme, Amendment C299”.

Overlay Maps

  1. Amend Planning Scheme Map No 81 DDO14 in the manner shown on the one attached map marked “Greater Geelong Planning Scheme map marked Greater Geelong Planning Scheme, Amendment C299”.

End of Document


Amendment C299 - General Residential Zone - Schedule 2
Amendment C299 - Design and Development Overlay - Schedule 14


[Back to List]

3. Amendment C59 – Protection of the Emergency Medical Services Helicopter Flight Paths at Geelong Hospital

Portfolio:

Planning - Cr Heagney

Source:

Planning and Tourism - City Development

General Manager:

Peter Bettess

Index Reference:

Application C059


Purpose

The purpose of this report is to seek Council’s support for an amendment to the Greater Geelong Planning Scheme to implement design and development overlays to protect the flight paths to the current and future emergency helipads at the Geelong Hospital.


Summary

Cr Macdonald moved, Cr E Kontelj seconded -

That Council:

  1. supports the preparation of a planning scheme amendment C59 to apply design and development overlays to the flight paths of the emergency helipads at the Geelong Hospital;

  2. supports the amendment being considered by the Minister for Planning and proceeding as a section 20(4) amendment under the Planning and Environment Act 1987;

  3. recommends that the Department of Health undertake a consultation process with the local community about the project.

Carried.


Background

Council has received correspondence from the Department of Health seeking the support of the City of Greater Geelong to undertake a Section 20 (4) Ministerial amendment to protect the flight paths of the Emergency Medical Services (EMS) helicopters that fly to and from Geelong Hospital. Appendix 1 shows the location of the helipad.

The DoH seeks Councils support on the planning controls amendment process as these controls have been tested and have used successfully throughout the State.

As outlined in the correspondence,

“The Department has developed a state−wide helipad strategy that has as a key objective the protection of the long−term viability of the air ambulance helicopter network in Victoria. Geelong Hospital is part of this state−wide network of public facilities that provide vital air ambulance services to trauma and seriously ill members of the community. Therefore it is important to protect the safety, availability and efficiency of this vital emergency medical service provided by the air ambulance helicopters.

Geelong Hospital is currently serviced by air ambulance helicopters using a ground level concrete helipad on the southern side of the hospital, adjacent to Myers Street. Whilst helicopter EMS flights continue to use the existing ground level facility, the location and proximity of adjacent buildings and trees create operational constraints on helicopter flights.

Given the impetus to promote growth within Geelong and its strategic location as one of the largest regional areas west of Melbourne, the EMS helipad will serve a large and growing catchment. Long term protection of the EMS helicopter flight paths will ensure that this essential service is available for current and future generations. A key injection of investment into community infrastructure has occurred on site with Barwon Health currently undertaking major extension works to Geelong Hospital. The new Emergency Department located on Ryrie Street will include the potential to provide a future rooftop helipad to serve the hospital. The provision of a future rooftop facility will overcome the current restrictions and permit flights to be conducted in Performance Class 1 helicopters. However the realisation of a future rooftop facility is dependent upon funding. Once this has occurred and the helipad has been constructed, the proposed controls relating to the ground level helipad will no longer be applicable.

The Department seeks to protect this airspace through the Greater Geelong planning scheme via a Design and Development Overlay (DDO) control. Discussion has occurred with your officers on this matter as well as planners at the regional office of the Department of Transport, Planning and Local Infrastructure and we understand a recommendation is to be put to Council to approve the proposed Ministerial amendment process.

It must be noted that the Department does not seek to inhibit development surrounding the hospital. Rather we seek to be a referral authority to ensure that the overall usability of the helipad meets the 98% value adopted for EMS helicopters. In most cases, provided the overall usability of the helipad is maintained, referred applications will generally be accepted with the position and height of the building incorporated into the Australian Air ambulance database.

The EMS helicopters play a key role in providing medical and trauma services to patients who are critically ill and involved in accidents within the Greater Geelong and wider area. The service is one of regional significance and achieves regional planning objectives by ensuring safe access to community infrastructure for all members of the wider area. We consider that whilst the facility may be located in Geelong, the ability to transport critically ill and injured people to hospital has impacts far beyond the immediate area.

Prior to approval we would support consultation with the community in relation to the proposed controls and will work with your officers on the format of how this information is provided to the properties impacted by the overlay controls. Any responses to the views of affected parties will be provided to Council and the Department of Transport, Planning and Local Infrastructure prior to consideration by the Minister for Planning.

The matter is one where the Department of Health seeks to ensure the future health of Victorians is protected by delivering an important trauma service. By allowing the Department of Health to consider the heights of potential structures within the helicopter flight paths through the referral process, the DDO's will ensure the long term protection of this community service for the benefit of Greater Geelong and the wider area.”

Discussion

The DoH has identified the need for the amendment due to the increasing development occurring in Geelong as well as the potential for redevelopment of the existing helipad site. The current helipad occupies valuable space that can be developed for other hospital related purposes.

Amendment C59 will trigger a planning application for high development and referral to the DoH within the boundaries of three new Design and Development Overlays (DDOs) into the Planning Scheme as follows:

It should be noted that the DDOs for the ground level helipad will not be required once a new rooftop helipad is operational.

There is precedence for this type of control, with it being successfully implemented in other planning schemes including at Ballarat, Traralgon, Cowes, Kilmore and Seymour.

The areas proposed to be affected by the DDOs were mapped by applying standard requirements for EMS helipad flightpath protection and then tailored to suit local conditions around the Geelong Hospital in terms of wind, topography and existing buildings.

The key purpose of each DDO is to trigger a planning permit requirement for structures over a certain height and to include a mandatory referral to the Department of Health for assessment and comment. The DDOs are considered the most effective and proven method for protecting the EMS flightpaths from any obstructing structures.

DDO Boundaries

Three DDOs are proposed. The boundaries for these have been selected on the technical advice provided by PSNK Aeronautical Services (technical report to DoH).

The associated flightpath footprints have been defined relative to the helipad location with reference to three separate areas:

Area H1

The area in the immediate proximity to the ground level helipad within which the initial take-off phase of flight and the approach phase of flight are performed. This nominated area is a circular region within 250 metres of the helipad which has been truncated to reflect the location of existing buildings to the north and west of the helipad.

Area H2

The area in the approach and take-off flightpath extending from the boundary of the ground level helipad H1 area to a nominal distance of 926 metres (0.5 nautical miles) from the helipad where the protected airspace associated with the helicopter flight paths would exceed an elevation of 40 metres above the helipad.

Area H3

The area adjacent to the approach and take-off flightpaths tracks extending from the rooftop helipad to a nominal distance of 926 metres (0.5 nautical miles) from the helipad where the protected airspace associated with the helicopter flightpaths would exceed an elevation of 40 metres above the helipad.

The boundaries of the DDOs generally follow block, street and zone extents for ease of reference by landowners and Council.

Appendix 2 shows the extent of the proposed overlay areas. The areas affected include residential, commercial and mixed use land uses, and affected both public and private land.

DDO requirements

Any application for buildings and works over certain heights are to be referred to the Department of Health. The specialist advice to be provided by the DoH will help guide Council in assessing the application.

In large part, all three DDOs contain the same information in the design objectives, buildings and works, referral of applications and decision guidelines sections. Where they differ is in the height for which a planning permit is triggered. The planning permit trigger for development in each of the three DDOs is:

All applications for development at or above these heights will be referred to the Department of Health for consideration.

Applications made under the DDO will be exempt from the notice and review requirements of the Planning and Environment Act. With this provision in mind, officers recommend that the Department of Health undertakes a consultation process with the community about the project.

The amendment will provide protection for the flight paths used by emergency medical service helicopters servicing the Geelong Hospital from encroachment by future developments that could prejudice the safety or efficiency of the helipad at the Geelong Hospital. Protection of the flight paths are crucial to ensure that the Geelong community and wider region have the benefit of a helicopter service that is safe and efficient and responsive to emergency medical needs. Controls on high new buildings and works within the flight paths are essential to protect the long term viability of the helipads and associated flight paths.

Referral of an application for new buildings and works to exceed the designated heights is required to allow the Department of Health to determine if an application might affect the safety of helicopter operations.

Appendix 3 outlines the proposed Design and Development Overlay Schedules.

Officers have reviewed the proposed Design and Development Overlay Schedules and have suggested some improvements to simplify the clauses without changing the intent or the provisions. These will be considered by the Department of Health.

Design and development overlays similar to this proposal have recently (2013) been incorporated into the Ballarat Planning scheme to protect the flight paths of the Ballarat Base Hospital. It is a technique that will allow for development to continue but for high development to obtain a planning permit and to have input from the Department of Health.

The applicant advises that in the other areas around Victoria with similar DDOs, there have been few applications made with a negligible number refused. In most cases the referral to DoH will not result in a refusal or any required changes to a proposal.

Drafting of the DDOs has sought to reduce the extent of administrative burden on Council by exempting the notice and rights of review provisions and including the views of the DoH as a decision guideline.

Conclusion

The proposed amendment is considered essential to provide long term protection of the EMS helicopter flight paths of the Geelong Hospital. The EMS helicopters provide important trauma related services to the operation of the Geelong Hospital.

The areas affected by the proposed DDOs have been reviewed in relation to Council’s strategic vision for the area and sought to minimise any potential impact on the Geelong Central Activities Area.


Environmental Implications

It is not expected that the amendment will have any undue environmental implications.


Financial Implications

The Department of Health will bear the costs of the planning scheme amendment and a community consultation process.


Pollicy/Legal/Statutory Implications

The amendment supports the strategies in the State Planning Policy Framework at Clause 18.04-3 Planning for airfields that seek to plan for area around airfields to preclude development which could prejudice the safety or efficiency on an airfield. This strategy is equally applicable to the flight paths for a helipad.


Alignment to City Plan

The ‘How we do business’ priority on lead by advocating and collaborating on issues important to the Greater Geelong community is relevant to this proposal and Council supporting the protection of the helipad flight paths for helicopter medical transport flights. The priority for an informed and engaged community will also be met by asking the Department of Health to undertake a consultation process for the proposal.


Officer Direct or Indirect Interest

No Council Officers have any direct or indirect interest, in accordance with Section 80 (C) of the Local Government Act to which this Amendment relates.


Risk Assessment

There are no risks with either implementing or not implementing the recommendations of this report.


Social Considerations

Continued safe helicopter access will provide benefits to the Geelong community and the wider western region of the State.


Human Rights Charter

Support for the Department of Health undertaking a consultation process with the local community will ensure that the proposal can be fully explained and views can be heard and addressed. The Planning and Environment Act 1987 provides for the Minister for Planning to prepare an amendment.


Consultation and Communication

Consultation and engagement with the local community about the project should be undertaken by the Department of Health as part of the preparation for making the amendment application to the Minister for Planning.


APPENDIX 1 – LOCALITY PLAN (AERIAL)

Aerial locality plan

APPENDIX 2 – EXTENT OF DESIGN AND DEVELOPMENT OVERLAYS

Extent of design and development overlays - DDO H2

Extent of design and development overlays - DDO H3

APPENDIX 3 – PROPOSED DESIGN AND DEVELOPMENT OVERLAY SCHEDULES

--/--/20--

SCHEDULE [NUMBER] TO THE DESIGN AND DEVELOPMENT OVERLAY

Shown on the planning scheme map as DDO [number].

 

EMS HELICOPTER FLIGHTPATH AREA (H1 – INNER AREA)

1.0

Design objectives

--/--/20--

To ensure that the height of new development does not encroach on the flight path airspace areas associated with the Geelong Hospital ground level helipad.

To ensure that the height of new development avoids creating a hazard to EMS helicopters operating in the vicinity of the Geelong Hospital helipad and to facilitate safe emergency medical service helicopter flight operations.

2.0

Buildings and works

--/--/20--

A permit is not required to:

  • construct a building or to construct or carry out works with a constructed height less than 8.1 metres above the adjacent natural ground level.

  • Subdivide land

For the purposes of this clause, buildings and works include fences, radio masts, television antennae and flagpoles and any construction equipment associated with the buildings and works.

3.0

Referral of applications

--/--/20--

An application must be referred in accordance with Section 55 of the Act to the referral authority specified in Clause 66.04 or a schedule to that clause. Referred applications must include details of proposed development height expressed as elevations above the Australian Height Datum.The Geelong Hospital helipad is at an elevation of 32.35 metres above Australian Height Datum.

Applications will be assessed against the Department of Health (Vic) guidelines for helicopter landing sites which incorporate the requirements of the International Civil Aviation Organisations ‘Standards and Recommended Practices’ Annex 14 Volume 11 Helicopters (as amended).

4.0

Exemption from Notice and Review

--/--/20--

An application under this overlay is exempt from the notice requirements of Section 52(1)(a), (b) and (d) and the decision requirements of Section 64(1), (2) and (3) and the review rights of Section 82(1) of the Act.

5.0

Decision guidelines

--/--/20--

Before deciding on an application, the responsible authority must consider the views of the Secretary of the Department of Health.

 

EMS HELICOPTER FLIGHTPATH AREA (H2 – OUTER AREA)

1.0

Design objectives

--/--/20--

To ensure that the height of new development does not encroach on the flight path airspace areas associated with the Geelong Hospital ground level helipad.

To ensure that the height of new development avoids creating a hazard to EMS helicopters operating in the vicinity of the Geelong Hospital helipad and to facilitate safe emergency medical service helicopter flight operations.

2.0

Buildings and works

--/--/20--

A permit is not required to:

  • construct a building or to construct or carry out works with a constructed height less than 13.5 metres above the adjacent natural ground level.

  • Subdivide land.

For the purposes of this clause, buildings and works include fences, radio masts, television antennae and flagpoles and any construction equipment associated with the buildings and works.

3.0

Referral of applications

--/--/20--

An application must be referred in accordance with Section 55 of the Act to the referral authority specified in Clause 66.04 or a schedule to that clause. Referred applications must include details of proposed development height expressed as elevations above the Australian Height Datum. The Geelong Hospital helipad is at an elevation of 32.35 metres above the Australian Height Datum.

Applications will be assessed against the Department of Health (Vic) guidelines for helicopter landing sites which incorporate the relevant requirements of the International Civil Aviation Organisations ‘Standards and Recommended Practices’ Annex 14 Volume 11 Helicopters (as amended).

4.0

Exemption from Notice and Review

--/--/20--

An application under this overlay is exempt from the notice requirements of Section 52(1)(a), (b) and (d) and the decision requirements of Section 64(1), (2) and (3) and the review rights of Section 82(1) of the Act.

5.0

Decision guidelines

--/--/20--

Before deciding on an application, the responsible authority must consider the views of the Secretary of the Department of Health.

 

EMS HELICOPTER FLIGHTPATH AREA (H3 – ROOFTOP HELIPAD)

1.0

Design objectives

 

To ensure that the height of new development does not encroach on the flight path airspace areas associated with the Geelong Hospital rooftop helipad.

To ensure that the height of new development avoids creating a hazard to EMS helicopters operating in the vicinity of the Geelong Hospital helipad and to facilitate safe emergency medical service helicopter flight operations.

To ensure that the height of new development does not encroach on the flight path airspace areas associated with the Geelong Hospital rooftop helipad.

To ensure that the height of new development avoids creating a hazard to EMS helicopters operating in the vicinity of the Geelong Hospital helipad and to facilitate safe emergency medical service helicopter flight options.

2.0

Buildings and works

 

A permit is not required to:

  • construct a building or to construct or carry out works with a constructed height less than 25.0 metres above the adjacent natural ground level.

  • Subdivide land

For the purposes of this clause, buildings and works include fences, radio masts, television antennae and flagpoles and any construction equipment associated with the buildings and works.

3.0

Referral of applications

 

An application must be referred in accordance with Section 55 of the Act to the referral authority specified in Clause 66.04 or a schedule to that clause. Referred applications must include details of proposed development heights expressed as elevations above the Australian Height Datum. The design level for the Geelong rooftop helipad is at an elevation of 58.44 metres above the Australian Height Datum.

Applications will be assessed against the Department of Health (Vic) guidelines for helicopter landing sites which incorporate the relevant requirements of the International Civil Aviation Organisations ‘Standards and Recommended Practices’ Annex 14 Volume 11 Helicopters (as amended).

4.0

Exemption from Notice and Review

  An application under this overlay is exempt from the notice requirements of Section 52(1)(a), (b) and (d) and the decision requirements of Section 64(1), (2) and (3) and the review rights of Section 82(1) of the Act.

5.0

Decision guidelines

  Before deciding on an application, the responsible authority must consider the views of the Secretary of the Department of Health.

[Back to List]

4. Central Geelong Zoning Provisions Review

Portfolio:

Planning - Cr Michelle Heagney

Source:

Planning and Tourism

General Manager:

Peter Bettess

Index Reference:

Central Geelong Taskforce


Purpose

To facilitate changes to the zoning provisions applying to Central Geelong to stream line decision making consistent with the Central Geelong Action Plan.


Summary


Cr Macdonald moved, Cr Harwood seconded -

That Council requests:

  1. the Minister for Planning, pursuant to Section 20(4) of the Planning and Environment Act 1987, to prepare, adopt and approve a planning scheme amendment to the Greater Geelong Planning Scheme to introduce local VicSmart provisions to the Activity Centre Zone as identified in Appendix 1; and

  2. the Minister for Planning pursuant to Section 20(4) of the Planning and Environment Act 1987 to prepare and approve an amendment to the Greater Geelong Planning Scheme to amend the schedule to the Activity Centre Zone provisions as generally identified in this report; and in the event this request is not supported;

  3. authorisation from the Minister for Planning to prepare an amendment to the Greater Geelong Planning Scheme, and subject to authorisation, exhibit the amendment to change the schedule to the Activity Centre Zone provisions as generally identified in this report.

Carried.


Background

The adopted Central Geelong Action Plan recommended a review of the current zoning provisions relating to Central Geelong (Activity Centre Zone predominantly) with a specific focus on reviewing the notice provisions to establish a zone which is more facilitative for development in terms of timeliness and cost associated with application assessment. This was considered consistent with the broader objectives of stimulating investment and streamlining the approvals process and necessary to achieve the principle of more people living, working, living and playing in Central Geelong.

The Activity Centre Zone (ACZ) was introduced in May 2013. The zone was prepared by the state government and introduced into the planning scheme via a ministerial amendment process. The Zone combined a number of different zones and overlays applying over Central Geelong and included new Urban Design Guideline provisions. Intending to simplify planning controls in Central Geelong to a ‘one stop shop’ to make it clearer and simpler for all sectors with an interest in Central Geelong and strengthen Central Geelong as the region’s primary business and retail precinct whilst encouraging complementary mixed uses including residential.

Feedback indicates that the zone is overly complex, difficult to navigate and apply. As with all major zone changes there are some minor unintended consequences with some poorly worded decision guidelines. Since its introduction there has been a policy position shift with the development of the Action Plan and Vision 2. There is also misalignment with recent state-wide commercial zone changes which sees the ACZ in some instances being less flexible that the Commercial 1 zone for some land use types, thus disadvantaging Central Geelong. There is now a good opportunity to review the zone provisions to ensure that it operates commensurate with other Commercial zones and applies the most appropriate controls to the regions primary activity centre.

The Minister for Planning is about to introduce VicSmart, a new planning permit process for Victoria which provides for a faster planning permit process for a specific range of application classes. Council was briefed on the VicSmart provisions in August 2013. The identified classes of application are typically simpler more straight forward low impact applications. The key elements of VicSmart are 10 day turnaround times for permits (except where further information is required), the CEO or delegate is the responsible authority for the application (not the council) and notice and third party appeal rights do not apply. An overview of VicSmart is included in Attachment 1.

The VicSmart provisions will automatically apply to a range of residential, commercial and industrial zones and overlays but do not apply to the ACZ. A planning scheme amendment is required to ‘switch on’ VicSmart if they are to apply to the ACZ along with the development of specific decision guidelines. The VicSmart provisions are anticipated to be introduced in October 2014 to all planning schemes.


Discussion

VicSmart

A range of 12 minor application types will be subject to the new VicSmart provisions. Strategically VicSmart should be applied to the ACZ to ensure Central Geelong benefits from the same streamlined provisions that apply to major activity centres. Local VicSmart applications are proposed to include:

The application classes identified to apply in the ACZ have been identified on the basis that:

An analysis of the 3598 planning permit applications received between January 2012 and 30th April 2014 shows that:

Of the ACZ applications approximately 38% were required to provide notice, with 34% of these receiving objections. In most instances the number of objections was less than 3.

The recommended application of VicSmart within Central Geelong is summarised in the following table. The first two columns contain the state standard VicSmart classes and zone/overlay application. The third column includes the recommended application of the ACZ including localised variations to support greater development facilitation in Central Geelong. A suggested schedule to VicSmart and associated decision guidelines (generally based on the standard VicSmart guidelines) are included in Appendix 1. Based on the application data identified above, approximately 56% of ACZ applications would be VicSmart applications using this proposed model. based on this proposal.

It should be noted that while VicSmart proposes a faster decision making process for applications this does not imply that permits will be issued in all cases, particularly where they are inconsistent with planning policy.


Application class

State VicSmart application

Local VicSmart application in ACZ

Subdivision – boundary realignment between 2 lots

All residential, industrial and commercial zones

Yes – apply similar decision guidelines as state VicSmart provisions noting objective to avoid site fragmentation.

Subdivision of existing building/car space

All residential (except low density), industrial and commercial zones

Yes – apply similar decision guidelines as state VicSmart provisions

2 lot subdivision of approved/commenced development

All residential (except low density), industrial and commercial zones

Yes – apply similar decision guidelines as state VicSmart provisions noting objective to avoid site fragmentation.

Construct buildings or works of up to $50,000

Mixed use zone and all industrial and commercial zones

Yes – up to $250,000 – apply variation of ACZ application and decision guidelines

Applications in HO including subdivision classes above, most existing minor applications exempt from notice including external alterations to non contributory buildings, signage, demolition of outbuildings etc and solar energy facility on a dwelling

Heritage Overlay

Automatically applies, no change required.

Note: current lack of clear designation of ‘non – contributory’ places in heritage study reference documents does not readily enable inclusion of external alterations and repairs and routine maintenance without a review of the heritage reference documents and related policy.

Subdivision (as above) and buildings and works in an SBO

Special Building Overlay note: requires referral authority advice (CCMA) to be lodged with application

Automatically applies, no change required.

 

To display a sign which is not within 30m of a residential zone, is not one of a number of specific signs (including pole, sky, internally illuminated etc) and do not exceed 10m2

All industrial and commercial zones

Yes – apply decision guidelines as state VicSmart provisions along with ACZ guidelines (including urban design guidelines) for signs.

Note: The ACZ currently has the highest category of signage allowance without a permit (conditioned in most cases to a maximum size and number) this includes a single internally illuminated under verandah sign.

Reduce car parking spaces by up to 5

All Zones

Reduce (including reduce to zero) the number of carparking spaces required associated with a Section 1 use of an existing building and where there is no net loss of existing site carparking – apply decision guidelines provisions similar to state VicSmart guidelines.

Reduce loading provisions

All Zones

Automatically applies, no change required.

Other non VicSmart identified application types

 

Restaurant and Café liquor license within the hours of 7.00am to 11.00pm – apply relevant decision guidelines provisions from clause 2.27.


The Minister for Planning has more recently identified an opportunity to utilise the VicSmart provisions for Central Geelong. Accordingly it is recommended that Council request the Minister to prepare an amendment under Section 20(4) to facilitate the application of the proposed VicSmart provisions to the ACZ within the Greater Geelong Planning Scheme as part of the State implementation of VicSmart later this year. It is considered that this would represent an early first step in reviewing the scheme provisions as they apply to Central Geelong and ensure that the opportunities associated with VicSmart in other zones and centres can be quickly applied to ensure a level playing field and opportunity for further testing and enhancement.

There is a strong legislative and policy basis for the amendment including:

The proposed changes will place Central Geelong on an equal statutory planning footing with other commercial zones, help facilitate faster decision making reducing costs for proponents and providing greater certainty and encourage further investment in central Geelong.

It is considered that there are minimal negative planning implications associated with the changes identified above given the majority of proposed changes are to apply across all commercial zones across the state. However there will be some application class types that are more prevalent in Central Geelong such as parking waivers and liquor licenses that previously may have involved notice being given. Notice and referral provisions for these types will be removed under the proposed amendment changes. Applications of this nature however typically involve few appeals or only a small number of objections with decisions consistently based on policy and planning considerations.

Zone review

The Central Geelong Action Plan flagged changes to the zoning provisions relating to Central Geelong, specifically the Activity Centre Zone, to provide for a more facilitative planning framework consistent with the objectives and principles of the Action Plan.

The current ACZ while cumbersome in its current format has benefits over other planning controls:

It is proposed to prepare a planning scheme amendment which provides for a number of major changes to the ACZ to ensure that it is comparable with the purpose with the Capital City Zone and more facilitative of use and development than the Commercial 1 zone. The zone schedule will be simplified making it clearer for developers to understand council’s vision for Central Geelong.

The proposed changes include:

Given the nature of changes advice suggests that a full amendment process may be required, however strong support has been identified by the state government to provide for a more facilitative approach to embed major changes to the zone. It will take a number of months to prepare all amendment documents to ensure the most appropriate tool which has sufficient strategic justification. It is also likely that there will be associated changes and enhancements to the VicSmart provisions proposed as part of a first stage as identified in this report. To support a more efficient amendment process it is therefore recommended that the Minister be requested to prepare the amendment under Section 20(4) of the Act or alternatively if that course is not supported by the Minister undertake a standard amendment process with delegated officers seeking authorisation to prepare and exhibit an amendment consistent with the content approach identified above.

The policy justification for the proposed zone changes are similar to those identified above for VicSmart.


Environmental Implications

The proposed scheme and zone changes do not remove the requirement for consideration of environmental impacts associated with any application.


Financial Implications

The proposed staged introduction of the identified VicSmart provisions and ACZ changes are matched to existing resource capacity. A more expansive application of VicSmart to Central Geelong is likely to have implications on resource capacity to meet the reduced timeframes.

No impact to budget through initial introduction of VicSmart provisions.


Policy/Legal/Statutory Implications

Policy considerations have been identified in the main body of the report.


Alignment to City Plan

The proposed scheme changes are aligned to the City Plan’s priority to support a successful and vibrant city centre (Securing Geelong’s economic future)


Officer Direct or Indirect Interest

No officers involved in the development of this report have a direct or indirect interest the matters identified in the report.


Risk Assessment

It is considered that there are no significant risks associated with the application of VicSmart to Central Geelong. It is likely that there may be some unintended consequences more broadly with the introduction of VicSmart generally across residential, commercial and industrial zones. The most significant impact to be monitored will be the impact in resources required to manage VicSmart applications. It is considered that the risk is somewhat ameliorated with a more modest application of VicSmart to Central Geelong initially with more extensive changes to the zone to be explored via a subsequent amendment.


Social Considerations

The proposed scheme and zone changes do not remove the requirement for consideration of social impacts associated with any application. The proposed changes will have a positive social impact by encouraging a more vibrant and functional centre with stronger investment potential and job creation prospects.


Human Rights Charter

The proposal does not impact on any human rights and responsibilities set out in the Charter. The proposed VicSmart changes provide for consistent provisions across all commercial zones and in the majority of cases comprise more minor applications which are often exempt from notice or third party appeal provisions. The report proposes to implement strategic directions that have been developed through extensive community consultation.


Consultation and Communication

Council consulted widely in the development of the Central Geelong Action Plan. The Department of Planning, Transport and Local Infrastructure also undertook a consultation program for the development of the VicSmart provisions.


Attachment 1

INTRODUCTION

The Planning and Environment Amendment (VicSmart Planning Assessment) Act 2012 (the VicSmart Act) was enacted in September 2012 to allow a new streamlined permit process to be set up in planning schemes for straightforward, low impact development proposals. The new VicSmart permit process aims to:


The Planning and Environment Amendment (VicSmart Planning Assessment) Act 2012

The VicSmart Act amends the Planning and Environment Act 1987 (the Act) to enable planning schemes to set out a different procedure for classes of application where:


A NEW PERMIT PROCESS

Once VicSmart is introduced into the Victorian planning system, two permit processes will apply in Victoria – VicSmart and the regular permit process.

VicSmart is a new, shorter permit process designed specifically for simple, straightforward applications. The VicSmart process will be clearly set out in planning schemes so that councils, applicants and the community know in advance where it applies and how it works.


The two permit processes

Flowchard showing the 2 processes

Key features of VicSmart

Key features of the VicSmart process are:


Differences between the two permit processes

While the VicSmart and regular permit processes are ‘merit’ assessments where the responsible authority must use discretion in deciding whether or not to grant a permit, the processes differ in some important ways.

VicSmart has fewer steps than the regular permit process and it involves a more tightly focused planning assessment. A comparison of the differences between the two processes is summarised below.


Key differences

Steps

Requesting further information under s.54 of the Act

Regular permit process

Yes.

The statutory clock stops and the application will not be considered until the further information is received.

VicSmart process

No.

The applicant should submit an application that includes the specified information. If not, the responsible authority can informally ask for any ‘missing’ information but the statutory clock continues to run.

Steps

Giving notice of the application under s.52 of the Act

Regular permit process

Yes.

If responsible authority considers giving notice is necessary.

VicSmart process

No.

The giving of notice is not required as the only consideration is whether or not the decision guidelines are met.

Steps

Referring the application under s.55 of the Act

Regular permit process

Yes.

If required, the applicant can submit written consent with the application or council can refer the application after it has been received.

VicSmart process

No.

If required, written consent from a referral authority must be submitted with the application.

Steps

Matters to be considered when assessing the application

Regular permit process

Full assessment against the requirements of s.60 of the Act, SPPF, LPPF and local provisions.

VicSmart process

Only assessed against the VicSmart decision guidelines.

Steps

Deciding the application

Regular permit process

Council (or delegate).

VicSmart process

Chief Executive Officer

(or delegate).

Steps

Third party review rights

Regular permit process

Yes.

Unless specifically exempt in the planning scheme.

VicSmart process

No.

Only an applicant has a right of review about whether the decision guidelines have been met.

Steps

Statutory decision time

Regular permit process

60 calendar days.

Applicant may apply for a review if no decision is made within time.

VicSmart process

10 business days.

Applicant may apply for a review if no decision is made within time.


The VicSmart planning provisions

New clauses are proposed to be introduced into the Victoria Planning Provisions (VPP) and all planning schemes to implement the VicSmart planning provisions.


Appendix 1

Schedule to Clause 94 - Page 1 of 3
Schedule to Clause 94 - Page 2 of 3
Schedule to Clause 94 - Page 3 of 3

[Back to List]

5. Flinders Peak Secondary College Options Analysis

Portfolio:

Sport and Recreation – Cr John Irvine

Source:

Projects Recreation and Central Geelong - Sport and Recreation

General Manager:

Paul Jane

Index Reference:

Subject: Land Acquisition & Building Purchase
Property key: #282219, 95 Hendy Street Corio


Purpose

The purpose of this report is to outline options for the future provision of recreation infrastructure at the former Flinders Peak Secondary College and the adjacent council reserve in Corio. The Department of Treasury and Finance has advised its intention to dispose of the site.


Summary

Cr Ansett moved, Cr Harwood seconded -

That Council:

  1. informs the Department of Treasury and Finance that it wishes to retain the former ECA Centre (Education and Community Activity Centre) site to the Hendy Street Road frontage and will not seek to purchase the parcel of land that the Geelong Rugby Club resides on;

  2. pursues Option 2 and establishes a new multi-use turf field and consider the refurbishment of the ECA Centre to fulfil club player amenities;

  3. negotiates with the Department of Treasury and Finance and enters into a lease until 2017 at the existing F Block site, to provide ongoing security of tenancy for the Rugby Club during the transitional period of developing and establishing alternate facilities at the adjacent Council reserve.


Carried.

Background

Flinders Peak Secondary College (formerly Corio North High School) commenced operations in 1978. The Shire of Corio contributed to the cost of construction of sporting facilities at the school site in order to facilitate community use. The Shire of Corio contributed $18,000 in 1979 toward the cost of playing fields, tennis courts, playground, furniture and landscaping and $80,000 in 1983 toward the cost of the ECA centre (Education and Community Activity centre, i.e. stadium). Various formal and informal arrangements between the school council and the Shire of Corio and later the City of Greater Geelong dictated the administrative and maintenance obligations of the parties with regard to these facilities.

Council placed the Geelong Rugby Union Club on the facilities at Flinders Peak in 2005, and subsequently invested approximately $347,000 into floodlight installation and change facilities upgrades between 2005/2006 and 2007/2008. The sports oval is irrigated (installed by CoGG c.1997 at a cost of approximately $48,000), and ongoing sports ground maintenance since 2005/2006 has totalled approximately $264,000.

A Licence Agreement dated 2007 between the CoGG and the Minister for Education is currently in place for use of the sports oval and F-Block, both of which are used as the field and sporting clubrooms of the Geelong Rugby Union Club. The sports oval is also used by Corio Cricket Club as its seconds ground during the cricket season.

This Licence Agreement includes provision for the Minister to terminate the agreement if it is determined that the land is required for reasons including ‘disposal of the Land or part of it’ or ‘any other reason’ (clause 9). In addition, there is a clause allowing the Minister to terminate the agreement if the facility is ‘damaged or destroyed so as to render it... unfit for use and it is... impractical or undesirable to reinstate’.

If the decision is taken to terminate the Licence Agreement, the Minister is required to present one of the following three options to CoGG (clause 10). The choice of options presented is at the discretion of the Minister and cannot be the subject of a dispute:

  1. Subdivision of the whole or part of the land and an offer of sale to the Licensee;

  2. Entering into a lease for the whole or part of the facility with the terms and conditions consistent with the existing Licence Agreement; or

  3. Compensation payable to the Licensee to the amount determined by the Minister at the Minister’s discretion and taking several factors into consideration including the construction contribution made by the Licensee, reduced to reflect the portion of the Licence Term which has expired.

CoGG was notified in a letter from the Department of Treasury and Finance (DTF), dated 21 October 2013, that it has been directed by DEECD to dispose of the Flinders Peak school site. DTF sought to establish whether CoGG had any interest in purchasing the property.

A valuation was subsequently sought by council on the portion of the land that accommodates the sports oval and F-Block, in order that an assessment could be made on the relative benefits of attempting to purchase that particular parcel in which council had invested over the years, as opposed to investing in new recreation infrastructure to serve the tenant sporting club and the broader community at the adjacent council reserve on the corner of Plantation Road and Hendy Street.

Although the Shire of Corio also contributed to the cost of building the ECA centre, the now-disused stadium is in a state of extreme disrepair. The cost to restore the building to a safe and functioning one-court facility is prohibitive. Furthermore, the recently adopted Indoor Recreation Facilities Strategy does not identify a demand for this facility. For these reasons, the stadium site was not included in the footprint of land for which a valuation was sought.


Aerial image showing the location of F-Block, the school oval, ECAcentre and Council reserve

CoGG was advised in email correspondence dated 9 April 2014 that a decision has been taken to demolish the school buildings except F-Block and associated services. Ongoing use of F-Block and services has been subsequently assured, and planning by DEECD’s demolition project manager is being undertaken to ensure there is no disruption to services during the current sporting season while the rugby club is tenant.

To date, CoGG has not been notified that the Minister intends to terminate the existing Licence Agreement.


Discussion

The Sport and Recreation department has determined that two options exist for the future provision of recreation infrastructure at Flinders Peak:

  1. Purchase approximately 2.8ha of the school site, which includes the sports oval and F-Block. See Appendix 1 (not preferred).

  2. Do not purchase any school land. Invest in new sports fields and a pavilion on the council-owned reserve adjacent to the school site and relocate the tenant sporting club. See Appendix 2 (preferred).

The issues and opportunities associated with the two options are examined below.


Option 1 – purchase

An estimate of value for the 28,185 sqm portion of land that accommodates the sports oval and F-Block was received by council from the Valuer General on 15 April 2014. After allowing for purchase, subdivision, services and other costs, a total cost to council of $2 million has been conservatively assumed.

Issues

Opportunities

Option 2 – relocation (preferred)

The existing council reserve at 93 Hendy St, on the corner of Plantation Road is approximately nine (9) hectares in size, with a drainage basin occupying one third of the site. It includes an unsealed access road off Hendy Street along its northern boundary with the school.

Appendix 2 demonstrates how the northeast corner of the site could be developed into a multi-purpose playing surface of two rugby fields and a cricket wicket, with a small pavilion and car parking on the western boundary accessed via the existing access road.

Issues

Opportunities

Environmental Implications

There are no environmental implications associated with either of the options presented in this report.


Financial Implications

Each of the two options has financial implications and would require a future budget proposal.

Future budget proposal

 

Total capital cost

Ongoing maintenance & operational costs (approx.)

Option 1 – purchase

$2,000,000

$60,000 (short term repairs)

$32,000 p.a. (building & ground)

Option 2 – relocation (preferred)

$1,800,000

$45,000 p.a. (building & grounds)



Policy/Legal/Statutory Implications

There are no statutory notification requirements for the purchase of land. The Local Government Act (“the Act”) and the Best Practice Guidelines for the Sale, Exchange and Transfer of Land are silent on the requirements and procedures for purchasing land.

The ‘Reserve Funds’ Council Policy and the ‘Public Open Space Reserve Fund’ Management Procedure guide the use of funds for acquisition or open space developments from the Public Open Space Reserve Fund; there is no conflict with either.


Alignment to City Plan

The options presented in this report support the ‘Community Wellbeing’ strategic direction of City Plan by planning for an environment that supports healthy lifestyles and a connected, creative and strong community.


Officer Direct or Indirect Interest

No officers involved in the preparation of this report have a direct or indirect interest in matters to which this report relates.


Risk Assessment

A risk associated with Option 1 is that council would not get the opportunity to require a street frontage to the existing facilities in the development of the balance of the school land, which would see a perpetuation of the current situation of poor surveillance and high levels of vandalism to the facilities.


Social Considerations

The preferred Option 2 will provide improvements to public safety in an area currently subject to high levels of vandalism and anti-social behaviour, creating a more welcoming and accessible community asset.


Human Rights Charter

This report has no impact on human rights or the Human Rights Charter.


Consultation and Communication

Consultation has been with DEECD, DTF and the internal council departments involved in the delivery of services to the current Flinders Peak facilities and with council’s Property Advisor and has informed the development of the two options presented.

Following direction from Council, consultation with the Geelong Rugby Union Club and Corio Cricket Club will be undertaken to determine the requirements for any temporary facilities, relocation and/or to work through a design for new facilities.


[Back to List]

6. Community Engagement Policy

Portfolio:

Governance – Cr Lyons (Mayor)

Source:

Corporate Services - Corporate Strategy

A/General Manager:

Michael Kelly

Index Reference:

Subject: Corporate Strategy / Planning


Purpose

This report seeks the endorsement of Council for the revised Community Engagement Policy.


Summary

Cr E Kontelj moved, Cr Harwood seconded -

That Council endorse the revised Community Engagement Policy – see Appendix 1.

Cr S Kontelj left the meeting room at 8:07pm

Cr S Kontelj re-entered the meeting room at 8:08pm


Carried.


Background

The current Community Consultation Policy was endorsed by Council in 2008. Since that time, Council has done much to improve its engagement processes including adoption of the International Association for Public Participation (IAP2) Core Values and Public Participation Spectrum, the ongoing development of Council’s community engagement activity database Engage (formerly CONSULT) and the implementation of a Community Engagement Action Plan.


Also currently underway is the development of the online Community Engagement Hub, a one stop shop which provides officers with information on all aspects of community engagement including planning, techniques, using Engage, training opportunities and best practice examples. The Community Engagement Hub will be accessed via CityWeb and is due for completion at the end of May 2014.


Discussion

The purpose of the Community Engagement Policy is to outline the principles and processes that Council will use to ensure effective engagement with the community. Given the changes that have taken place, it is timely to now revise and update the Policy to reflect these changes.

Changes to the Policy include:

The revised Community Engagement Policy will be communicated to the organisation as part of the launch of the Community Engagement Hub in June/July 2014.


Environmental Implications

Nil


Financial Implications

Failure to adhere to the Policy requirement to record all engagement activities could potentially result in financial losses due to expenditure on duplicated engagement or lack of identification for opportunities to collaborate.


Policy/Legal/Statutory Implications

Section 3D(f) of the Local Government Act 1989 states that the role of Council includes “fostering community cohesion and encouraging active participation in civic life”.

The Local Government Act 1999 Section 208B ensures that Councils continuously look to improve services to the community. In particular, section 208B (e) states that “a Council must develop a program of regular consultation with its community in relation to the services it provides”. Further to this, 208B (f) states that Councils must also report regularly to the community on its services, achievements, improvement opportunities and consultation activities.


Alignment to City Plan

Outlining the principles and processes to be used by Council when undertaking community engagement activities by way of the Community Engagement Policy, directly supports the City Plan Priority ‘Informed and Engaged community’ under the Strategic Direction ‘How We Do Business’.


Officer Direct or Indirect Interest

Nil


Risk Assessment

Lack of a consistent engagement approach across Council departments can lead to inappropriate or ad hoc engagement and subsequently adverse outcomes or negative perceptions of Council.


Social Considerations

Effective community engagement facilitates the exchange of views, ideas and information to help guide Councils decision-making processes and will consequently result in the delivery of strategies, projects, services and activities that are more responsive to local needs, concerns and priorities.


Human Rights Charter

The Community Engagement Policy supports specific rights within the Human Rights Charter including:


Consultation and Communication

The revised Community Engagement Policy will be communicated to the organisation as part of the launch of the Community Engagement Hub in June/July 2014. It will be also made available to the community via the Have Your Say section of Council’s website.


[Back to List]

7. Consideration of Tender Submissions for Tender No. T1400052 Design and Construction of an Iconic Christmas Tree

Portfolio:

Finance – Cr Lyons (Mayor)

Source:

Capital Projects

General Manager:

Paul Jane

Index Reference:

Project T1400052


Purpose

To provide Council with the requisite information to facilitate the approval of the tender evaluation panel’s recommendation in relation to the design and construction of an ‘Iconic Christmas Tree’ tender.


Summary

Cr Harwood moved, Cr E Kontelj seconded -

That Council:

  1. accept the tender submission from Creative Production Services Pty Ltd for Tender No T140052 – Design and Construction of an Iconic Christmas Tree for the lump sum amount of $450,000 and an annual installation, maintenance and storage component of $135,000 (per year for a four year period) exclusive of GST;

  2. sign and seal the contract documents.

The vote was tied and the Mayor exercised his casting vote.


Carried.


Division Requested:

For: Crs Ansett, S Kontelj, Nelson, E Kontelj, Lyons, Harwood

Against: Crs Ellis, Fisher, Macdonald, Richards, Farrell, Irvine


Background

Tenders for the Design and construction of an iconic Christmas tree were invited via public advertisement in The Age and on Tenderlink on Saturday 19 April 2014.

At the close of tenders on Friday, 16 May 2014 the following tender submissions were received:

Tenderer

Displaycraft Pty Ltd trading as Chas Clarkson

Citelum Australia Pty Ltd

CNC Design Pty Ltd

Creative Production Services Pty Ltd

Matherson Construction Group Pty Ltd

Mija (Geelong) Pty Ltd as Trustee for D&S Burke Family Trust

Rara Architects and Dimpat Constructions

Rhino Signmakers Pty Ltd

Bryce Grunden Pty Ltd t/a Sound Environment

Cassidy Manufacturing Pty Ltd t/a Universal Manufacturing Australia

Xmas Mil Display Products Pty Ltd

Production Resource Group (Australia) Pty Ltd

All tenders have been submitted exclusive of GST.


Discussion

The tender submissions associated with this tender were evaluated by a panel consisting of:

Michael Kelly

Acting General Manager Corporate Services

Scott Cavanagh

Manager Capital Projects

Shaun Broadbent

Senior Capital Project Officer

Kelly Ivens

Marketing Team Leader

Peter Walker

Senior Contracts Officer (Non Voting)

Jenny McMahon

General Manager Community Services (Non Voting)


Stage One – Mandatory Criteria

OHS mandatory requirements apply to this Tender.

Upon review, the submission received from CNC Design Pty Ltd was not an actual tender submission for the full tendered project therefore not evaluated further.

The submission received from Xmas Mil Display Products Pty Ltd was deemed non- conforming due to not addressing a key component of the tendered project that the tree is to be a floating tree on Corio Bay.

All other submissions responded to all mandatory requirements set down in the Tender documents and are considered to conform.

Stage Two –Comparative Criteria

Tender submissions were assessed based on the respondent’s performance or tender response in the following areas:

Criteria

Weighting

Price (Total value for money)

40%

Technical Capability to meet specification

55%

Economic Contribution to Region

5%

 

100%

At the conclusion of the evaluation the tenderers were ranked in the following order in accordance with the above criteria:

Tenderer

Rank

Creative Production Services Pty Ltd

1

Mija (Geelong) Pty Ltd as The Trustee for D&S Burke Family Trust

2

Displaycraft Pty Ltd trading as Chas Clarkson

3

Citelum Australia Pty Ltd

4

Matherson Construction Group Pty Ltd

5

Cassidy Manufacturing Pty Ltd t/a Universal Manufacturing Australia

6

Rhino Signmakers Pty Ltd

7

Bryce Grunden Pty Ltd t/a Sound Environment

8

Rara Architects and Dimpat Constructions

9

Production Resource Group (Australia) Pty Ltd

10

Council nominated a capital budget of $450,000 for this project in the tender documentation therefore the non price aspects of this tender were the key determinants of the tender outcome.

At the conclusion of the evaluation process, the evaluation panel determined that Creative Production Services Pty Ltd, the highest ranked tenderer and one of the lowest priced within budget tenders, represented best value to Council (Refer Appendix 1).

Creative Production Services Pty Ltd provided an excellent tender for the project. They fully addressed all criteria and produced a concept design that the evaluation panel deem meets the brief of the project.

Creative Production Services Pty Ltd have relevant previous experience with Victoria based Christmas related projects and demonstrated a thorough understanding of the unique nature of these types of projects.

Creative Production Services Pty Ltd also identified an opportunity to utilise local suppliers through the course of this contract.

Reference checks were undertaken which reinforced the panel’s view that Creative Production Services Pty Ltd can successfully deliver the design and construction of an iconic Christmas tree project for Council.

Creative Production Services Pty Ltd is recommended by the evaluation panel to undertake the design and construction of an iconic Christmas tree.

Finally, the submitted project schedule highlights that an official launch of the tree could occur on 22 November 2014, with removal scheduled approximately 15 January 2015.


Environmental Implications

Any environmental implications associated with this contract will arise from the execution of this service. It is considered that these are the responsibility of the Contractor and will be managed through the contract documentation.


Financial Implications

The funding for this project will be drawn from a capital budget allocation (including contingency) of $500,000 (C15830). The provision for an annual installation, maintenance and storage components is $135,000 per annum over a four year term and will be drawn from a new recurrent budget allocation, commencing in 2015-2016.

The total contract cost for the ‘Iconic Christmas Tree’ will be $990,000. This includes the initial capital spend of $450,000 in 2014-2015 and the annual $135,000 allocation in each financial year between 2015-2016 to 2018-2019.


Policy/Legal/Statutory Implications

The requirements of Section 186 of the Local Government Act have been complied with for this tender. There is no other policy, legal or statutory implications associated with this tender process.


Alignment to City Plan

The Christmas in Geelong program and project delivery models covered in this report align with the Community Wellbeing, Growing Our Economy, and How We Do Business strategic directions of City Plan.


Officer Direct or Indirect Interest

No officers involved in the preparation of this report have a direct or indirect interest in matters to which this report relates.


Risk Assessment

The most significant risk to the project is timing. If a decision to award the contract to the preferred tenderer is not made immediately, the project will not be able to be delivered for Christmas 2014.

A further detailed project risk profile has been developed and is being maintained by the project manager.


Social Considerations

There are no social implications that will arise from the acceptance of this tender. It is envisaged that the iconic Christmas tree will have a positive social impact on the Geelong region.


Human Rights Charter

There are not anticipated to be any Human Rights impacts associated with the acceptance of this tender.


Consultation and Communication

There is no communication issues associated with the acceptance of this tender. Council’s representative will liaise with any affected community groups.


Appendix 1

In accordance with Section 89 (2) (d) of the Local Government Act 1989, this Appendix is confidential and is not to be released to the public. The design is the Intellectual Property of the preferred tenderer.


[Back to List]

Contents | Previous Page: Section A - Procedural Matters | Next Page: Section C - Notice of Motion