  1. Adoption of Amendment C334 - Incremental Change Area Review 2015

  2. Central Geelong - Declaraton of Special Rate

  3. Christmas in Geelong Program 2015

  4. Women in Community Life Advisory Committee

  5. Splashdown Aquatic Play Project

  6. 2016-2017 Country Football and Netball Program Submission

  7. Delegations and Authorisation from Council to Staff

  8. Workplace and Council Culture Program - City of Greater Geelong

  9. Lease of Land - Peninsula Drive, Drysdale

  10. Exchange of Land - Batman Road, Indented Head

  11. Grovedale Tennis Club Facilities Upgrade

  12. Montpellier Drive, Highton - Proposed Footpath Construction SRC345 - Intention to Declare

  13. Lease of Ocen Grove Golf Club - 9 Guthridge Street, Ocean Grove

  14. Revocation of Flood Prone Area Designation of New Lots at Warralily, Stages 69, 77 and 81

  15. Revocation of Flood Prone Area Designation of New Lots at Warralily, Stages 101 and 104

  16. Revocation of Flood Prone Area Designation of New Lots at Armstrong Villawood Estate Stage 17, 18, 28 and 29

  17. Revocation of Flood Prone Area Designation of New Lots at Lara Central, Lara Stage 3

  18. Portarlington North East Group Road Construction Special Charge Scheme SRC340 - Declaration of Charge

  19. Tender and Award of Industrial Subdivision, Innovation Drive, Corio

  20. Contractual Matter (Confidential)



1. Adoption of Amendment C334 - Incremental Change Area Review 2015

Portfolio:

Planning – Cr Heagney

Source:

Planning and Development – City Development

General Manager:

Peter Bettess

Index Reference:

Application: Amendment C334


Purpose

This report considers the Independent Panel Report and Recommendation on Amendment C334 and recommends adoption of the Amendment.


Summary

Cr Heagney moved, Cr Harwood seconded -

That Council :

  1. adopt Amendment C334 in the form outlined in Appendix 2 of this report; and

  2. submit the adopted Amendment with the prescribed information to the Minister for Planning requesting approval.

Carried.


Background

In 2007 Council adopted a Housing Diversity Strategy (HDS). The HDS identified three development fronts to deliver housing diversity across Geelong: Key Development Areas, Increased Housing Diversity Areas and Incremental Change Areas. Amendment C129, gazetted in January 2010, implemented the Housing Diversity Strategy, applying the former Residential 3 Zone to incremental change areas that had a garden character.

Amendment C300, gazetted in November 2014, applied the new suite of residential zones introduced by the previous State Government. Incremental Change Areas were zoned either GRZ 1 or GRZ 2, generally following the zoning that was introduced by Amendment C129. In considering submissions on Amendment C300, Council supported including a further work requirement in Clause 21.06-6 of the Planning Scheme to undertake further work to review the implementation of areas identified for incremental change in the Housing Diversity Strategy, to consider the application of General Residential Zone Schedule 2.

Council officers prepared the Incremental Change Areas Review 2015, undertaking a review of existing GRZ 1 areas to determine if any areas had a garden character. There were two stages in the review process, a desktop assessment using available data, followed by a more detailed assessment involving site visits and qualitative assessment. The review identified four garden character areas and recommended their rezoning from GRZ 1 to GRZ 2. Council adopted this recommendation at its meeting of 28 April 2015.

Amendment C334 seeks to implement the Incremental Change Area Review 2015 by making the following changes to the Greater Geelong Planning Scheme:

Appendix 1 shows the areas being rezoned.


Discussion

Exhibition details

The Amendment was exhibited from 2 July 2015 to 3 August 2015.

Notice of the Amendment was mailed to all landowners affected by the Amendment. 3727 letters were mailed out; duplicate letters were not sent where a landowner owned multiple properties in the same identified garden character area.

The Amendment was exhibited in local newspapers and on Council’s website. The Amendment received over 1200 views on the website. Council staff answered over 150 telephone queries and around 30 front counter queries on the Amendment. A public information session held at the Council’s Brougham Street office on the evening of 15 July 2015 was attended by 15 people.

The table below indicates how many letters were mailed out and how many submissions were received from each identified garden character area. For submissions received, this is based on the location of the property owned by the submitter; in some instances the submitter resides elsewhere.

Property

Mailout

Support

Comment

Object

Total

Bell Post Hill

1575

6

2

3

11

North Geelong

440

1

0

3

4

Newcomb

1303

1

1

4

6

Point Lonsdale

409

2

1

0

3

Other

-

1

2

0

3

TOTAL

3727

11

6

10

27


A total of 27 submissions were received, comprising 11 submissions of support, 10 objections and 6 submissions making comment only. The number of objections represents 0.27% of the letters mailed out.

Issues raised in the objections included:

Independent Panel

On 27 August 2015, Council considered the submissions under delegated authority and resolved to refer the submissions to an Independent Panel appointed by the Minister for Planning. Council officers considered the submissions and did not recommend any modifications to the exhibited Amendment.

The Panel Hearing was held at Council’s Offices on 26 October 2015. None of the submitters requested to be heard by the Panel. A one person Panel, Gaye McKenzie, conducted the Hearing. The Panel submitted its report to Council on 24 November 2015.


Panel Report
The Panel recommended that Amendment C334 be adopted as exhibited.

The Panel Report conveys the following findings and conclusions:
The Amendment is supported by, and implements the relevant sections of the State and Local Planning Policy Frameworks. The Amendment is well founded and is strategically justified.

The extensive strategic work undertaken by Council in identifying the subject areas justifies the preparation of this Amendment.

The Panel suggested that the term “suburban garden character” probably better defines the character of the identified areas.

The areas which are subject of the Amendment have a “suburban garden character” worth protecting. It therefore supports the requirements of the GRZ 2 that will encourage new development that reflects this character. In supporting the application of GRZ 2, and noting the discretionary nature of the open space controls, the Panel believes that there may be instances when consideration may be given to reducing them, based on the merits of an individual proposal.

The issue of how GRZ 2 may affect the value of individual sites is not on the Panel is able to consider. From the broader community perspective, the Amendment may have a positive economic effect, because new single dwellings and multi-dwellings will contribute to the “suburban garden character” of the street and the area they are within.

The Amendment may contribute to greater diversity of dwelling types, including smaller one storey dwellings and double storey dwellings. The Panel was not provided with evidence to support concerns that the Amendment would lead to reduced property values, and believes moderate growth will still be possible in providing a range of dwelling types.

The boundaries proposed by the Amendment are appropriate and should be adopted as exhibited. Specifically, the Panel agrees that Thompson Road is the logical boundary for the North Geelong GRZ 2 area and supports the choice of Helms Street as the eastern boundary of the Newcomb GRZ 2 area.

With respect to a submission indicating Bell Park should be included in GRZ 2, the Panel noted that the area was investigated but rejected for inclusion in GRZ 2, and in any case cannot consider this matter as it is not part of the Amendment.

Officer response

The conclusions and recommendation of the Panel are supported.

The term “garden character” is not defined in the Greater Geelong Planning Scheme. The reference by the Panel to “suburban garden character” rather than “garden character” may better explain the characteristics that the Review sought to identify and GRZ 2 zoning seeks to protect not only the presence of gardens, but a spacious form of development based on site coverage and the setting or space around most dwellings providing opportunity for gardens, as well as the presence of nature strips, footpaths and street trees throughout the majority of an area. In any case, there is no reference to “garden character” in Schedule 2 to the General Residential Zone and hence no need for any further amendment to the Greater Geelong Planning Scheme to introduce the term “suburban garden character”.


Environmental Implications

The Amendment will have positive environmental impacts. Increased private open space requirements for two or more dwellings on a lot may marginally reduce stormwater runoff compared to development under GRZ 1. In addition, GRZ 2 requires planting of one canopy tree per new dwelling for applications for two or more dwellings on a lot.


Financial Implications

There are no budget implications arising from this Amendment.


Policy/Legal/Statutory Implications

The amendment is consistent with State Planning Policy in:

The amendment is consistent with the Local Planning Policy Framework in:


Alignment to City Plan

The Amendment is consistent with City Plan’s Sustainable Built and Natural Environment priority to enhance and protect natural areas and ecosystem health, in that it increased private open space requirements for two or more dwellings on a lot may marginally reduce stormwater runoff compared to development under GRZ 1.


Officer Direct or Indirect Interest

No Council Officers involved in the preparation of this report have any direct or indirect interest in the matter to which this report relates, in accordance with Section 80 (c) of the Local Government Act.


Risk Assessment

There are no notable risks associated with implementing the recommendation contained in this report.


Social Considerations

The Amendment will have minimal social impacts. Maintaining the suburban garden character of these areas may contribute to residents’ satisfaction with their environment.


Human Rights Charter

The Amendment will not impact on any basic rights, freedoms and responsibilities as set out in the Charter. Planning legislation ensures an open community consultation process occurs, enabling people to freely express their views and if necessary obtain a fair hearing before an Independent Panel. Submitters had that opportunity in this case.


Consultation and Communication

The Independent Panel report has been publicly released with a copy provided to submitters.


APPENDIX 1- SUBJECT LAND

Bell Post Hill and North Geelong

Subject land: Bell Post Hill and North Geelong

Newcomb

Subject land: Newcomb

Point Lonsdale

Subject land: Point Lonsdale

APPENDIX 2 – AMENDMENT FOR ADOPTION

Planning and Environment Act 1987

GREATER GEELONG PLANNING SCHEME

AMENDMENT C334

INSTRUCTION SHEET

The planning authority for this amendment is Greater Geelong Planning Scheme

The Greater Geelong Planning Scheme is amended as follows:

Planning Scheme Maps

The Planning Scheme Maps are amended by a total of 4 attached maps.

Zoning Maps

  1. Planning Scheme Map Nos. 25, 32, 33, 37, 51, 55, 56 and 83 are amended in the manner shown on the attached maps marked “Greater Geelong Planning Scheme, Amendment C334”.

Planning Scheme Ordinance

The Planning Scheme Ordinance is amended as follows:

  1. In Local Planning Policy Framework – replace Clause 21.06 with a new Clause 21.06 in the form of the attached document.

End of document


Amendment C334 - General Residential Zone - Schedule 2: Part of Planning Scheme Maps 25, 32 and 33
Amendment C334 - General Residential Zone - Schedule 2: Part of Planning Scheme Maps 33 and 37
Amendment C334 - General Residential Zone - Schedule 2: Part of Planning Scheme Maps 51, 55 and 56
Amendment C334 - General Residential Zone - Schedule 2: Part of Planning Scheme Map 83
Municipality Strategy Statement - Clause 21.06 - Page 1 of 7

Municipality Strategy Statement - Clause 21.06 - Page 2 of 7

Municipality Strategy Statement - Clause 21.06 - Page 3 of 7

Municipality Strategy Statement - Clause 21.06 - Page 4 of 7

Municipality Strategy Statement - Clause 21.06 - Page 5 of 7

Municipality Strategy Statement - Clause 21.06 - Page 6 of 7

Municipality Strategy Statement - Clause 21.06 - Page 7 of 7

[Back to List]

2. Central Geelong - Declaraton of Special Rate

Portfolio:

Central Geelong - Cr Heagney

Source:

Investment and Attraction / Events, Central Geelong & Waterfront

Acting General Manager:

Paul Jane

Index Reference:

Special Rates and Charges – Central Geelong & Waterfront


Purpose

This report seeks a resolution by Council to declare a Special Rate Scheme for Central Geelong Marketing effective from 1 July 2016.

The purpose is to commence the implementation of a new five (5) year term of the Central Geelong Marketing Special Rate to enable the continuation of the current marketing program for business promotion.

Summary

Cr Heagney moved, Cr Harwood seconded -

That the report be deferred.

Carried.


[Back to List]

3. Christmas in Geelong Program 2015

Portfolio:

Central Geelong - Cr Heagney
Arts & Culture – Cr Richards

Source:

Investment & Attraction / Events, Central Geelong & Waterfront

Acting General Manager:

Paul Jane

Index Reference:

Central Geelong Marketing / Christmas in Central Geelong


Purpose

To update Council on the outcome of the 2015 Christmas in Geelong Program, and seek direction on the 2016 installation of the Iconic Floating Christmas Tree.

Summary

Cr Heagney moved, Cr Farrell seconded -

That the report be deferred.

Carried.


[Back to List]

4. Women in Community Life Advisory Committee

Portfolio:

Women in Community Life – Cr Farrell

Source:

Community Life – Community Development

General Manager:

Linda Quinn

Index Reference:

Women in Community Life


Purpose

The purpose of this report is to seek Council endorsement to appoint the members of the Women in Community Life Advisory Committee (WICLAC / the Committee) for the next two years (January 2016 – December 2017).

Summary

Cr Farrell moved, Cr Heagney seconded -

That Council:

  1. appoints the following people as members of the Women in Community Life Advisory Committee (WICLAC) for a two year term to December 2017:

  2. •  Sarah Batson

    new

    •  Rosan Chakir

    casual vacancy first term

    •  Christine Couzens

    second term

    •  Robyn Davis

    casual vacancy first term

    •  Kate Georges

    new

    •  Maeve Kennedy

    new

    •  Davina Montgomery

    second term

    •  Dianne Pont

    second term

    •  Hannah Teesdale

    second term

    •  Jennifer Wills

    second term

    •  Justine Devonport

    second term

    •  Prof. Shurlee Swain

    second term

  1. endorses the current Council Portfolio holder as continuing chairperson for the Women In Community Life Advisory Committee;

  2. nominates Cr Kylie Fisher to the Women In Community Life Advisory Committee.

Cr E Kontelj left the meeting room at 8:16pm

Cr E Kontelj re-entered the meeting room at 8:18pm

Carried.


Background

n July 2013, Council established the Women in Community Life Advisory Committee (WICLAC / the Committee), with the first meeting being held in November 2013.

The role of the Committee is to provide advice to Council on matters relating to women in community life. The mission statement of the Committee is to achieve equality, inclusion and respect for women in Greater Geelong.

The three key themes that frame the work and direction of WICLAC are advocacy; raising awareness, and education and training.

Committee membership term is for two years with the opportunity to nominate for a further two years.

The current members have just completed a two year term. Participation of the Committee has been active with members engaging in monthly meetings and working together to develop and implement events and activities.

Seven members have nominated to remain for a second term, two members who filled casual vacancies from June 2015 also nominated to remain. The remaining three vacancies were put forward for public expressions of interest. Positions were advertised in City News, Women in Community Life Facebook page and local professional and members’ networks. Applications were open from Friday 5 November 2015 and accepted until close of business Friday 20 November 2015.

A sub-committee of WICLAC assessed the applications against the Committee’s key directions. The resulting recommendations are now put forward for appointment to the Committee.


Discussion

All Committee members are encouraged to actively participate in monthly meetings, sub-committee meetings and subsequent activities and events. Committee members are expected to provide feedback, share, and promote the actions and deliberations of the Committee within organisations, networks, and/or the wider community. The active membership participation of the last two years has resulted in successful events and activities, which have contributed to achieving equality, inclusion and respect for women in Greater Geelong.

The proposed Committee membership for the next term has representation from across the municipality and includes a diversity of ages and personal and professional experience.

Proposed WICLAC membership January 2016 – December (2017):

•  Sarah Batson

new

•  Rosan Chakir

casual vacancy first term

•  Christine Couzens

second term

•  Robyn Davis

casual vacancy first term

•  Kate Georges

new

•  Maeve Kennedy

new

•  Davina Montgomery

second term

•  Dianne Pont

second term

•  Hannah Teesdale

second term

•  Jennifer Wills

second term

•  Justine Devonport

second term

•  Prof. Shurlee Swain

second term


The Terms of Reference identifies that Council will nominate two representatives to the Committee. One Council representative will be the Women in Community Life portfolio holder who will chair the Committee. The second Council representative will be nominated by Council. The Terms of Reference also identify that other Councillors of CoGG are welcome to participate as non-voting members.

The mission statement of the Committee, to achieve equality, inclusion and respect for women in Greater Geelong, is supported by the Victorian Local Government Women’s Charter.


Environmental Implications

Not applicable.


Financial Implications

There are no changes to the current budget. A budget of $20,000 to support activities to achieve the WICLAC mission has been proposed for consideration in the 2016–2017 budget.


Policy/Legal/Statutory Implications

The Committee is in line Council’s position as a signatory to the Victorian Local Government Women’s Charter. There are no statutory implications.


Alignment to City Plan

WICLAC aligns with the ‘Community Wellbeing’ and ‘How we do Business’ objectives of City Plan. The Committee is under the Councillor Women in Community Life portfolio.


Officer Direct or Indirect Interest

No Council officer involved in the preparation of this report has a direct or indirect interest in the matter to which the report relates.


Risk Assessment

Not applicable.


Social Considerations

The strategic direction and activities of WICLAC enhance the health and wellbeing of local communities, in particular, matters relating to women and their participation, representation and leadership in community and civic life.


Human Rights Charter

WICLAC clearly aligns with and is supported by the Human Rights Charter (HRC). Principles of freedom, respect, equality and dignity are promoted by the HRC, and these are incorporated in the Victorian Local Government Women’s Charter, which is a guiding document to the Committee.


Consultation and Communication

The Community Life Division, Community Development Department is responsible for communication relating to this report.


[Back to List]

5. Splashdown Aquatic Play Project

Portfolio:

Sport and Recreation – Cr Irvine

Source:

Community Life

General Manager:

Linda Quinn

Index Reference:

C15848 - Splashdown Aquatic Play Upgrade
Property #248225


Purpose

To seek direction from Council in relation to Project C15848 – Splashdown Aquatic Play Upgrades.

Summary

The Mayor vacated the Chair at 8:24pm

Cr Harwood assumed the Chair at 8:24pm

Cr Irvine moved, Cr Heagney seconded -

That Council place Project C15848 on hold pending a submission for additional funding as part of the 2016/17 budget process.

Carried.


Background

As part of the 2015/16 budget Council allocated $350,000 towards Project C15848 Splashdown Aquatic Play Upgrades. The technical specification for the aquatic play design was completed in October 2015. During the development of the specification the original scope and filtration design had to change due to the water capacity demands and inability to connect the new system to the existing plant room.

The original budget allocation was based on installing a structure to the existing toddler pool filtration system. The structure cost estimate was $220,000 from White Water West and an allowance of $130,000 for plumbing and plant room connection.

The final technical specification included an additional “stand alone” new plant, heating, balance tank and association filtration infrastructure.

The Contract was advertised and Tenders closed on Wednesday 2 December 2015. There was interest from five (5) companies during the compulsory site tour prior to the Tender closing. Only one (1) Tender was received at a cost of $696,000.

A decision was made at the Tender Evaluation to put the project on hold subject to seeking further funding in the 2016/17 budget process.


Discussion

The original project budget of $350,000 was based on previous advice received from design consultants. The water play upgrades were intended to integrate and operate within the existing plant filtration system. Based on the final technical specification and associated design changes the project now requires a total budget of $696,000. A Budget Concept for 2016/17 has been submitted seeking the additional $346,000 for this project to proceed.

The Splashdown Aquatic Play upgrades have been in the planning phase for two (2) years as the first stage of the Splashdown Master Plan. With the growing trend of adding water play structures, splash pads and aquatic activities within Leisure Centre’s across Australia over the past five (5) years, this project was aimed at enhancing the aging pool hall facilities at Splashdown. The facility is now 30 years old and had minimal changes over that period.

The aim with adding aquatic play attractions is to enhance the existing facility functionality, improve the appeal to families, and Learn to Swim clients and bring the facility in line with our other indoor facilities which now have water play structures or splash pads. The community expectations for the service provision of water play has changed significantly over the last 10 years and this project would enable Splashdown to remain competitive in the casual aquatic and Learn to Swim markets.


Environmental Implications

The addition of aquatic play will increase water costs with the addition of second balance tank to supply the new equipment and features. Backwash waste water is diverted to the Grinter Reserve storm water dam. The heating and circulation can be provided through the highly efficient cogeneration plant located on site.


Financial Implications

If Council wish to proceed with the full project scope in accordance with the budget description, an additional $346,000 budget will be required for 2016/17.

There will be a minor increase to water costs in the operating budget which needs further analysis based on the final design installed.

External capital funding will be investigated in 2016 through the Sport and Recreation Victoria Better Pools funding program.


Policy/Legal/Statutory Implications

There is no policy, legal or statutory implication associated with acceptance of this report.


Alignment to City Plan

This project supports the strategic direction of Community Wellbeing. The primary goal is to drive more participation and physical activity.


Officer Direct or Indirect Interest

No Council Officers involved in this project or report have declared a direct or indirect interest in this matter.


Risk Assessment

A detailed project risk profile has been developed and is being maintained by the Project Manager.


Social Considerations

Sport, Recreation and Leisure opportunities play a key role in the health of our community. This project provides children and families with greater opportunities to increase regular physical activity and participation. Splashdown is an important destination for residents within many of our disadvantaged suburbs. It plays a key role to promote social inclusion, improve mental health, water safety and community connections.


Human Rights Charter

It is not evident or likely that this project would negatively impact any of the rights contained within the Charter of Human Rights. The new attraction would improve opportunities for local residents to have access to healthy lifestyle activities.


Consultation and Communication

There has been no media or announcements regarding the start date of the project so there will not be issues with further delays as funding is sourced.

A comprehensive engagement and communication plan is part of the project delivery once funding is confirmed.


[Back to List]

6. 2016-2017 Country Football and Netball Program Submission

Portfolio:

Sport and Recreation - Cr Irvine

Source:

Community Life - Sport and Recreation

General Manager:

Linda Quinn

Index Reference:

Subject: Sport and Recreation Grants and Funding


Purpose

To purpose of this report is to seek Council endorsement to develop an application for the Victorian Government’s Country Football and Netball Program (CFNP) towards the upgrade of Anakie Reserve.

Summary

Cr Irvine moved, Cr Ansett seconded -

That Council:

  1. endorse the development of a submission to Sport and Recreation Victoria’s Country Football and Netball Program (Application Guidelines attached as Appendix 1) for the Anakie Football and Netball Club - Change Facility Upgrade;

  2. pending the outcome of the application, refer the projected Council contribution to the 2016-17 Budget for consideration.

Cr Macdonald left the meeting room at 8:30pm

Cr Macdonald re-entered the meeting room at 8:33pm

Carried.

The Mayor re-entered the meeting room at 8.37 and resumed the Chair.


Background

Each year, the Victorian Government allocates funding for sport and recreation projects through a number of SRV grant programs.

Generally, these funding programs encourage:

The Country Football and Netball Program is a response to the Parliamentary Rural and Regional Services and Development Committee’s Inquiry into Country Football Report, tabled in State Parliament in December 2004.

Improving football and netball facilities in rural, regional and outer metropolitan areas will support the regional and rural way of life and ensure the sustainability of country football and netball into the future.

The G21 and AFL Barwon Regional Strategy 2015 (the Strategy) recognised the CFNP for its significant investment into facility development in the region and reinforced its importance in supporting local government and state sporting associations to address the football and netball infrastructure gap. A critical action from the Strategy is for local governments and the state and local sporting associations to actively lobby SRV for continuation of the CFNP.

The details of the CFNP for 2016-17 are:

Grant Program/ Category

Who can apply

No. of Applications

Maximum Amount per Grant

Maximum Total Project Cost

Funding Ratio** (minimum)

Country Football and Netball Program

Local Government Authorities

Up to three (3) seeking a maximum total of $100,000 $100,000 No limit 1.5 State : 1 Local

** Funding ratio is specific for regional cities

Football and netball clubs in Greater Geelong municipality were invited to submit projects via an Expression of Interest process through the Geelong Australia website. A total of nine (9) expressions of interest were received.

The full application must be developed and submitted to SRV by 11 February 2016. Successful applications are eligible for funding in the 2016-17 financial year.

Any project which has commenced prior to the announcement of funding will not be eligible and cannot be considered for submission to SRV.


Discussion

In assessing the nine (9) expressions of interest submitted by football and netball clubs, Council officers have used the assessment criteria in the application guidelines (Appendix 1), along with discussion with the local SRV and AFL Barwon representatives.

The G21 AFL Barwon Regional Strategy is the principal strategic document for football and netball in the region and has also been used to assist in the assessment of submissions. The Strategy has ranked the current facility conditions at sporting reserves within the Greater Geelong area to address gaps in facility provision and to form a comparison between all local football and netball clubs within the municipality.

This report outlines not only Council’s recommended project for submission to SRV, but other highly-rated projects considered during the evaluation. The high calibre of the applications made for an extremely competitive assessment process.

The CFNP Guidelines state, Councils may apply for the maximum grant amount ($100,000) for up to three (3) projects. The expressions of interest received each sought the full $100,000; therefore City of Greater Geelong will submit only one project for 2016-17.

In evaluating the Expressions of Interest, due consideration was given to projects which provide the greatest benefit to the community, have met the assessment criteria for the funding program and were recognised as a high priority action in the G21 AFL Barwon Regional Strategy.

The highest-rated projects are listed below, with further detail of the recommended project at Anakie Reserve following.

Project

Total project cost  

Grant amount requested  

Existing Council contribution 2015-16  

Council contribution required in 2016-17 

Local funding sources  

Noted in Council’s Strategic Resource Plan  

Recommended for submission 

Anakie Football and Netball Club: Change facility upgrade

$1,177,000

$100,000

$70,000 for design

$1,077,000

-

Yes

Yes

St Albans Football and Netball Club: Courts

$328,400

$100,000

-

$173,665

$54,735 (club in-kind)

No

No

St Joseph’s Football and Netball Club: Netball rooms

$500,000

$100,000

-

$400,000

$150,000 (club cash and club in-kind)

No

No


Preferred Application

After carefully assessing submissions, the project proposed to be submitted to SRV for funding consideration is outlined below:

Project: Anakie Football and Netball Club change facility upgrade

Description: Upgrade to the Anakie Football and Netball Club change rooms and amenities at Anakie Reserve. This project includes the construction of new football change rooms and amenities and the construction of netball change rooms. The project will create new, modern facilities that are in line with current standards. It rates poorly in comparison to other sporting clubs across the municipality and has an identified greater need for redevelopment. The upgrade to the facility will also benefit the wider community including tennis, cricket, community groups and its use as a fire refuge venue if required.

A concept design, including quantitative survey has now been completed which provides a solid understanding of the costs associated with the proposed project, those of which have been reflected within this report. Detailed design will be undertaken to ensure the project can be completed within the prescribed timeframes. Throughout the detailed design phase of the project, Officers will work closely with the Club to ascertain any in-kind funding contributions available.

This project is aligned to the G21 AFL Barwon Football Strategy in which it is rated as requiring substantial improvement. Anakie Reserve has the highest overall rating as the poorest facility within the municipality of those which do not have planned upgrades.

Total project cost:

$1,177,000

External funding sources:

$100,000

Council contribution required 16-17:

$1,077,000


The above option is preferred to achieve the best outcome for the community and the sporting club. This project is also very well aligned to the original intent of the CFNP in that it supports the regional and rural way of life and ensures the sustainability of country football and netball into the future.

Council’s Strategic Resource Plan identified a previous allocation of $630,000 to the Anakie Football Netball Club. However following further detailed planning undertaken by Council, additional funds are required to deliver the standard of facility necessary to ensure modern, accessible and compliant amenities.


Environmental Implications

There are no foreseeable environmental implications associated with this report. Environmentally sustainable design initiatives are incorporated into the design.


Financial Implications

There are no immediate financial implications associated with adopting the recommendations of this report.

Should the funding submission to SRV be successful, Council will be expected to make a commitment to the project in the 2016-17 financial year, to be determined via the budget development process.

The project has an existing identified amount of $630,000 listed in Council’s Strategic Resource Plan.


Policy/Legal/Statutory Implications

There are no legislative or legal ramifications associated with the adoption of this report.


Alignment to City Plan

The recommended project will align to the City Plan’s priority of Community Wellbeing, encouraging healthy lifestyles and connected communities through active recreation and participation in sport.


Officer Direct or Indirect Interest

No Council Officers engaged in the creation of this report have a direct or indirect interest in the matter to which this report relates to.


Risk Assessment

There are no immediate risks associated with this report. A component of the project will entail relevant risk management and Occupational Health and Safety.


Social Considerations

The expected population growth within the municipality necessitates the increased and improved provision of community sport facilities that provide a social outlet for the local community.

Participation in sport and recreational activities has long been recognised as an important contributor to community health and well being. Benefits of physical activity are well documented and include improved health, development of social skills, increased community connectedness and enhanced self-esteem.


Human Rights Charter

The recommendations contained within this report have no impact on Councils compliance with the Human Rights Charter.


Consultation and Communication

Council Officers facilitated an Expression of Interest process inviting sporting clubs to apply. Furthermore, Council’s Sport and Recreation department have consulted existing strategic plans to guide the recommendation for this project.


[Back to List]

7. Delegations and Authorisation from Council to Staff

Portfolio:

Governance – Cr Lyons (Mayor)

Source:

Strategy & Performance - Governance

General Manager:

Dean Frost

Index Reference:

Delegations


Purpose

To update the delegations from council to members of Council staff and appoint Verity Bright, Town Planner, as an authorised officer under the Planning and Environment Act 1987.

Summary

Cr E Kontelj moved, Cr Harwood seconded -

  1. In the exercise of the powers conferred by section 98(1) of the Local Government Act 1989 (the Act) and the other legislation referred to in the attached instrument of delegation, Greater Geelong City Council (Council) resolves that -

    1. There be delegated to the members of Council staff holding, acting in or performing the duties of the offices or positions referred to in the attached Instrument of Delegation to members of Council staff (Appendix 1), the powers, duties and function set out in that instrument, subject to the conditions and limitations specified in that instrument.

    2. The instrument comes into force immediately the common seal of Council is affixed to the instrument.

    3. On the coming into force of the instrument all previous delegations to members of Council staff (other than the Chief Executive Officer) are revoked.

    4. The duties and functions set out in the instrument must be performed, and the powers set out in the instruments must be executed, in accordance with any guidelines or policies of council that it may from time to time adopt.

  2. Government Act 1989 and under section 147(4) of the Planning and Environment Act 1987 Greater Geelong City Council (Council) resolves that:

    1. The member of Council staff referred to in the Instrument of Appointment and Authorisation (Appendix 2) is appointed and authorised as set out in the instrument.

    2. This instrument come into force immediately the common seal of Council is affixed to the instrument.

Carried.


Background

These delegations are based on a model developed and maintained by Maddocks Lawyers who are engaged to provide an update service and include legislative changes up to December 2015.

The delegation model is based on:

  1. Delegations from Council to the CEO

  2. Delegations from Council to members of Council staff

  3. Sub-delegation from the CEO to Council staff.

This report addresses delegations from Council to members of staff and for the appointment of and Authorised Officer under the Planning and Environment Act 1987.


Discussion

The proposed delegations of Council to members of staff detail sections of Acts and Regulations and nominate officers by position title to undertake specific powers, duties and functions on behalf of Council.

Delegations were last approved by Council in October 2015.

The changes in the December update were minor amendments, including:

Attachment 1 to the Instrument of Delegation sets out the complete schedule of the relevant powers, duties and functions being delegated.

Attachment 2 lists the changes from the previously endorsed Council to Staff delegations.

The Planning and Environment Act 1987 regulates enforcement and is reliant on authorised officers acting on behalf of the Responsible Authority (Council).

Verity Bright has recently been employed by the Council are required to be authorised under the Planning and Environment Act 1987.

Appendix 2 sets out the Instrument of Appointment and Authorisation under the Planning and Environment Act 1987.


Environmental Implications

There are no environmental implications relative to this report.


Financial Implications

There are no financial implications relative to this report.


Policy/Legal/Statutory Implications

The delegation and authorisation schedules have been prepared in accordance with the Maddocks lawyer’s model.


Alignment to City Plan

How we do business.


Officer Direct or Indirect Interest

No officer involved in the preparation of this report has a direct or indirect interest.


Risk Assessment

A properly prepared system of delegations and authorisations minimises the likelihood of officers acting outside their powers and exposing Council to unacceptable risk. Regular review of the delegations ensures accountability and responsibility for decisions when the decision makers are identified. Delegations and authorisations can be subject to legal scrutiny in courts and tribunals.


Social Considerations

There are no social considerations relative to this report.


Human Rights Charter

No Human Rights are affected by the contents of this report.


Consultation and Communication

All delegations and authorisations are published on Council’s internal website, Cityweb. Managers are consulted on the updates to the changes in legislation that effect their areas of responsibility.


Appendix 1

Greater Geelong City Council Instrument of Delegation to Members of Council Staff

In exercise of the power conferred by section 98(1) of the Local Government Act 1989, and the other legislation referred to in the Schedule (Attachment 1), Greater Geelong City Council ("Council") by this instrument:

  1. delegates each duty and/or function and/or power described in columns 1 and 2 of the Schedule (and summarised in column 3 of the Schedule) to the member of Council staff holding, acting in or performing the duties of the office or position described opposite each such duty and/or function and/or power in column 4 of the Schedule;

  2. delegates each duty and/or function and/or power described in columns 1 and 2 of the Schedule (and summarised in column 3 of the Schedule) to any member of Council staff to whom a member of Council staff listed in column 4 of the Schedule reports;

  3. declares that a delegate is not authorised by this Instrument of Delegation to:

  4. declares that–

THE COMMON SEAL of GREATER

)

 

GEELONG CITY COUNCIL was affixed

)

 

hereto in the presence of:

)

 

 

 

 

 

 

 

Mayor

 

 

 

 

 

 

 

 

Chief Executive Officer

 

 

 

 

 

Date:        /        /        

 

 




Appendix 2

Greater Geelong City Council Instrument of Appointment and Authorisation

(Planning and Environment Act 1987)

By this instrument of appointment and authorisation Greater Geelong City Council -

  1. under section 147(4) of the Planning and Environment Act 1987 - appoints the officers listed below to be authorised officers for the purposes of the Planning and Environment Act 1987 and the regulations made under that Act; and

  2. under section 232 of the Local Government Act 1989 authorises the officers listed in Attachment 1 generally to institute proceedings for offences against the Acts and regulations described in this instrument.

Verity Bright – Town Planner

It is declared that this instrument -

  1. comes into force immediately upon its execution;

  2. remains in force until revoked.

This instrument is authorised by a resolution of the Greater Geelong City Council on 27 January 2016.

THE COMMON SEAL of GREATER

)

 

GEELONG CITY COUNCIL was affixed

)

 

hereto in the presence of:

)

 

 

 

 

 

 

 

Mayor

 

 

 

 

 

 

 

 

Chief Executive Officer

 

 

 

 

 

Date:        /        /        

 

 



[Back to List]

8. Workplace and Council Culture Program - City of Greater Geelong

Portfolio:

Governance - Cr Lyons (Mayor)

Source

Chief Executive Office

Chief Executive Officer:

Kelvin Spiller

Index Reference

Subject: People and Organisational Development


Purpose

To update Council of actions taken, and actions recommended, to address the issues identified in the Susan Halliday and EY Sweeny (Ernst and Young) reports with the City of Greater Geelong’s workplace culture.

Summary

Cr Heagney moved, Cr Richards seconded -

That Council notes the progress being made by the organisation to address culture concerns.

Carried.


Background

n 2015 the City of Greater Geelong conducted a Workplace Culture Review and have commenced addressing the issues highlighted.

The review highlighted several themes that included; concerns about raising complaints; inappropriate and unprofessional conduct of some councillors; lack of support from some managers and supervisors, concerns about some councillors breaching their code of conduct; Council failing to operate as a team; conflicts of interest; favouritism; gender equality; and Council engagement with the community.

Public commentary on social media and the disparate views on local media in general were also highlighted.

Through this process the organisation also looked at its policies. These policies were reviewed by Susan Halliday and WorkSafe Victoria, generally they have been described as ‘adequate to manage and prevent workplace bullying’. Susan Halliday has described them as needing to be more contemporary and proactive with a foundation in positive duty.

There is an established network of support for employees to raise concerns or make a complaint about any negative behaviour they experience in the workplace.

We also have an Employee Assistance Program that is available for our employees, councillors, and their families to assist with any negative experience they are having at work or personally.

To create a more positive workplace culture and ensure Council can deliver on the expectations of the community, three action plans will be developed and implemented.


Discussion

The CEO has committed the organisation to develop three actions plans to address the outcomes from the Culture Review:

The following are some of the actions that have already been taken or commenced from the Organisation Action Plan:

The following are some of the actions that are proposed in the draft Councillor Action Plan:

The Community Action Plan is yet to be developed.


Environmental Implications

There are no known environmental implications


Financial Implications

A budget proposal has been submitted to commit $200,000 in 2016/17 for the implementation of the action plans.


Policy/Legal/Statutory Implications

It is anticipated there will be some alterations to policies, to ensure they are in alignment with best practice.


Alignment to City Plan

The actions outlined in this report are aligned with Council’s commitment to providing a safe environment for staff and good governance practice.


Officer Direct or Indirect Interest

There are no known conflicts of interest for the person preparing this report.


Risk Assessment

The actions outlined in this report will minimise the risk to Council.


Social Considerations

The actions outlined in this report will ensure that safety and wellbeing concerns are being addressed.


Human Rights Charter

The actions outlined in this report will ensure those who work with and interact with Council are abiding by the Human Rights Charter.


Consultation and Communication

The actions outlined in this report will take into account good consultation practice and transparent and appropriate communication.


[Back to List]

9. Lease of Land - Peninsula Drive, Drysdale

Portfolio:

Finance - Cr Lyons (Mayor), Cr Farrell & Cr E Kontelj

Source:

Strategy & Performance – Property & Procurement

General Manager:

Dean Frost

Index Reference

Lease of Land


Purpose

To recommend that Council lease of part of the land at 29-39 Peninsula Drive, Drysdale (rear of Potato Shed) to the Catholic Archdiocese of Melbourne for the purpose of locating temporary classrooms to support St Ignatius College’s building program.

Summary

Cr Farrell moved, Cr Ellis seconded -

That Council enters into a lease with the Catholic Archdiocese of Melbourne for part of the land at 29-39 Peninsula Drive, Drysdale as follows:

  1. Lease area of 4,250m2 as indicated on the attached diagram;

  2. Rent to $3,500 pa;

  3. Lease term of 3 years; and

  4. Other appropriate terms and conditions including:

    1. tenant is to provide a satisfactory landscaping plan which addresses visual impact of the lease area viewed from the balance of the Council’s land and the landscaping is to be implemented and maintained by the tenant;

    2. access to the leased property is via school owned land and/or Gillies Road.

Carried.


Background

Council is the owner of approximately 45ha of undeveloped vacant land in the vicinity of Grubb Road and Peninsula Drive, Drysdale which was part of a larger parcel of land purchased by the former Shire of Bellarine for urban development purposes. Previously parts of the larger parcel have been sold to the Roman Catholic Trust Corporation and Department of Education for the schools currently located on Peninsula Drive.

Council’s multi arts facility, the Potato Shed, is located on a 5.010ha Reserve on the eastern side of Peninsula Drive between the schools and includes a bus interchange and car park.

The rest of Council’s land to the east and south of Peninsula Drive is either vacant or leased to various users. The Bellarine Secondary College (Minister of Education) currently holds 2 leases from Council for a total area of 8.8ha to the south of its campus currently paying $2,488 pa in rent.

Council’s land is zoned Special Uses Zone 13 being a zone that allows for a range of civic, community, education and recreation activities. This zone was introduced in 2011 under amendment C194 to the Planning Scheme. Previously the land was more widely zoned for general urban development including residential development, and while the current zone considerably restricts permitted uses it continues to recognize educational use.

The Catholic Archdiocese of Melbourne approached Council in 2011 to purchase land at the rear of the Potato Shed, Drysdale to expand St Ignatius College.

At its meeting on the 28 April 2015, Council resolved to sell approximately 2.6ha of land in Peninsula Drive, Drysdale at the rear of the Potato Shed to the RCTC for expansion of St Ignatius Secondary College.

Sale of the land was to be conditional upon the RCTC selling to Council 2,500m2 of its land in Murradoc Road, St Leonards for a future children’s services centre. At its meeting on 28 July 2105, Council noted that the RCTC was unable to agree to the sale of the St Leonards land, and sale of the Peninsula Drive land was abandoned. There has been no further progress on the possible sale of the St Leonards land to Council.


Discussion

St Ignatius has now approached Council to lease of 4,250m2 of land adjacent to its site for the purpose of locating temporary classrooms to support its building program (refer to attached diagram).

St Ignatius College is seeking to implement a building program which will in part replace existing re-locatable classrooms with permanent buildings. The School has two building projects planned being a Year 9 Learning Centre and a Sports Hall. These projects were originally planned for privately owned land east of Gillies Road, however that site contained significant asbestos contamination and was considered unsuitable. Council was then approached to sell the land at the rear of the Potato Shed.

Given the need to continue with the building program the proposed buildings are being “cramped” onto the existing School campus through multi storey construction for the Year 9 Learning Centre and occupation of existing synthetic tennis courts for the proposed Sports Hall.

 
The proposed lease area (indicated on the attached diagram) has dimensions of 25m by 170m and an area of 4,250m2. Ideally the School was seeking to occupy the site for temporary classrooms from 1 February 2016, however due to delays in arranging a lease, students will be occupying specialist classrooms until such time as the lease is formalised and temporary classroom are available.

Council’s intentions for the vacant land in the Peninsula Drive area, have in recent years been expressed in 2 strategic plans being the Drysdale Clifton Springs Sports master plan and The Potato Shed master plan. The eastern portion of Council’s Reserve containing the Potato Shed, accommodating the land proposed to be leased, has not been designated for any purpose under either of the master plans and the lease of the land to St Ignatius College will not affect the implementation of the master plans.

Initially it is planned to relocate 6 classrooms plus one teacher’s office onto the proposed lease area and these buildings will be located on the western or downhill half of the lease area. This location allows for at grade access to the existing campus and provides sufficient room for the temporary classrooms clear of an existing drainage swale in this location.

The eastern half of the proposed lease area at the Gillies Road end will be used for storage of unused temporary classrooms awaiting disposal.

The proposed lease area will be fenced into the existing campus and all temporary classrooms will be finished with verandas and pergolas.

The proposed lease term is 3 years which covers the two building projects proposed by the School. Any further building work beyond this lease term will be the subject of another lease request.

The School anticipates continued growth and retains an interest in the eventual purchase of the Council’s vacant land.


Environmental Implications

There are no environmental implications associated with the lease of the land. Electricity will be provided to the leased area and all bathrooms and other facilities will be located on the main campus.


Financial Implications

The rent, which has been set on the advice of the Council’s valuer, will be $3,500pa adjusted by CPI each 12 months.


Policy/Legal/Statutory Implications

Section 190 of the Local Government Act (“LG Act”) specifies lease terms relating to terms, rent and improvements which trigger the requirement to advertise the lease and hear any submissions. The lease as proposed does not require advertising.


Alignment to City Plan

The lease of the land will provide support for St Ignatius College’s building program and allow the school to meet its projected demands for education.


Officer Direct or Indirect Interest

No officers or contractors involved in the preparation of this report have a direct or indirect interest in matters to which this report relates.


Risk Assessment

The risks associated with the lease of this land are able to be managed following normal management procedures and processes.


Social Considerations

With the lease of the land to the Archdiocese, Council still has sufficient land in around the Potato Shed and to the west of Peninsula Drive to cater for the medium to long term community and sporting needs of Drysdale and the wider Peninsula.


Human Rights Charter

No human rights will be affected by the recommendation of this report.


Consultation and Communication

Comments on the proposed lease have been received from both the Potato Shed committee of management and the Bellarine Secondary College. The comments are included in Attachment 2 to this report.


Attachment 1

Proposed Lease Area

Proposed lease area

Attachment 2

Extract of minutes from Potato Shed committee of management meeting 17 November 2015.

“10.2 St Ignatius Lease of Council Land

It was agreed that the following be distributed in relation to item 10.2:

In recognition of the model of collaboration and partnership established by the Potato Shed Committee of Management between Council, Bellarine Secondary College and St Ignatius College Geelong, the committee acknowledged In principle support for the lease of the land on the following conditions:

Comments from Bellarine Secondary College Principal as referred from a Council officer.

“They are concerned about the impact on the Potato Shed and about how the buildings will look.

They are also concerned about this becoming a fixture for more than 5 years.

They are ok with 5 years but felt that St Ignatius should be making more appropriate plans for anything longer.

They were also keen to see the landscaping and visual impact of the buildings.”


[Back to List]

10. Exchange of Land - Batman Road, Indented Head

Portfolio:

Finance - Cr Lyons (Mayor), Cr Farrell, Cr Kontelj

Source:

Strategy & Performance - Property & Procurement

General Manager:

Dean Frost

Index Reference:

Land Sales


Purpose

The purpose of this report is to recommend that Council commence the procedures to exchange land with Mira Ira Nominees Pty Ltd (“the developer”) at Batman Road, Indented Head.

Summary

Cr Ellis moved, Cr E Kontelj seconded -

That Council:

  1. enters into an exchange of land agreement (“the agreement”) with Mira Ira Nominees Pty Ltd (“the developer”) to exchange Council reserve at 690 Batman Road, Indented Head for approximately 13.6ha of the developers land on the following conditions;

  2. notes that a management plan for land to be owned by Council will be prepared in consultation with the relevant stakeholders to guide the future use and management of the land;

  3. commence the procedures under sections 189 and 223 of the Local Government Act 1989 to sell Council’s land and that public notice of and the right of a person under s223 of the Act to make submissions be given in the Geelong Independent and Advertiser; and

  4. appoint the Submissions Review Panel to hear and provide a report to the Council on any submissions received; and

  5. in the event that no submissions are received, enter into the agreement and note that the General Manager – Strategy and Performance will execute the agreement.

Cr Heagney left the meeting room at 8:55pm

Cr Heagney re-entered the meeting room at 8:57pm


Carried.


Background

Mira Ira Nominees Pty Ltd (“the developer”) is the developer of the Seabreeze Estate at Indented Head which has been undergoing a staged residential development for a number of years. The developer’s land remaining undeveloped (refer to Attachment 1) is zoned General Residential Zone 2 and there are no overlays or planning controls formally recognising the significant ecological values of parts of that land.

An ecological assessment of both the Council’s and the developer’s land was undertaken for the Council in 2014. Refer to Attachment 3 for a plan of the ecological assessment.

In summary that assessment identified significant fauna and flora including:

In 1988 at the commencement of development of the land, an area of 3.917 ha was set aside as a reserve for municipal purposes with frontage to Batman Road. Apart from routine mowing of the reserve which has been recently introduced, it has never been developed or used for any active recreational purpose.

For over 10 years discussions have been held between the Council and the developer about the future of the municipal reserve and the land with significant ecological values including the possibility of a land exchange.

The Bellarine Peninsula Recreation and Leisure Needs Study (2005) recommended that the Council should actively pursue a land exchange where the developer would obtain the municipal reserve and the Council would obtain the land of ecological significance.


Discussion

Following the ecological assessment in 2014, discussions with the developer have proceeded to the point where there is in-principle agreement to exchange the municipal reserve of 3.917ha for approximately 13.6ha of the developer’s ecological land (refer to plan in Attachment 2). As indicated on the plan, the developer will retain some of its land which will be added to the Council’s land to leave a parcel of 5.7ha in the developer’s ownership.

The land exchange agreement will incorporate the following conditions:

The proposed land exchange is considered beneficial for the following reasons:

No rezoning of land is required prior to settlement, however Council intends to consider appropriate zonings for land it will own following settlement.


Environmental Implications

Attachment 3 provides a plan showing the ecological features of the land proposed to come into Council’s ownership.

The proposed land exchange presents an opportunity for Council to own and preserve one of the two most significant parcels of remnant vegetation that remain in private ownership on the Bellarine Peninsula. Parts of the land of lesser ecological value may be able to be used for alternative more active recreation use as appropriate.

A management plan for the land to be owned by Council will be prepared which will recommend appropriate capital works and annual maintenance programs. There is also an opportunity for community involvement in on going management of the land.

There are no major capital works required for future management purposes although works compromising fencing, walking trails and signage are anticipated. Recurrent costs will be mainly weed control and slashing.


Financial Implications

Consideration for the land exchange is a $95,000 payment to the Council. Council has obtained two valuations of the land it is selling and purchasing and those valuations indicate that the value of the land Council is selling is worth either $90,000 or $100,000 more than the developer’s land being purchased. In the circumstances it is appropriate proceed with the land exchange for a consideration of $95,000 being the average of the differences in the valuations obtained.

Estimates for capital and recurrent costs for Council in relation to the ownership of the land of high ecological significance are:

Preparation of management plan

$17,000

Fencing, gates, paths

$35,000

Other including signage, community event

$7,300

Annual maintenance including mowing

$15,000



Policy/Legal/Statutory Implications

The exchange of land involves an agreement to sell and purchase land. For the sale of the municipal reserve the reserve restriction needs to be removed from the title and a planning permit is required to do this.

Council is also required to give notice of intention to sell land under s189 of the Local Government Act, and any submissions received will be heard by the Submissions Review Panel and a further report will be put to Council.

There are no procedures under the Local Government Act for purchase of the land of ecological significance by the Council.

Council is required to obtain a valuation for the sale of the land, and the two valuations which have been obtained are dated 7 August 2015 and 17 November 2015.


Alignment to City Plan

The proposed exchange of land is consistent with objectives of the Enhance and Protect Natural Areas and Ecosystem Health priority in City Plan 2013/17.


Officer Direct or Indirect Interest

No officers or contractors involved in the preparation of this report have a direct or indirect interest in any matters to which this report relates.


Risk Assessment

There are no significant risks for Council in the ownership and management of the land of high ecological value.


Social Considerations

Ownership of the land by Council provides an opportunity for community involvement in the improvement and management of the land, which has the potential to provide both active and passive recreational opportunities along with the protection and enhancement of land of high ecological significance.


Human Rights Charter

The recommendations of this report and the subsequent exchange of land have no implications relating to the Human Rights Charter.


Consultation and Communication

Public consultation will occur when the proposed transfer of the property is advertised under s189 of the Local Government Act. The exchange of land is supported by the Council’s Recreation and Open Space and Environment Departments.


[Back to List]

11. Grovedale Tennis Club Facilities Upgrade

Portfolio:

Sport & Recreation – Cr Irvine

Source:

Projects, Recreation & Central Geelong

General Manager:

Dean Frost

Index Reference:

C16830 – Grovedale Tennis Club Facilities Upgrade

Purpose
The purpose of this report is to seek direction from Council on project C16830 – Grovedale Tennis Club Facilities Upgrade.

Summary

Cr Richards moved, Cr Irvine seconded -

That Council proceed with the delivery of a pavilion upgrade and refer the lighting upgrade component of the project to a future budget process.

Carried.


Background

The Grovedale Tennis Club (Club) through a community concept proposal as part of the 2015/16 budget requested Council consider funding a pavilion and lighting upgrade.

The existing clubrooms are inadequate to cater for the large number of the community members using the facilities each week.

The installation of competition lighting on an additional two courts will enable increased participation in night tennis.

A renovation of the clubrooms will reduce the pavilions maintenance requirements and provide facilities at a standard expected of a public building.


Discussion

Although the Grovedale Tennis Clubrooms is not identified as a high priority in the Regional Tennis Strategy for upgrade, it is acknowledged that the tennis facilities are inadequate to meet the demand due to current membership numbers.

The Grovedale Tennis Club is part of the Grovedale Sporting Club located on Burdoo Reserve. The Burdoo Reserve has recently had an extensive social room extension, providing options for amenities adjacent to the tennis car park.

Six of the 8 existing courts are currently illuminated for night tennis and this component of the works can reasonably be differed until future budget provision exists.


Environmental Implications

There are no environment implications


Financial Implications

If Council wish to proceed with the full project scope in accordance with the budget description, an additional $55,000 budget allocation will be required.


Policy/Legal/Statutory Implications

There are no policy, legal or statutory implications associated with acceptance of this report.


Alignment to City Plan

This project supports strategic directions in our Community Wellbeing and Sustainable Built & Natural Environment areas.


Officer Direct or Indirect Interest

No council officers involved in this project or report have declared a direct or indirect interest in this matter.


Risk Assessment

A detailed project risk profile has been developed and is being maintained by the project manager.


Social Considerations

Sport and recreation plays a key role in the health of our community. While the physical health of the community is the most apparent benefit, sport and recreation promotes increased mental health, social connection and community leadership.

The provision of Court lighting on two courts will support increased participation in night tennis, and cater for casual public use of the courts.

The renovation and extension of the pavilion will ensure that the community is provided with facilities that allow them to participate in sport and provides an opportunity for social interaction.


Human Rights Charter

It is not evident or likely that this report would negatively impact any of the rights contained in the Charter of Human Rights.


Consultation and Communication

There are no communication issues or requirements associated with acceptance of the proposed recommendation.


[Back to List]

12. Montpellier Drive, Highton - Proposed Footpath Construction SRC345 - Intention to Declare

Portfolio:

Infrastructure – Cr Ellis

Source:

City Services - Engineering Services

General Manager:

William Tieppo

Index Reference:

Special Rates and Charges
Montpellier Drive, Highton


Purpose

This report seeks a resolution by Council to consider an intention to declare a Special Charge Scheme to partially fund the construction of a footpath in Montpellier Drive and Reigate Road, Highton. (See plan – Appendix 4).

Summary

Cr Nelson moved, Cr Ellis seconded -

That Council:

Gives notice of its intention to declare a Special Charge Scheme in accordance with Section 163 (1A) of the Local Government Act 1989 (The Act), as follows:

  1. The Special Charge is declared for a period of five (5) years commencing upon completion of the works.

  2. The Special Charge be declared for the purpose of defraying any expenses incurred by Council in relation to the construction of the footpath on Montpellier Drive and Reigate Road, Highton which:

    1. Will provide proper pedestrian access, improved pedestrian safety and enhancement to the general amenity for each of the properties included in the scheme;

    2. Council considers is or will be a special benefit to those persons required to pay the special charge (and who are described in succeeding parts of this Resolution); and

    3. Arises out of Council’s function of planning for and providing infrastructure for property owners.

  3. The total cost of project, be recorded as $158,729 (Schedule A).

  4. It be recorded that, for the purposes of Section 163 (2A) of the Act, the special charge proceeds will not exceed the amount calculated in accordance with the prescribed formula (R x C = S), the:

    1. ‘benefit ratio’ (R) being calculated at 0.32 represents the special benefits to all persons liable to pay the special charge (Schedule B);

    2. ‘total cost’ (C) of performing the function described in part 1 (b) of this resolution based on estimated cost be recorded as $130,824; and

    3. ‘maximum levy’ (S) be recorded as $41,863.68

  5. the following be specified as the area for which the special rate is so declared:

    1. the area within municipal district of Council highlighted in the plan attached to this Resolution (Appendix 4).

  6. the following be specified as the land in relation to which the special charge so declared:

    1. land within the area shown on the plan.

  7. the following be specified as the criteria which form the basis of the special charge so declared:

    1. ownership of any land described in Part 1(e) of this Resolution.

  8. the following be specified as the manner in which the special charge so declared will be assessed and levied:

    1. Each lot receives an access and amenity benefit;

    2. The maximum levy is divided equally on an access and frontage share basis;

    3. The special charge will be levied by sending a notice to the person who is liable to pay, pursuant to section 163(4) of the Act.

  9. having regard to the preceding parts of this Resolution but subject to Section 166 (1) of the Act, it be recorded that;

    1. the owners of the land described in column 1 of Schedule C to the resolution are estimated liable for the respective amounts set out in column 8 of Schedule C; and

    2. such owners may, subject to any further resolution of Council pay the special charge in the following manner;

      1. the charge will become due and payable within one month of the issue of the notice requesting payment pursuant to Section 167 (3) of the Act;

      2. interest will not be charged for six months after the issue of the notice provided the person liable makes timely payment in accordance with any repayment arrangements that may be agreed on by Council; and

      3. in accordance with Section 172 of the Act, the interest rate payable on the special charge which has not been paid by the specific date is set at Council’s overdraft rate, reviewed every three months (provided that it shall not exceed the rate fixed by the Governor in Council by Order for the purposes of Section 172 (2A) in which case the rate of interest shall be the maximum rate fixed by the Governor in Council by Order for the purposes of this section).

  1. Authorise Council’s Chief Executive Officer to levy the Special Charge in accordance with Section 163 (4) of the Act.

Carried.

*Cr Nelson left the meeting room for the evening at 9:02pm.


Background

Existing footpaths are in place in Lansbury Crescent to the north, Cheam Walk and Lambhill Crescent to the west and Mount Pleasant Road to the south. The construction of the Montpellier Drive and Reigate Road footpaths will provide a new link with these footpaths and improved the pedestrian network around the Montpellier Primary School. It is further considered that the new footpaths will improve pedestrian safety for abutting property owners and the surrounding community.

Requests from residents and the wider community have been received by Council over the years for the need of a footpath along Montpellier Drive. A footpath here is considered to be a complimentary link to the surrounding footpaths and will improve pedestrian access around the Montpellier Primary School.

An attempt at a Special Charge scheme was made in 2005 but this scheme was not presented to Council at the time.

The affected property owners were advised of a new scheme proposal via a mail out in June 2015. The mail out included an explanatory letter, the cost estimate, estimated charges to property owners, a plan and a Special Rates and Charges Brochure. The mail out also included a survey and out of the 20 properties affected by the scheme, 12 property owners responded.

The results included two (2) yes votes for the proposed footpath and ten (10) no votes.


Discussion

When considering the Benefit Ratio for this footpath scheme, it is reasonable that a majority of cost be apportioned to the community benefit when considering the proximity of the Montpellier Primary School. With a calculated Benefit Ratio of 0.32, a majority of funding for this scheme would be coming from Council. The average cost per property is estimated at $2,093 which compares favourably to other recent schemes.

Since the initiation mail out, the scheme has been reviewed. The direct funding by Council has been increased due to the specialised porous paving to be used to protect the root systems of the established nature strip trees.

It is considered reasonable that Council pay the difference in costs over the standard concrete costs for this type of pavement. The result of this review saw a reduction to charges of an average $660 per property.

Of the survey results, there is a majority of objection to the scheme. Of those opposing the scheme, concerns raised and corresponding officer considerations include:

Cost apportionment for the scheme has been divided into access and amenity benefits. It is considered that all abutting properties with direct frontages to the proposed new footpath, regardless of size and shape, receive the same access benefit. Corner properties have received a reduced access benefit due to their double frontage. These properties may potentially be charged for future footpath schemes along their second frontage.

50% of the total benefit has been apportioned to access given the purpose of the scheme. The access benefit includes the provision of an all weather sealed surface that reduces the risk of accidents caused by uneven and slippery surfaces. A new footpath also eliminates the nuisance affect of dust and mud. In simple terms, a new footpath improves accessibility for all abutting properties.

The remaining 50% of benefit is attributed to amenity and this can best be described as the benefit the pathway provides to an abutting property by way of improved aesthetics, safety, enjoyment, comfort and property value.

The amenity benefit is based on the actual footpath frontage to a property when existing driveway extents are taken into consideration. This is known as the apportion-able frontage and is shown at Column 4 of Schedule C.


Environmental Implications

The provision of a sealed pathway provides a permanent and safe means of access. During construction and the manufacture and procurement of materials, energy is used resulting in some greenhouse gas emissions. This stops when construction is complete.

The project does not create waste with the exception of some excavated material.

The proposal does not affect any natural habitats.

The proposal may require some nature strip and property trees and shrubs to be trimmed but removal of vegetation is not expected. A specialised porous pavement is to be used around the root zones of some of the more established trees within the nature strip. This will protect and preserve the tree roots.


Financial Implications

The project is a one off capital cost and there will be minimal ongoing maintenance costs. If approved, the scheme could proceed this financial year. Funding is currently allocated in C15310 Montpellier Drive Footpath ($42,599) and C02303 Footpath Construction Program ($116,130).

Financial details are as follows:

Maximum scheme levy to Property Owners (income)

$41,864

Scheme levy to Council - $88,960

$116,865

Direct Funding by Council to reinstate driveways and construct a supporting retaining wall - $27,905

Total Project Cost

$158,729


From the table above, the total net cost to Council for this project is estimated to be $116,865.


Policy/Legal/Statutory Implications

The scheme has been prepared in accordance with the Special Rate and Charge provisions of the Local Government Act 1989, the 2004 ministerial guidelines, Council’s Special Rates and Charges Policy and community engagement guidelines.


Alignment to City Plan

This report aligns with the City Plan as follows:

Sustainably Built and Natural Environment


Officer Direct or Indirect Interest

In preparing this report, no Council officer has any direct or indirect interest in the properties affected by the scheme.


Risk Assessment

Provision of a sealed footpath will provide safer walking conditions for pedestrians by minimising the risk of personal injuries through conflict with vehicles and the elimination of uneven and slippery surfaces.

There are no identified risks for Council in making its intention to declare the scheme.


Social Considerations

The provision of properly sealed and drained footpath is aligned to Council’s City Plan as described above and provides improved connectivity and safety for pedestrians. It is further considered that the footpath will enhance the general amenity of the area.


Human Rights Charter

In developing this report to Council, the subject matter has been considered to determine if it raises any human rights issues. In particular, whether the scope of any human right established by the Victorian Charter of Human Rights and Responsibilities is in any way limited, restricted or interfered with by the recommendations contained in this report. It is considered that the subject matter does not raise any adverse human rights issues.

It is further considered that the construction of the footpath upholds the right to freedom of movement (Section 12 of the Human rights Charter) by enhancing a person’s ability to move freely within the area they choose to live.


Consultation and Communication

Community consultation for the footpath construction Special Charge Scheme has been carried out as follows:

30 June 2015 – Initiation letter including a concept plan, cost estimate, apportionment of charges, Special Rates and Charges brochure and survey to property owners.

Some phone calls have been received in response to the initiation mail out. Further correspondence will be sent to all affected property owners should Council resolve to make its intention to declare the Special Charge Scheme.


Appendix 1 - SCHEDULE ‘A’

The works for the construction of a footpath in Montpellier Drive and Reigate Road, Highton which consist of excavation, concrete footpath, reinstatement of nature strip, miscellaneous construction works, legal advice and professional services associated with survey, engineering design, drafting, supervision and administration of the project all as included in the cost estimate shown below.


COST ESTIMATE FOR CONSTRUCTION OF FOOTPATH – Montpellier Drive and Reigate Road, HIGHTON

SCHEME - FOOTPATH CONSTRUCTION

ITEM

DESCRIPTION

QUANTITY

UNIT

RATE $

AMOUNT $

1.00

GENERAL

 

 

 

 

1.01

Initial site establishment and set up, decamping and site cleanup and other fixed costs up to time of completion of works.

1

ITEM

$13,000.00

$13,000.00

1.02

Traffic management costs.

1

ITEM

$4,800.00

$4,800.00

1.03

Setting out of works.

1

ITEM

$500.00

$500.00

1.04

Service/Cable locations

1

ITEM

$1,000.00

$1,000.00

1.05

Internal supervision fee (COGG construction)

1

ITEM

$7,000.00

$7,000.00

2.00

EARTHWORKS & DEMOLITION

 

 

 

2.01

Excavation and disposal of all materials to limits of work as indicated on plan, including trimming for new road pavement, excavation of soft spots and removal of concrete.

20

m3

$60.00

$1,200.00

2.02

Saw-cut of concrete and asphalt paving

1

ITEM

$250.00

$250.00

2.03

Remove/Trim of overhanging branches and replacement of trees and disposal as per plan.

1

ITEM

$1,000.00

$1,000.00

3.00

PAVEMENT WORKS

 

 

 

 

3.01

Supply, place and compaction of 20mm Class 2 FCR in pavement area in front of kerb and channel to 300mm deep including, 30mm compacted depth 10mm nominal size type N Asphalt spread and compacted including emulsion prime & grit.

7.00

m2

$155.00

$1,085.00

3.02

Porous paving construct sub & top surface layers including edging, supplied, spread and compacted. 106 m2 $280.00 $29,680.00

 

 

 

 

4.00

CONCRETE WORKS: ` KERBING

 

 

 

 

4.01

Reinforced Concrete Retaining Wall and Footing with F62 mesh including 75mm compacted depth Class 3 FCR bedding and reinstate nature strip.

5

m

$410.00

$2,050.00

4.02

Concrete pram crossing 1.5m wide, including fine crushed rock bedding. 2 No. $250.00 $500.00

 

 

 

 

 

PAVING

 

 

 

 

4.03

125mm (25 Mpa) concrete paving with SL72 mesh including crushed rock bedding and reinstate nature strip.

531

m2

$125.00

$66,375.00

4.04

Remove existing concrete paving and construct 125mm (25 Mpa) concrete paving with SL72 mesh including crushed rock bedding and reinstate nature strip.

19

m2

$146.00

$2,774.00

5.00

SERVICES

 

 

 

 

5.01

Alteration to Telecommunication Assets

1

ITEM

$500.00

$500.00

6.00

LANDSCAPING

 

 

 

 

6.01

Top soiling and seeding nature strips.

70

m2

$8.00

$560.00

SUB-TOTAL :

$132,274

10% CONTINGENCY:

$13,227

Design

$6,614

Administration

$6,614

CONSTRUCTION COST ESTIMATE

$158,729



COUNCIL FUNDED WORKS – Driveway re-establishment, Retaining Wall and porous pavement

ITEM

DESCRIPTION

QUANTITY

UNIT

RATE $

AMOUNT $

1.00

GENERAL

 

 

 

 

1.01

Initial site establishment and set up, decamping and site cleanup and other fixed costs up to time of completion of works.

1

item

$1,000.00

$1,000.00

1.02

Traffic management costs.

1

item

$500.00

$500.00

1.03

Internal supervision fee (COGG construction)

1

item

$500.00

$500.00

2.00

PAVEMENT WORKS

 

 

 

 

2.01

Porous paving construct sub & top surface layers including edging, supplied, spread and compacted.

106

m2

$155.00

$16,430

3.00

CONCRETE WORKS: `

 

 

 

 

3.01

Reinforced Concrete Retaining Wall and Footing with F62 mesh including 75mm compacted depth Class 3 FCR bedding and reinstate nature strip.

5

m

$410.00

$2,050.00

3.02

Remove existing concrete paving and construct 125mm (25 Mpa) concrete paving with SL72 mesh including crushed rock bedding and reinstate nature strip.

19

m2

$146.00

$2,774.00

SUB-TOTAL :

$23,254

10% CONTINGENCY:

$$2,325

Design

$1,395

Administration

$930

CONSTRUCTION COST ESTIMATE

$27,905



Appendix 2 - Benefit Ratio – Schedule ‘B’

 

 

 

 

 

 

A

Purpose

 

To construct a footpath in Montpellier Drive and Reigate Road, Highton to provide all weather pedestrian access for property owners and the wider community.

 

B

Coherence

 

The works will provide a physical pathway connection between Mt Pleasant Road and Lansbury Crescent, between Reigate Road and Culzean Crescent and will provide a special benefit to adjoining and remote properties.

 

C

Total Cost C

 

Total Estimated cost of works - footpath construction

$158,729.00

 

Direct funding by Council to rebuild concrete driveways, a new reinforced concrete retaining wall and contribution towards porous paving

$27,905

 

 

TOTAL COST

$130,824

D

Identify Special Beneficiaries

 

20 properties with frontages to the proposed footpath are considered to receive access and amenity benefits.

 

E

Properties to include

 

The 20 abutting properties receive both access and amenity benefits. Therefore:

 

 

Total Special Benefits (in) is apportioned to 20 properties

 

 

There are no Council owned properties in the scheme. Therefore:

 

 

Total Special Benefits out of the scheme

TSB (out) =

0

 

F

Estimate of Total Special Benefits

 

For this scheme it is considered that the greater proportion of benefit is for pedestrian access given the purpose of the scheme. Therefore it is estimated that 80% of the benefits relate to access and 20% to amenity. Estimated pedestrian use of the paths is 85% for the wider community and 15% for abutting property owners. Amenity benefits are based on frontage with 100% of the footpaths fronting benefiting properties. TSB (in) is therefore calculated as follows:

 

 

TSB (in) = 80% X 15%(access) + 20% X 100% (amenity)

=

32%

 

G

Estimate of Total Community Benefit -TCB

 

It is considered that people in the community will receive a benefit from the works as the pathway is used to access other areas. There are no amenity benefits considered for the wider community. TCB is calculated as follows:

 

 

TCB = 80% X 85%

=

68%

 

H

Calculate "Benefit Ratio" - R

 

Benefits Ratio =

TSB (in)

=

32

0.32

 

 

 

TSB (in) + TSB (out) + TCB

 

32 + 0 + 68

 

 

I

Maximum Total Levy (S)

 

 

Maximum Total Levy S = R X C

$41,863.68

 

Council Contribution to Special Charge Scheme

$88,960.32



Appendix 3 - SCHEDULE ‘C’

SPECIAL CHARGE SCHEME FOR FOOTPATH CONSTRUCTION

MONTPELLIER DRIVE and REIGATE ROAD, HIGHTON

 

COLUMN 1

COLUMN 2

COLUMN 3

COLUMN 4

COLUMN 5

COLUMN 6

COLUMN 7

COLUMN 8

 

PROPERTY ADDRESS

FRONTAGE
(metres)

ALLOWANCE
FOR
DRIVEWAY

APPORTIONABLE
FRONTAGE
(metres)

ACCESS BENEFIT

UNIT ACCESS BENEFIT

AMENITY BENEFIT

ESTIMATED
COST
( $ )

1

2 Montpellier Drive, HIGHTON VIC 3216

16.48

2.30

14.18

1.00

$1,268.60

$781.00

$2,049.60

2

4 Montpellier Drive, HIGHTON VIC 3216

16.00

4.04

11.96

1.00

$1,268.60

$658.63

$1,927.22

3

6 Montpellier Drive, HIGHTON VIC 3216

16.00

2.90

13.10

1.00

$1,268.60

$721.40

$1,989.99

4

8 Montpellier Drive, HIGHTON VIC 3216

19.20

2.52

16.68

1.00

$1,268.60

$918.53

$2,187.13

5

10 Montpellier Drive, HIGHTON VIC 3216

19.20

0.00

19.20

0.50

$ 634.30

$1,057.28

$1,691.58

6

12 Montpellier Drive, HIGHTON VIC 3216

18.29

0.00

18.29

0.50

$ 634.30

$1,006.94

$1,641.24

7

14 Montpellier Drive, HIGHTON VIC 3216

22.86

3.76

19.10

1.00

$1,268.60

$1,051.65

$2,320.24

8

16 Montpellier Drive, HIGHTON VIC 3216

18.29

4.40

13.89

1.00

$1,268.60

$764.67

$2,033.27

9

18 Montpellier Drive, HIGHTON VIC 3216

24.38

4.40

19.98

1.00

$1,268.60

$1,100.32

$2,368.92

10

20 Montpellier Drive, HIGHTON VIC 3216

16.31

0.00

16.31

0.50

$ 634.30

$897.85

$1,532.15

11

22 Montpellier Drive, HIGHTON VIC 3216

20.47

0.00

20.47

0.50

$ 634.30

$1,127.21

$1,761.51

12

24 Montpellier Drive, HIGHTON VIC 3216

24.38

4.80

19.58

1.00

$1,268.60

$1,078.30

$2,346.89

13

25 Montpellier Drive, HIGHTON VIC 3216

26.57

4.10

22.47

1.00

$1,268.60

$1,237.11

$2,505.71

14

26 Montpellier Drive, HIGHTON VIC 3216

21.34

5.38

15.96

1.00

$1,268.60

$878.54

$2,147.13

15

27 Montpellier Drive, HIGHTON VIC 3216

22.86

4.95

17.91

1.00

$1,268.60

$986.12

$2,254.72

16

28 Montpellier Drive, HIGHTON VIC 3216

21.33

0.00

21.33

0.50

$ 634.30

$1,174.32

$1,808.62

17

29 Montpellier Drive, HIGHTON VIC 3216

19.81

4.23

15.58

0.50

$ 634.30

$857.95

$1,492.24

18

262 Mt Pleasant Road, HIGHTON VIC 3216

38.10

2.50

35.60

0.50

$ 634.30

$1,960.14

$2,594.43

19

44 Reigate Road, HIGHTON VIC 3216

29.04

3.70

25.34

1.00

$1,268.60

$1,395.49

$2,664.09

20

46 Reigate Road, HIGHTON VIC 3216

26.24

3.02

23.22

1.00

$1,268.60

$1,278.39

$2,546.99



Appendix 4 - Plan

Plan shwoing properties included in the proposed scheme and the location of the proposed footpath


Attachment 1 - PROCESS CHART

SPECIAL CHARGE PROJECTS –

(Section 163 – Local Government Act 1989)

MONTPELLIER DRIVE & REIGATE ROAD, HIGHTON – PROPOSED FOOTPATH

Stage

Status

Description

Approval to prepare scheme

✓

Decision made to prepare scheme following consideration of surveys of residents and feed back from the community. Council may then place the project in the budget system or proceed immediately to prepare a scheme. Scheme preparation involves survey, design and preparation of an apportionment of costs. June 2015

Intention to Declare Scheme

✓

Report to Council providing information on scheme including advice of impending advertising of scheme and declaration of charge. Seeks Council approval by resolution to proceed with process.

Advertisement

 

The scheme is advertised in the local newspaper and all allotted property owners are notified by mail. This advertisement indicates Council’s intention and notification to ‘declare’ a scheme in a month’s time or at a subsequent meeting.

Submissions

 

From the time of advertising property owners have 28 days (as set down by the Local Government Act) to lodge submissions, either in support or opposition to the scheme.

Submissions Review Panel Hearing

 

A Submissions Review Panel is convened if required (quorum of three Councillors) and meets to consider submissions. Some submissions are written only, and other submitters may wish to be heard before the Panel. The Panel makes a recommendation to Council regarding the scheme.

Declaration Report

 

Any time 28 days after advertising the scheme and after the Submissions Review Panel has met and considered submissions, Council considers a report and may proceed to “declare” the charges in accordance with its advertised intent.

Subsequent to this the Finance Manager issues the levy notices and there is a formal charge placed on the property.

This is the final step in the process for Council to make a decision on the scheme.

Appeal

 

Property owners may lodge an application for review with the Victorian Civil and Administrative Tribunal (VCAT) within one month of issue of the levy notice. An appeal is listed, heard and determined by the Tribunal and this process generally takes three to four months. Decisions made by VCAT are binding on all parties.

Construction

 

Council may then proceed to construct the works. Invoices are issued seeking payment of the estimated cost within one month of commencement.

Final Cost Report

 

At the completion of the works the scheme is “finalised” taking into account actual costs incurred and payments are adjusted accordingly.



[Back to List]

13. Lease of Ocen Grove Golf Club - 9 Guthridge Street, Ocean Grove

Portfolio:

Finance – Cr Lyons (Mayor), Cr Farrell and Cr E Kontelj

Source:

Strategy & Performance – Property & Procurement

General Manager:

Dean Frost

Index Reference:

Subject: Lease of Land


Purpose

The purpose of this report is to recommend that Council enters into a Lease with the Ocean Grove Golf Club for a term of 50 years.

Summary

Cr Farrell moved, Cr Ansett seconded -

That Council:

  1. enter into a Lease with the Ocean Grove Golf Club for a term of 50 years at a commencing rental of $973.44 subject to:

    1. Council officers making appropriate enquiries as to the safety of the location of the 18th hole; and

    2. the Club, prior to entering into the Lease, provide Council with a capital improvement plan for the works it proposes to carry out at the Premises.

  2. notifies Mr Park of Council’s decision and the reasons for that decision.

Cr E Kontelj moved, Cr Richards seconded –/p>

That the report be deferred.

Carried.


Background

On Saturday, 3 October, 2015 Council advertised a statutory notice under s190 of the Act advising of its intention to grant the Lease to the Club for the premises situated at 9 Guthridge Street, Ocean Grove (Premises). The commencing rental for the Lease would be $973.44.

The Club has occupied the Premises for many years. A synopsis of their occupation and leasing history is as follows:

The Club’s current tenure, which Council is bound to, sees them occupying the Premises under the current lease arrangement until 30 June, 2034.


Discussion

Mr Park’s an oral submission before the Panel focused on three main points:

  1. that the current location of the 18th hole is not safe and that he is aware of two particular occasions of golf-ball strike on members of the public;

  2. the Lease should be supported by a capital improvement plan by the Club which details the works that are to be carried out by the Club to improve the Premises so as to warrant the grant of a long-term lease;

  3. The rent should be increased to $30,000.00 plus GST after the first year of the term and increased thereafter by 4%.

Mr Park’s written submission was more expansive than his oral submission to the Panel and included discussion on the following points (in addition to the three referred above):

  1. The ecological diversity of the Premises and the surrounding area;

  2. The Club’s financial disclosures in its end of your financial reporting and their lack of perceived external income;

  3. The lack of market rental being charged to the Club for its tenure;

  4. Justification for a long-term lease (other than from a capital improvement perspective);

  5. The perceived non-adherence or inconsistency of the Club’s tenure with the Bellarine Peninsula Strategic Plan 2006-2016.

Discussions have been had internally with Council’s Leisure Services Unit to request that they carry out appropriate investigations to determine the safety aspects of the 18th hole, particularly, its location and vicinity to the boundary fence of the Premises, the ability of that fence to retain errant golf balls within the Premises and away from the abutting car park. Members of the community use that car park on a daily basis and Mr Park alluded to two personal instances where members of his family have been victims of golf-ball strike.

Mr Park was also concerned at the lack of information perceivably provided by the Club to warrant its request for a long-term lease of 50 years. He would like to see a capital improvement plan provided by the Club which articulates the level of proposed expenditure, the scope of the proposed works and the proposed time line for carrying out those works. To date, it does not appear that information has been provided to Council in any great detail. Discussions have previously been focused on a proposed sale of the Premises to the Club so that the Club could use the freehold title to the Premises as security for financial accommodation from a lender. The sale of the Premises was not supported and a long-term lease of 50 years was seen as a positive compromise, which would give the Club the ability to mortgage the proposed new Lease and to amortise its costs over a longer period.

Regarding the rental, Council currently has 5 other leases with golf clubs in the municipality. Three of those have annual rentals of less than $1,000.00 per annum. The other two both have rental over $30,000.00 per annum however, one of those has commercial sub leases in place where it derives commercial income and the second has gaming and entertainment licenses to derive income from. Therefore, the proposed commencing rental for the new Lease to the Club of $973.44 is inline with leases to other golf clubs within the municipality which have the same operational limits in terms of income derivation. The rent for the new Lease would be increased by 4% annually inline with other similar tenures.


Environmental Implications

The recommendations of this Report have no environmental implications.


Financial Implications

There are no financial implications with the proposed Lease. The proposed Lease income has been account for in the current budget process.

No impact to budget.


Policy/Legal/Statutory Implications

Council has complied with its obligations under ss190 and 223 of the Local Government Act 1989 regarding the proposed Lease.


Alignment to City Plan

The recommendation supports the action priority relating to Responsible and Sustainable Financial management.


Officer Direct or Indirect Interest

No officers involved in the preparation of this report have a director interest in the matters to which this report relates.


Risk Assessment

There are no risk associated with entering into the proposed Lease.


Social Considerations

The effects on the Club and the Ocean Grove community have been taken into account in writing this report.


Human Rights Charter

The recommendations in this Report has no implications relating to the Human Rights Charter.


Consultation and Communication

The Club and Mr Park have been kept informed as to the status of this matter.


[Back to List]

14. Revocation of Flood Prone Area Designation of New Lots at Warralily, Stages 69, 77 and 81

Portfolio:

Infrastructure, Parks & Gardens – Cr Ellis

Source:

City Services – Engineering Services

General Manager:

William Tieppo

Index Reference:

Subject: Drainage - Floods


Purpose

The purpose of this report is to present a revision to the flood mapping for existing conditions produced within the stages of the development of Warralily, Stages 69, 77 and 81.

Summary

Cr Ellis moved, Cr Richards seconded -

That Council revoke the Council designation of 12 December 2006 of flood affected land Warralily, Stages 69, 77 and 81 as liable to flooding pursuant to Regulation 802(2) of the Building Regulations 2006.

Carried.


Background

Designation of land as liable to flooding under Regulation 802 of the Building Regulations 2006 enables the control of floor levels for acceptable building permit applications, or refusal of consent to building applications where there is likely to be a danger to life, health or safety due to flooding. Designation also enables disclosure of flood status within statutory information certificates such as the Land Information Certificate and Building Information Request Form.

The subject of this report is the residential land at Warralily, Mount Duneed fronting 568 – 612 Torquay Road and 82 – 110 Stewarts Road, Mount Duneed. Prior to subdivision the parent lot was used primarily as farmland.

The subdivision at 568 – 612 Torquay Road and 82 – 110 Stewarts Road, Mount Duneed was named Warralily by the developer. The current designated flood extent affects multiple residential lots within the Estate Stages 69, 77 and 81.


Discussion

Overland flows that may occur within the subdivision during the 100 year ARI flood event are now contained within road and drainage reserves in accordance with accepted best practice for development within flood-prone areas. Best practice requires that any overland flows within residential areas satisfy public safety criteria with respect to velocity and depth of flow.

Council has a statutory obligation under the Building Regulations 2006 to designate land as liable to flooding where it reasonably knows it to be prone to flooding. Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.

Attachment 1 shows the existing flood designation. Attachment 2 shows the change in flood mapping at 568 – 612 Torquay Road and 82 – 110 Stewarts Road, Mount Duneed after construction of the subdivision.


Environmental Implications

The revocation of flood-prone areas designation and designation of revised flood data does not result in any known adverse environmental impacts.

The removal of a minimum floor level requirement for new dwellings may result in a minor reduction in energy and material usage during construction. In addition, concrete slab-on-ground construction, which is normally used for a non-elevated floor, achieves the minimum energy rating more readily than a timber floor on stumps.


Financial Implications

The costs of proceeding to revoke the existing designation and to designate the revised flood mapping at 568 – 612 Torquay Road and 82 – 110 Stewarts Road, Mount Duneed, in accordance with the requirements of the Building Regulations 2006, are provided for within the annual recurrent budget.


Policy/Legal/Statutory Implications

The City has various statutory responsibilities for drainage management and flood management (prevention, response and recovery) as set out in the Local Government Act 1989, Local Government Regulations 1990, Planning and Environment Act 1987, Building Regulations 2006, Water Act 1989, Subdivision Act 1988 and Emergency Management Act 1986.

Regulation 802(2) of the Building Regulations 2006 provides Council with the powers to ‘designate’ land liable to flooding. Regulation 802(3) provides that consent must be obtained from Council for an application to build on land liable to flooding.

Section 27 of the Interpretation of Legislation Act 1984 provides the power for Councils to ‘repeal or amend a subordinate instrument made in the exercise of that power’.

Section 807 of the Building Regulations 2006 requires Council to update the municipality’s designated special area maps at the Building Control Commission in the event of alterations to a designated special area. Designated special areas include areas designated as being liable to flooding.

Section 229 of the Local Government Act and Regulation 326 of the Building Regulations provide for the issue of information certificates containing prescribed information, including the flood status of properties.

The revised flood data for 568 – 612 Torquay Road and 82 – 110 Stewarts Road, Mount Duneed will assist the City in meeting its statutory obligations with regard to flood data.

The revised flood data will also assist in fulfilling the recommendations of the Municipal Emergency Management Committee adopted by Council in November 1998 (i.e. mapping of 1 in 100 year flood levels)

Alignment to City Plan

The recommendations of this report are consistent with City Plan, in relation to Growing our Economy and promoting a sustainable built environment, sustainable land use and development.


Officer Direct or Indirect Interest

There are no officer direct or indirect interests with respect to this report.


Risk Assessment

Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study is a key step toward minimising Council’s exposure to these risks.

Council has a risk exposure through its statutory obligations under the Building Regulations 2006 to:

  1. designate land as liable to flooding where it reasonably knows it to be prone to flooding;

  2. specify minimum floor levels in consultation with the relevant floodplain management authority (CCMA); and

  3. refuse consent to building applications where there is likely to be a danger to life, health or safety due to flooding.

Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study Armstrong Creek UGP project is a key step toward minimising Council’s exposure to these risks.

Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.

Designation of land as being liable to flooding can result in extra construction costs and concerns regarding saleability, in some cases.


Social Considerations

Council has a responsibility to the community to provide the best possible information on areas that are flood-prone.


Human Rights Charter

We have taken into consideration the human rights relative to the subject matter of this report, which improves protection of private property.


Consultation and Communication

A revocation of designation does not warrant public consultation as it constitutes the removal of an encumbrance on land.

Relevant Council databases and flood maps will be revised and updates sent to the Corangamite Catchment Management Authority and Building Control Commission.


Appendix 1 - CURRENT FLOOD MAP

Current flood map

Appendix 2 - REVISED FLOOD MAP

Revised flood map

[Back to List]

15. Revocation of Flood Prone Area Designation of New Lots at Warralily, Stages 101 and 104

Portfolio:

Infrastructure, Parks & Gardens – Cr Ellis

Source:

City Services – Engineering Services

General Manager:

William Tieppo

Index Reference:

Subject: Drainage – Floods


Purpose

The purpose of this report is to present a revision to the flood mapping for existing conditions produced within the stages of the development of Warralily, Stages 101 and 104.

Summary

Cr Ellis moved, Cr Richards seconded -

That Council revoke the Council designation of 12 December 2006 of flood affected land Warralily, Stages 101 and 104 as liable to flooding pursuant to Regulation 802(2) of the Building Regulations 2006.

Carried.


Background

Designation of land as liable to flooding under Regulation 802 of the Building Regulations 2006 enables the control of floor levels for acceptable building permit applications, or refusal of consent to building applications where there is likely to be a danger to life, health or safety due to flooding. Designation also enables disclosure of flood status within statutory information certificates such as the Land Information Certificate and Building Information Request Form.

The subject of this report is the residential land at Warralily, Armstrong Creek fronting 2 - 80 Lake Road, Armstrong Creek. Prior to subdivision the parent lot was used primarily as farmland.

The subdivision at 2 - 80 Lake Road, Armstrong Creek was named Warralily by the developer. The current designated flood extent affects multiple residential lots within the Estate Stages 101 and 104.


Discussion

Overland flows that may occur within the subdivision during the 100 year ARI flood event are now contained within road and drainage reserves in accordance with accepted best practice for development within flood-prone areas. Best practice requires that any overland flows within residential areas satisfy public safety criteria with respect to velocity and depth of flow.

Council has a statutory obligation under the Building Regulations 2006 to designate land as liable to flooding where it reasonably knows it to be prone to flooding. Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.

Attachment 1 shows the existing flood designation. Attachment 2 shows the change in flood mapping at 2 - 80 Lake Road, Armstrong Creek after construction of the subdivision.


Environmental Implications

The revocation of flood-prone areas designation and designation of revised flood data does not result in any known adverse environmental impacts.

The removal of a minimum floor level requirement for new dwellings may result in a minor reduction in energy and material usage during construction. In addition, concrete slab-on-ground construction, which is normally used for a non-elevated floor, achieves the minimum energy rating more readily than a timber floor on stumps.


Financial Implications

The costs of proceeding to revoke the existing designation and to designate the revised flood mapping at 2 - 80 Lake Road, Armstrong Creek, in accordance with the requirements of the Building Regulations 2006, are provided for within the annual recurrent budget.


Policy/Legal/Statutory Implications

The City has various statutory responsibilities for drainage management and flood management (prevention, response and recovery) as set out in the Local Government Act 1989, Local Government Regulations 1990, Planning and Environment Act 1987, Building Regulations 2006, Water Act 1989, Subdivision Act 1988 and Emergency Management Act 1986.

Regulation 802(2) of the Building Regulations 2006 provides Council with the powers to ‘designate’ land liable to flooding. Regulation 802(3) provides that consent must be obtained from Council for an application to build on land liable to flooding.

Section 27 of the Interpretation of Legislation Act 1984 provides the power for Councils to ‘repeal or amend a subordinate instrument made in the exercise of that power’.

Section 807 of the Building Regulations 2006 requires Council to update the municipality’s designated special area maps at the Building Control Commission in the event of alterations to a designated special area. Designated special areas include areas designated as being liable to flooding.

Section 229 of the Local Government Act and Regulation 326 of the Building Regulations provide for the issue of information certificates containing prescribed information, including the flood status of properties.

The revised flood data for 2 - 80 Lake Road, Armstrong Creek will assist the City in meeting its statutory obligations with regard to flood data.

The revised flood data will also assist in fulfilling the recommendations of the Municipal Emergency Management Committee adopted by Council in November 1998 (i.e. mapping of 1 in 100 year flood levels).


Alignment to City Plan

The recommendations of this report are consistent with City Plan, in relation to Growing our Economy and promoting a sustainable built environment, sustainable land use and development.


Officer Direct or Indirect Interest

There are no officer direct or indirect interests with respect to this report.


Risk Assessment

Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study is a key step toward minimising Council’s exposure to these risks.

Council has a risk exposure through its statutory obligations under the Building Regulations 2006 to:

  1. designate land as liable to flooding where it reasonably knows it to be prone to flooding;

  2. specify minimum floor levels in consultation with the relevant floodplain management authority (CCMA); and

  3. refuse consent to building applications where there is likely to be a danger to life, health or safety due to flooding.

Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study Armstrong Creek UGP project is a key step toward minimising Council’s exposure to these risks.

Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.

Designation of land as being liable to flooding can result in extra construction costs and concerns regarding saleability, in some cases.


Social Considerations

Council has a responsibility to the community to provide the best possible information on areas that are flood-prone.


Human Rights Charter

We have taken into consideration the human rights relative to the subject matter of this report, which improves protection of private property.


Consultation and Communication

A revocation of designation does not warrant public consultation as it constitutes the removal of an encumbrance on land.

Relevant Council databases and flood maps will be revised and updates sent to the Corangamite Catchment Management Authority and Building Control Commission.


Appendix 1 - CURRENT FLOOD MAP

Current flood map

Apppendix 2 - REVISED FLOOD MAP

Revised flood map
[Back to List]

16. Revocation of Flood Prone Area Designation of New Lots at Armstrong Villawood Estate Stage 17, 18, 28 and 29

Portfolio:

Infrastructure, Parks & Gardens – Cr Ellis

Source:

City Services – Engineering Services

General Manager:

William Tieppo

Index Reference:

Subject: Drainage - Floods


Purpose

The purpose of this report is to present a revision to the flood mapping for existing conditions produced within the early stages of the development of the Armstrong Creek Urban Growth Plan (UGP).

Summary

Cr Ellis moved, Cr Richards seconded -

That Council revoke the Council designation of 12 December 2006 of flood affected land as highlighted as Stages 17, 18, 28 and 29 on Armstrong Creek Urban Growth Plan Flood Map dated 29 November 2006 as liable to flooding pursuant to Regulation 802(2) of the Building Regulations 2006.
Carried.


Background

As part of the development of the Armstrong Creek Urban Growth Plan (UGP) a flood study was undertaken by specialist consulting engineers to identify the extents of the 100 year Average Recurrence Interval flood event for existing conditions. Following a public exhibition phase, the resultant flood mapping (refer to Attachment 1) was designated by Council at its meeting of 12 December 2006, under the provisions of the Building Regulations 2006.

Designation of land as liable to flooding under Regulation 802 of the Building Regulations 2006 enables the control of floor levels for acceptable building permit applications, or refusal of consent to building applications where there is likely to be a danger to life, health or safety due to flooding. Designation also enables disclosure of flood status within statutory information certificates such as the Land Information Certificate and Building Information Request Form.

The subject of this report is the residential land at Armstrong Creek fronting Airport Road and Boundary Road. At the time of the flood study the subject land comprised of two larger lots. Prior to subdivision the parent lot was used primarily as farmland.

The subdivision at 75 Airport Road, Mount Duneed and 193 – 237 Boundary Road, Mount Duneed was named Armstrong Villawood Estate by the developer. The current designated flood extent affects multiple residential lots within the Armstrong Villawood Estate Stages 17, 18, 28 and 29.


Discussion

Overland flows that may occur within the subdivision during the 100 year ARI flood event are now contained within road and drainage reserves in accordance with accepted best practice for development within flood-prone areas. Best practice requires that any overland flows within residential areas satisfy public safety criteria with respect to velocity and depth of flow.

Council has a statutory obligation under the Building Regulations 2006 to designate land as liable to flooding where it reasonably knows it to be prone to flooding. Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.

Attachment 1 shows the existing flood designation. Attachment 2 shows the change in flood mapping at 75 Airport Road, Mount Duneed and 193 – 237 Boundary Road, Mount Duneed after construction of the subdivision.


Environmental Implications

The revocation of flood-prone areas designation and designation of revised flood data does not result in any known adverse environmental impacts.

The removal of a minimum floor level requirement for new dwellings may result in a minor reduction in energy and material usage during construction. In addition, concrete slab-on-ground construction, which is normally used for a non-elevated floor, achieves the minimum energy rating more readily than a timber floor on stumps.


Financial Implications

The costs of proceeding to revoke the existing designation and to designate the revised flood mapping at 75 Airport Road, Mount Duneed and 193 – 237 Boundary Road, Mount Duneed, in accordance with the requirements of the Building Regulations 2006, are provided for within the annual recurrent budget.


Policy/Legal/Statutory Implications

The City has various statutory responsibilities for drainage management and flood management (prevention, response and recovery) as set out in the Local Government Act 1989, Local Government Regulations 1990, Planning and Environment Act 1987, Building Regulations 2006, Water Act 1989, Subdivision Act 1988 and Emergency Management Act 1986.

Regulation 802(2) of the Building Regulations 2006 provides Council with the powers to ‘designate’ land liable to flooding. Regulation 802(3) provides that consent must be obtained from Council for an application to build on land liable to flooding.

Section 27 of the Interpretation of Legislation Act 1984 provides the power for Councils to ‘repeal or amend a subordinate instrument made in the exercise of that power’.

Section 807 of the Building Regulations 2006 requires Council to update the municipality’s designated special area maps at the Building Control Commission in the event of alterations to a designated special area. Designated special areas include areas designated as being liable to flooding.

Section 229 of the Local Government Act and Regulation 326 of the Building Regulations provide for the issue of information certificates containing prescribed information, including the flood status of properties.

The revised flood data for 75 Airport Road, Mount Duneed and 193 – 237 Boundary Road, Mount Duneed will assist the City in meeting its statutory obligations with regard to flood data.

The revised flood data will also assist in fulfilling the recommendations of the Municipal Emergency Management Committee adopted by Council in November 1998 (i.e. mapping of 1 in 100 year flood levels).


Alignment to City Plan

The recommendations of this report are consistent with City Plan, in relation to Growing our economy and promoting a sustainable built environment, sustainable land use and development.


Officer Direct or Indirect Interest

There are no officer direct or indirect interests with respect to this report.


Risk Assessment

Council has a risk exposure through its statutory obligations under the Building Regulations 2006 to:

  1. designate land as liable to flooding where it reasonably knows it to be prone to flooding;

  2. specify minimum floor levels in consultation with the relevant floodplain management authority (CCMA); and

  3. refuse consent to building applications where there is likely to be a danger to life, health or safety due to flooding.

Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study Armstrong Creek UGP project is a key step toward minimising Council’s exposure to these risks.

Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone. Designation of land as being liable to flooding can result in extra construction costs and concerns regarding saleability, in some cases.


Social Considerations

Council has a responsibility to the community to provide the best possible information on areas that are flood-prone.


Human Rights Charter

We have taken into consideration the human rights relative to the subject matter of this report, which improves protection of private property.


Consultation and Communication

The current designation was undertaken following a public exhibition in October 2006 with notification of affected property owners. These owners were sent letters and fact sheets with an invitation for submissions.

A revocation of designation does not warrant public consultation as it constitutes the removal of an encumbrance on land.

The owners of properties affected by the revocation will be notified so they are aware that disclosure of flood status on a Section 32 Vendors Statement is no longer required.

Relevant Council databases and flood maps will be revised and updates sent to the Corangamite Catchment Management Authority and Building Control Commission.


Attachment 1 - Stages 17 and 18 BEFORE

Stage2 17 and 18 before

Attachment 2 - Stages 17 and 18 AFTER

Stage2 17 and 18 after

Attachment 3 - Stages 28 and 29 BEFORE

Stage2 28 and 29 before

Attachment 4 - Stages 28 and 29 AFTER

Stage2 28 and 29 after

[Back to List]

17. Revocation of Flood Prone Area Designation of New Lots at Lara Central, Lara Stage 3

Portfolio:

Infrastructure, Parks & Gardens – Cr Ellis

Source:

City Services – Engineering Services

General Manager:

William Tieppo

Index Reference:

Subject: Drainage - Floods

Report to:

Council


Purpose

The purpose of this report is to present a revision to the flood mapping for existing conditions produced within the stages of the development of Lara Central, Lara.

Summary

Cr Ellis moved, Cr Richards seconded -

That Council revoke the Council designation of 26 October 2004 of flood affected land Lara Central, Stage 3 as liable to flooding pursuant to Regulation 802(2) of the Building Regulations 2006.

Carried.


Background

Designation of land as liable to flooding under Regulation 802 of the Building Regulations 2006 enables the control of floor levels for acceptable building permit applications, or refusal of consent to building applications where there is likely to be a danger to life, health or safety due to flooding. Designation also enables disclosure of flood status within statutory information certificates such as the Land Information Certificate and Building Information Request Form.

The subject of this report is the residential land at Lara Central, Lara fronting 40 and 50, 5 and 55 Caddys Road, Lara. Prior to subdivision the parent lot was used primarily as farmland.

The subdivision at 40 and 50, 5 and 55 Caddys Road, Lara was named Lara Central by the developer. The current designated flood extent affects multiple residential lots within the Estate Stage 3.


Discussion

Overland flows that may occur within the subdivision during the 100 year ARI flood event are now contained within road and drainage reserves in accordance with accepted best practice for development within flood-prone areas. Best practice requires that any overland flows within residential areas satisfy public safety criteria with respect to velocity and depth of flow.

Council has a statutory obligation under the Building Regulations 2006 to designate land as liable to flooding where it reasonably knows it to be prone to flooding. Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.

Attachment 1 shows the existing flood designation. Attachment 2 shows the change in flood mapping at 40 and 50, 5 and 55 Caddys Road, Lara after construction of the subdivision.


Environmental Implications

The revocation of flood-prone areas designation and designation of revised flood data does not result in any known adverse environmental impacts.

The removal of a minimum floor level requirement for new dwellings may result in a minor reduction in energy and material usage during construction. In addition, concrete slab-on-ground construction, which is normally used for a non-elevated floor, achieves the minimum energy rating more readily than a timber floor on stumps.


Financial Implications

The costs of proceeding to revoke the existing designation and to designate the revised flood mapping at 40 and 50, 5 and 55 Caddys Road and 121 Flinders Avenue, Lara, in accordance with the requirements of the Building Regulations 2006, are provided for within the annual recurrent budget.


Policy/Legal/Statutory Implications

The City has various statutory responsibilities for drainage management and flood management (prevention, response and recovery) as set out in the Local Government Act 1989, Local Government Regulations 1990, Planning and Environment Act 1987, Building Regulations 2006, Water Act 1989, Subdivision Act 1988 and Emergency Management Act 1986.

Regulation 802(2) of the Building Regulations 2006 provides Council with the powers to ‘designate’ land liable to flooding. Regulation 802(3) provides that consent must be obtained from Council for an application to build on land liable to flooding.

Section 27 of the Interpretation of Legislation Act 1984 provides the power for Councils to ‘repeal or amend a subordinate instrument made in the exercise of that power’.

Section 807 of the Building Regulations 2006 requires Council to update the municipality’s designated special area maps at the Building Control Commission in the event of alterations to a designated special area. Designated special areas include areas designated as being liable to flooding.

Section 229 of the Local Government Act and Regulation 326 of the Building Regulations provide for the issue of information certificates containing prescribed information, including the flood status of properties.

The revised flood data for 40 and 50, 5 and 55 Caddys Road, Lara will assist the City in meeting its statutory obligations with regard to flood data.

The revised flood data will also assist in fulfilling the recommendations of the Municipal Emergency Management Committee adopted by Council in November 1998 (i.e. mapping of 1 in 100 year flood levels).


Alignment to City Plan

The recommendations of this report are consistent with City Plan, in relation to Growing our Economy and promoting a sustainable built environment, sustainable land use and development.


Officer Direct or Indirect Interest

There are no officer direct or indirect interests with respect to this report.


Risk Assessment

Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study is a key step toward minimising Council’s exposure to these risks.

Council has a risk exposure through its statutory obligations under the Building Regulations 2006 to:

  1. designate land as liable to flooding where it reasonably knows it to be prone to flooding;

  2. specify minimum floor levels in consultation with the relevant floodplain management authority (CCMA); and

  3. refuse consent to building applications where there is likely to be a danger to life, health or safety due to flooding.

Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study Armstrong Creek UGP project is a key step toward minimising Council’s exposure to these risks.

Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone. Designation of land as being liable to flooding can result in extra construction costs and concerns regarding saleability, in some cases.


Social Considerations

Council has a responsibility to the community to provide the best possible information on areas that are flood-prone.


Human Rights Charter

We have taken into consideration the human rights relative to the subject matter of this report, which improves protection of private property.


Consultation and Communication

A revocation of designation does not warrant public consultation as it constitutes the removal of an encumbrance on land.

Relevant Council databases and flood maps will be revised and updates sent to the Corangamite Catchment Management Authority and Building Control Commission.


Appendix 1 - CURRENT FLOOD MAP

Current flood map

Appendix 2 - REVISED FLOOD MAP

Revised flood map

[Back to List]

18. Portarlington North East Group Road Construction Special Charge Scheme SRC340 - Declaration of Charge

Portfolio:

Infrastructure - Cr Ellis

Source:

City Services - Engineering Services

General Manager:

William Tieppo

Index Reference:

Council Reports 2016, Special Rates and Charges


Purpose

The purpose of this report is to seek a resolution by Council to declare a special charge to property owners for road construction in Portarlington (See Plan – Appendix 4).

Summary

Cr Ellis moved, Cr Macdonald seconded -

That Council:

  1. Resolves to declare the Special Charge Scheme as follows:

    1. The Special Charge is declared for a period of five (5) years commencing upon completion of the works and scheme finalisation.

    2. The special charge be declared for the purposes of reducing costs to Council in relation to the construction of roads for all local unsealed streets bounded by Fisher, Clarke, Mercer and Hood Streets, Portarlington which:

      1. will provide proper sealed road access, improved nature strip drainage and enhancement to the general amenity for each of the properties included in the scheme;

      2. Council considers will be a special benefit to those persons required to pay the special charge (and who are described in succeeding parts of this Resolution); and

      3. arises out of Council’s function of planning for and providing infrastructure for property owners.

    3. it be recorded that, for the purposes of Section 163 (2A) of the Act, the special charge proceeds will not exceed the amount calculated in accordance with the prescribed formula (R x C = S), the:

      1. 'benefit ratio’ (R) being calculated at 0.87 represents the special benefits to all persons liable to pay the special charge; and

      2. ‘total cost’ (C) of performing the function described in Part b of this Resolution based on estimated cost be recorded as $3,888,839 as amended.

      3. ‘maximum levy’ (S) total amount of the special charge be levied and be recorded as $3,368,546 as amended.

    4. the following be specified as the area for which the special rate is so declared:

      1. the area within municipal district of Council highlighted in the plan attached to this Resolution (“the area”).

    5. the following be specified as the land in relation to which the special charge so declared:

      1. All land within the area shown on the plan.

    6. the following be specified as the criteria which form the basis of the special charge so declared:

      1. Ownership of any land described in Part e of this Resolution.

    7. the following be specified as the manner in which the special charge so declared will be assessed and levied:

      1. The costs to be apportioned based on access and amenity benefits.

      2. The special charge will be levied by sending a notice to the person who is liable to pay, pursuant to section 163(4) of the Act.

    8. having regard to the preceding parts of this Resolution but subject to Section 166 (1) of the Act, it be recorded that:

      1. the owners of the land described in column 2 and 3 of Schedule C to the Resolution are estimated liable for the respective amounts set out in column 7 of Schedule C; and

      2. such owners may, subject to any further resolution of Council pay the special charge in the following manner:

        1. the charge will become due and payable within one month of the issue of the notice requesting payment pursuant to Section 167 (3) of the Act;

        2. interest will not be charged for six months after the issue of the notice provided the person liable makes timely payment in accordance with any repayment arrangements that may be agreed on by Council; and

        3. in accordance with Section 172 of the Act, the rate of interest which is payable on the special charge which has not been paid by the specified date is set at Council’s overdraft rate, reviewed every three months (provided that it shall not exceed the rate fixed by the Governor in Council by Order for the purposes of Section 172 (2A) in which case the rate of interest shall be the maximum rate fixed by the Governor in Council by Order for the purposes of this section).

  1. Authorise Council’s Chief Executive Officer to levy the Special Charge in accordance with Section 163(4) of the Act.

Carried.


Background

On 17 February 2015, Council resolved to give notice of its intention to declare a Special Charge Scheme for the construction of roads in the north east section of Portarlington.

During the subsequent submission period, 16 objections were received from the potential 502 affected properties. Of these, three property owners requested to speak to the panel members.

Council held the panel hearing on Tuesday 27 October 2015. Of the three (3) property owners who requested to be heard, two (2) were absent from the hearing. Approximately 50 people were in attendance and once the formal presentation was complete, the meeting was open for comment from the floor. A further 18 property owners addressed the panel and although some were opposed to the roads, there was a slight majority of people in support of the scheme. Some presenters simply wanted some further explanation and some had related concerns about drainage issues.

After considering all submissions, both verbal and written, the panel has recommended the scheme proceed with two changes of which are detailed below.


Discussion

The submissions panel has recommended the scheme proceed with two changes. After hearing from property owners there was a common belief from unit owners that their charges were too high. The first change to the scheme has seen a reduction in front unit charges of a multi unit development site.

In the original scheme these properties received a full benefit due to their full access benefit and frontage to the new road. The amended scheme has reduced the amenity charge for these units which results in a $905 reduction to their charge. The same principle has been applied to smaller properties that have been subdivided from a parent lot.

The result of the first change increased the charge to the remaining property owners. To counteract this adverse affect, the second change to the scheme is to increase Council’s contribution by $109,000. This fund injection maintains the current charges for all remaining properties in the scheme and is considered to be a reasonable compromise. The revised funding implications are shown below and at Appendix 2.


Environmental Implications

The road infrastructure proposal provides proper sealed access, improved drainage and a generally safer environment for pedestrian and vehicular traffic. Dust is eliminated and storm water runoff is less contaminated with silt prior to final discharge into the Bay.

It is anticipated that minimal vegetation removal will be required to complete the project.

During the course of construction and the manufacture and procurement of materials, there is some energy use and greenhouse gas emissions. This stops when construction is complete.

The project does not create waste with the exception of some excess spoil. The proposal does not affect any natural habitats.


Financial Implications

The project has a one off capital cost and there will be minimal ongoing maintenance costs. Funding for this scheme will be considered in the 2016/17 budget process.

A breakdown of costs is as follows:

Estimated amended scheme cost to property owners

 

$3,368,546

Estimated scheme cost to Council -

$520,293

$1,055,971

Estimated direct cost to Council for improved roadside drainage, intersection safety and lighting -

$426,678

Additional scheme cost to Council post panel hearing considerations -

$109,000

Total Project Cost

 

$4,424,517


The total revised estimated net cost to Council for this project is $1,055,971.


Policy/Legal/Statutory Implications

The scheme has been prepared in accordance with the Special Rate and Charge provisions of the Local Government Act 1989 along with Council’s Special Rates and Charges Policy.


Alignment to City Plan

This report aligns with the City Plan as follows:

Community Wellbeing:

Sustainably Built and Natural Environment


Officer Direct or Indirect Interest

No Council Officer involved with this process has any direct or indirect interest in the properties.


Risk Assessment

Provision of sealed roads will provide safer driving conditions for motorists with a defined and more standard road profile. Walking conditions for pedestrians will also be enhanced by minimising the risk of personal injuries through conflict with vehicles. The improved drainage will reduce the hazards associated with water over roads and the affects of nuisance flooding to property. There are no identified risks for Council in making its intention to declare the scheme.


Social Considerations

The provision of properly sealed and drained roadways is aligned to Council’s City Plan as described above and provides improved connectivity and safety for motorists and pedestrians.


Human Rights Charter

In developing this report to Council, the subject matter has been considered to determine if it raises any human rights issues. In particular, whether the scope of any human right established by the Victorian Charter of Human Rights and Responsibilities is in any way limited, restricted or interfered with by the recommendations contained in this report. It is considered that the subject matter does not raise any adverse human rights issues.

It is further considered that the construction of the Portarlington Roads upholds the right to freedom of movement (Section 12 of the Human rights Charter) by enhancing a person’s ability to move freely within the area they choose to live.


Consultation and Communication

Community consultation of the road construction Special Charge Scheme has been carried out as follows:

Further correspondence will be sent to all affected property owners should Council resolve to make its Declaration of charges.


Appendix 1 - Page 1

COST ESTIMATE FOR CONSTRUCTION OF ROADS

PORTARLINGTON NORTH EAST GROUP

The works for the construction of roads in Portarlington which consist of excavation, drainage improvements, intersection improvements, reinstatement of nature strips, legal advice and professional services associated with survey, engineering design, supervision and administration of the project as included in the cost estimate as shown below.

ESTIMATED TOTAL COST OF ROAD CONSTRUCTION

ITEM

DESCRIPTION

QUANTITY

UNIT

RATE $

AMOUNT $

1.00

GENERAL

 

 

 

 

1.01

Initial site establishment and set up, decamping and site cleanup and other fixed costs up to time of completion of works.

1.00

Item

$90,000.00

$90,000.00

1.02

Traffic management costs.

1.00

Item

$72,000.00

$72,000.00

1.03

Setting out of works.

1.00

Item

$9,000.00

$9,000.00

1.04

Service / Cable locations

1.00

Item

$6000.00

$6,000.00

2.00

EARTHWORKS & DEMOLITION

 

 

 

 

2.01

Excavation and disposal of all materials to limits of work as indicated on plan, including trimming for new road pavement, excavation of soft spots and removal of concrete.

18868.00

m3

$45.00

$849,060.00

2.02

Placement and consolidation of engineered fill with approved materials in preparation for new works.

631.00

m3

$30.00

$18,930.00

2.03

Trimming / Removal and disposal of trees.

 

Item

 

 

2.04

Saw-cutting of Asphalt paving.

897.00

m

$10.00

$8,970.00

2.05

Saw-cut of concrete kerb and channel

30.00

m

$10.00

$300.00

3.00

PAVEMENT WORKS

 

 

 

 

3.01

250mm compacted depth Class 1 20mm crushed rock, supplied, spread and compacted.

15781.70

m3

$105.00

$1,657,078.50

3.02

30mm compacted depth 10mm nominal size type N Asphalt spread and compacted including emulsion prime & grit using a paver.

8199.89

m2

$25.00

$204,997.35

3.03

7mm Primer Seal, supplied and placed.

54398.52

m2

$8.00

$435,188.19

3.04

Prepare existing pavement for sealing.

54398.52

m2

$1.00

$54,398.52

4.00

SERVICES

 

 

 

 

4.01

50mm dia UPVC conduits, supplied and laid including back-filling of trench.

200.00

m

$70.00

$14,000.00

5.00

LANDSCAPING

 

 

 

 

5.01

Top soiling and seeding nature strips, next to kerb replacement

46.00

m2

$8.00

$368.00

6.00

SIGNING, LINE-MARKING AND FENCING

 

 

 

 

6.01

Erection of new permanent signs and posts D4-2-1.

12.00

No

$250.00

$3,000.00

6.02

Relocation of existing signs and posts (Give way & Stop).

40.00

No

$150.00

$6,000.00

6.03

Repaint or install new line-marking 30m long intersection approach lines, repaint or install new statcon line marking at all intersections bounded by, The Esplanade, Fisher St, Hood Road and Mercer St

42.00

Item

$1.00

$42.00

6.04

R.R.P.M. Two way direction, supplied and placed.

90.00

No

$12.00

$1,080.00

6.05

Supply and placement of Guide Posts and delineators.

200.00

No

$80.00

$16,000.00

7.00

PROVISIONAL ITEMS

 

 

 

 

7.01

Excavation and stockpiling of suitable existing road material for re-use of in place of lower subgrade FCR (price is cost saving over import of new quarry product)

4500.00

m3

-

$30.00

SUB-TOTAL

$3,446,413

10% Contingency

$344,641

Design

$103,392

Project Administration

$103,392

CONSTRUCTION COST ESTIMATE

$3,997,839



ESTIMATED COST FOR DRAINAGE IMPROVEMENTS, KERB AND CHANNEL REPLACEMENT AND STREET LIGHTING

ITEM

DESCRIPTION

QUANTITY

UNIT

RATE $

AMOUNT $

1.00

GENERAL

 

 

 

 

1.01

Initial site establishment and set up, decamping and site cleanup and other fixed costs up to time of completion of works.

1

Item

$10,000.00

$10,000.00

1.02

Traffic management costs.

1

Item

$8,000.00

$8,000.00

1.03

Setting out of works.

1

Item

$1,000.00

$1,000.00

2.00

DRAINAGE

 

 

 

 

 

PIPES

 

 

 

 

2.01

Connection of existing household storm-water discharge drains including excavation, supply, placement and provision of approved backfill to drainage pits.

2

No.

$250.00

$500.00

2.02

300mm dia RC pipe, supplied, laid and jointed including excavation, placement of approved fine crushed rock bedding and back-filling with approved FCR. (19)

6

m

$160.00

$960.00

2.03

375mm dia RC pipe, supplied, laid and jointed including excavation, placement of approved fine crushed rock bedding and back-filling with approved FCR. (11-12,24)

13.45

m

$180.00

$2,421.00

2.04

525mm dia RC pipe, supplied, laid and jointed including excavation, placement of approved fine crushed rock bedding and back-filling with approved FCR.

8

m

$275.00

$2,200.00

 

BOX CULVERTS

 

 

 

 

2.05

300x150 RC box culverts, supplied, laid and jointed including excavation, placement of approved fine crushed rock bedding and backfilling with approved material. (18)

2.4

m

$275.00

$660.00

 

PITS: SEP

 

 

 

 

2.06

900mm x 600mm SEP, less than 1.5m deep with Gatic type cover, supplied and placed including excavation, placement of approved fine crushed rock bedding and back-filling with approved material. (12)

1

No.

$1,400.00

$1,400.00

 

PITS : JP

 

 

 

 

2.07

900mm x 600mm junction pit, less than 1.5m deep with Gatic cover, butted to driveable endwall supplied and placed including excavation, placement of approved fine crushed rock bedding and back-filling with approved material. (25) 1 No. $2,100.00 $2,100.00

 

 

 

 

2.08

900mm x 600mm junction pit, less than 1.5m deep with Grated cover, supplied and placed including excavation, placement of approved fine crushed rock bedding and back-filling with approved material. (23,24) 2 No. $1,600.00 $3,200.00

 

 

 

 

2.09

1200mm x 900mm junction pit 1.50m to 2.00m deep with Gatic type cover, supplied and placed including excavation, placement of approved fine crushed rock bedding and back-filling with approved material. (11,16)

2

No.

$2,000.00

$4,000.00

2.10

1200mm x 900mm junction pit 1.5m to 2.00m deep with sloped grated cover, supplied and placed including excavation, placement of approved fine crushed rock bedding and back-filling with approved material. (15)

1

No.

$2,500.00

$2,500.00

2.11

Supply and fit "Bates" modified driveable endwall to existing pipe. (30,31)

2

No.

$750.00

$1,500.00

2.12

Modify existing DSE.pit raise lids to match new level and convert to double grated. (18,19,21,32)

4

No.

$1,375.00

$5,500.00

2.13

Modify existing pit to match finished surface level (22,26,28,29,31)

3

No.

$450.00

$1,350.00

2.14

Modify existing pit to match finished surface level and supply and fit Grated Class D cover. (8,10,13,14,17,30)

8

No.

$770.00

$6,160.00

2.15

Rural vehicle crossing 300mm diam. RC pipe, 3.6m wide with VicRoads driveable endwalls as per SD00603, supplied, laid and jointed including excavation, placement of approved FCR bedding and backfill.

40

No.

$2,500.00

$100,000.00

2.16

Supply and install 300mm diam. RC pipe, with single VicRoads driveable endwalls as per SD00603, supplied, laid and jointed including excavation, tap into existing pit, placement of approved FCR bedding and backfill.


8.4m long (1)

1

Item

$2,094.00

$2,094.00

2.4m long (2,6,7,8)

4

Item

$1,134.00

$4,536.00

4.8m long (3)

1

Item

$1,518.00

$1,518.00

7.2m long (5,17)

2

Item

$1,902.00

$3,804.00

2.17

Supply and install 375mm diam. RC pipe, with VicRoads driveable endwalls as per SD00603, supplied, laid and jointed including excavation, tap into existing pit, placement of approved FCR bedding and backfill.

 

 

 

 

11.5m long (4,16)

2

Item

$2,844.00

$5,688.00

2.18

Extend existing 300mm diam. RC pipe approx 1.2m, with Bates style driveable endwalls, supplied, laid and jointed including excavation. (33,34)

2

Item

$950.00

$1,900.00

3.00

CONCRETE WORKS KERBING: `

 

 

 

 

3.01

Remove existing concrete kerb and construct B2 Barrier kerb and channel 450mm wide and reinstate nature strip.

46

m

$100.00

$4,600.00

4.00

SERVICE AUTHORITIES

 

 

 

 

4.01

Addition of street light pole including footing.

20

No

$10,000.00

$200,000.00

SUB-TOTAL

$377,591

10% Contingency

$37,759

Design

$11,328

CONSTRUCTION COST ESTIMATE

$426,678



Appendix 2

Benefit Ratio Calculation – SCHEDULE ‘B’

A

Purpose

 

 

To construct roads in Portarlington bounded by Fisher Street, The Esplanade, Mercer Street and Hood Street to provide a sealed access for all property owners.

 

B

Coherence

 

 

The works are located in the North East section of Portarlington. The works will provide a special benefit to adjoining properties.

 

C

Total Cost C

 

 

Total Estimated cost of works - Spray seal road construction, roadside drainage and intersection safety improvements including signage

$4,424,517.00

 

Direct funding by Council for intersection safety and drainage improvements

$426,678.00

 

Direct funding by Council post submissions panel considerations

$109,000.00

 

TOTAL COST

$3,888,839.00

D

Special Beneficiaries

 

 

501 properties with frontages to the proposed roads to be constructed are considered to receive access and amenity benefits.

 

E

Estimate of Total Special Benefits out of the scheme -TSB (out)

 

 

There are three (3) crown land parcels and three (3) crown land reserves that are considered to receive special benefit but are out of the scheme. The access and amenity benefits to these parcels equate to 118 BU when considered in isolation.

 

 

Properties Excluded TSB (out)

 

=

118 BU

 

 

F

Estimate of Total Special Benefits in the scheme - TSB (in)

 

 

We will consider the total benefits to each property in terms of Benefit Units (BU). The construction of the Portarlington North East road network is considered to provide special benefit to the abutting properties in terms of access (1.0BU) and amenity(1.0BU). Not all properties receive a full benefit. There are 502 allotments receiving benefit from the scheme at a total of. 929.875 BU

 

 

Properties Included TSB (in)

 

=

929.875 BU

 

 

G

Estimate of Total Community Benefit -TCB

 

 

It is considered that people in the community will receive a benefit from the works as the roads are used to access other areas. There are no amenity benefits considered for the general community. Based on the number of properties (205 to the East of Mercer Street), it is considered that these properties will gain a reduced access benefit. The access benefit has been allocated at 0.125BU per property representing a Total Community Benefit of 205 X 0.125 = 25.625 BU

 

 

 

TCB

=

25.625 BU

 

 

H

Calculate "Benefit Ratio" - R

 

 

 

 

 

 

Benefits Ratio =

TSB (in)

=

929.875

0.866

 

 

 

TSB (in) + TSB (out) + TCB

 

929.875+118+25.625

 

 

I

Maximum Total Levy (S)

 

 

Maximum Total Levy S = R X C

$3,368,546.03

 

Council Contribution to Special Charge Scheme

$520,292.97



Appendix 3

SCHEDULE “C”

PROPOSED SPECIAL CHARGE

STREET SCHEME CONSTRUCTION NORTH EAST PORTARLINGTON

COLUMN 1

COLUMN 2

COLUMN 3

COLUMN 4

COLUMN 5

COLUMN 6

COLUMN 7

Prop Key

Address

Legal Details

Amenity Benefit BU

Access Benefit BU

Total

Charges

264714

1/19 Batman Street, Portarlington

Lot 1 SP 25528

0.5

0.5

1

$3,623

264715

2/19 Batman Street, Portarlington

Lot 2 SP 25528

0.75

0.5

1.25

$4,528

244536

28 Batman Street, Portarlington

Lot 4 LP 34989

1

1

2

$7,245

244537

30 Batman Street, Portarlington

Lot 5 LP 34989

1

1

2

$7,245

329810

34 Batman Street, Portarlington

Lot 2 PS 536904

0.75

1

1.75

$6,340

244524

35 Batman Street, Portarlington

Lot 21 LP 55642

1

1

2

$7,245

244538

36 Batman Street, Portarlington

Lot 2 TP 885632, Lot 1 TP 885632

1

1

2

$7,245

244525

37 Batman Street, Portarlington

Lot 20 LP 55642

1

1

2

$7,245

244539

38 Batman Street, Portarlington

Lot 1 TP 17281

1

1

2

$7,245

244526

39 Batman Street, Portarlington

Lot 19 LP 55642

1

1

2

$7,245

244540

40 Batman Street, Portarlington

Lot 9 LP 98789

1

1

2

$7,245

244527

41 Batman Street, Portarlington

Lot 18 LP 55642

1

1

2

$7,245

244541

42 Batman Street, Portarlington

Lot 10 LP 98789

1

1

2

$7,245

244528

43 Batman Street, Portarlington

Lot 1 TP 281749

1

1

2

$7,245

244529

45 Batman Street, Portarlington

CA 2 Sec 4

1

1

2

$7,245

335010

1/47 Batman Street, Portarlington

Lot 1 PS 603702

0.75

1

1.75

$6,340

335011

2/47 Batman Street, Portarlington

Lot 2 PS 603702

0.5

1

1.5

$5,434

244531

49 Batman Street, Portarlington

Lot 1 TP 261786

1

1

2

$7,245

338697

63 Batman Street, Portarlington

Lot 2 PS 605410

0.75

1

1.75

$6,340

338696

1/63 Batman Street, Portarlington

Lot 1 PS 605410

0.75

1

1.75

$6,340

335492

65 Batman Street, Portarlington

Lot 1 PS 606271

1

1

2

$7,245

345541

66 Batman Street, Portarlington

Lot 2 PS 636046

0.75

1

1.75

$6,340

247593

2 Clarke Street, Portarlington

Lot 1 LP 62821

0.125

0.25

0.375

$1,358

247594

4 Clarke Street, Portarlington

Lot 2 LP 62821

0.25

0.25

0.5

$1,811

247595

6 Clarke Street, Portarlington

Pt CA 3 Sec 5A

0.25

0.25

0.5

$1,811

247596

8 Clarke Street, Portarlington

Pt CA 4 Sec 5A

0.25

0.25

0.5

$1,811

247597

10 Clarke Street, Portarlington

Lot 1 TP 125038

0.25

0.25

0.5

$1,811

247598

12 Clarke Street, Portarlington

Lot 1 LP 119236

0.25

0.25

0.5

$1,811

247599

1/14 Clarke Street, Portarlington

Lot 1 RP 15269

0.125

0.25

0.375

$1,358

247600

2/14 Clarke Street, Portarlington

Lot 2 RP 15269

0.125

0.25

0.375

$1,358

247601

16 Clarke Street, Portarlington

Lot 4 LP 21207

0.25

0.25

0.5

$1,811

247602

18 Clarke Street, Portarlington

Pt CA 10 Sec 5A

0.25

0.25

0.5

$1,811

247603

20 Clarke Street, Portarlington

Pt CA 10 Sec 5A

0.25

0

0.25

$906

247604

22 Clarke Street, Portarlington

Pt CA 1 Sec 6A

0.125

0.25

0.375

$1,358

247605

24 Clarke Street, Portarlington

Lot 1 TP 614654

0.25

0.25

0.5

$1,811

267514

1/26 Clarke Street, Portarlington

Lot 1 SP 29348

0.125

0.25

0.375

$1,358

267515

2/26 Clarke Street, Portarlington

Lot 2 SP 29348

0.125

0.25

0.375

$1,358

267516

3/26 Clarke Street, Portarlington

Lot 3 SP 29348

0.125

0.25

0.375

$1,358

247607

28 Clarke Street, Portarlington

Lot 1 TP 837887

0.25

0.25

0.5

$1,811

247608

30 Clarke Street, Portarlington

Lot 1 TP 243124

0.25

0.25

0.5

$1,811

247609

32 Clarke Street, Portarlington

Lot 1 LP 48221

0.25

0.25

0.5

$1,811

247610

34 Clarke Street, Portarlington

Lot 1 LP 88568

0.25

0.25

0.5

$1,811

247611

36 Clarke Street, Portarlington

Lot 1 TP 322631

0.25

0.25

0.5

$1,811

247612

38 Clarke Street, Portarlington

Lot 1 TP 663834

0.25

0.25

0.5

$1,811

337779

40 Clarke Street, Portarlington

Lot 1 PS 608405

1

0.25

1.25

$4,528

247614

42 Clarke Street, Portarlington

Lot 1 TP 82204

1

1

2

$7,245

350152

61A Clarke Street, Portarlington

Lot 1 PS 703213

0.5

1

1.5

$5,434

350153

61 B Clarke Street, Portarlington

Lot 2 PS 703213

0.75

1

1.75

$6,340

247624

62 Clarke Street, Portarlington

Pt CA 1 Sec 8A

1

0.25

1.25

$4,528

247588

63 Clarke Street, Portarlington

Pt CA 8 Sec 36A

1

1

2

$7,245

247625

64 Clarke Street, Portarlington

Lot 1 TP 235047, Lot 1 TP 836665

1

1

2

$7,245

247589

65 Clarke Street, Portarlington

Lot 2 LP 148542

1

1

2

$7,245

247626

66 Clarke Street, Portarlington

Pt CA 4 Sec 8A

1

1

2

$7,245

266626

67 Clarke Street, Portarlington

Lot 2 LP 207173

1

1

2

$7,245

247627

68 Clarke Street, Portarlington

Lot 1 TP 320576

1

1

2

$7,245

247590

69 Clarke Street, Portarlington

Lot 2 LP 39101

1

1

2

$7,245

247628

70 Clarke Street, Portarlington

Lot 1 LP 71585

1

1

2

$7,245

247591

71 Clarke Street, Portarlington

Lot 1 LP 115344

1

1

2

$7,245

247629

72 Clarke Street, Portarlington

Lot 2 LP 71585

1

1

2

$7,245

318418

73 Clarke Street, Portarlington

Lot 2 PS 507449

1

1

2

$7,245

323812

1/74 Clarke Street, Portarlington

Lot 1 PS 514360

0.75

1

1.75

$6,340

323813

2/74 Clarke Street, Portarlington

Lot 2 PS 514360

0.5

1

1.5

$5,434

247592

75 Clarke Street, Portarlington

Pt CA 2 Sec 36A

1

1

2

$7,245

247631

76 Clarke Street, Portarlington

Lot 1 LP 93922

1

1

2

$7,245

333154

78 Clarke Street, Portarlington

Lot 1 PS 537758

0.5

0.5

1

$3,623

269925

22 Drysdale Street, PORTARLINGTON

Lot 3 PS 302058

0.25

0

0.25

$906

249717

39 Drysdale Street, PORTARLINGTON

Lot 1 TP 8593

1

1

2

$7,245

249718

41 Drysdale Street, PORTARLINGTON

Pt CA 4 Sec 6A

1

1

2

$7,245

203223

42-44 Drysdale Street, PORTARLINGTON

CA 1 Sec 11A

0.5

0.5

1

$3,623

249719

1/43 Drysdale Street, PORTARLINGTON

Lot 1 PS 545802

0.75

1

1.75

$6,340

332103

2/43 Drysdale Street, PORTARLINGTON

Lot 2 PS 545802

0.5

1

1.5

$5,434

249720

45 Drysdale Street, PORTARLINGTON

Pt CA 6 Sec 6A

1

1

2

$7,245

352712

47 Drysdale Street, PORTARLINGTON

Lot 2 LP 88568

1

1

2

$7,245

355227

49 Drysdale Street, PORTARLINGTON

Lot 1 TP 323277

1

1

2

$7,245

249750

50 Drysdale Street, PORTARLINGTON

Lot 1 LP 146674, Pt CA 6 Sec 11A

1

1

2

$7,245

249751

52-54 Drysdale Street, PORTARLINGTON

Lot 2 LP 24708, Lot 1 LP 24708

1

1

2

$7,245

329600

55 Drysdale Street, PORTARLINGTON

Lot 2 PS 530751

0.75

1

1.75

$6,340

249752

56 Drysdale Street, PORTARLINGTON

Lot 3 LP 24708

1

1

2

$7,245

249721

1/57-59 Drysdale Street, PORTARLINGTON

Lot 1 PS 515822

0.75

1

1.75

$6,340

324529

2/57-59 Drysdale Street, PORTARLINGTON

Lot 2 PS 515822

0.5

1

1.5

$5,434

324530

3/57-59 Drysdale Street, PORTARLINGTON

Lot 3 PS 515822

0.5

1

1.5

$5,434

324531

4/57-59 Drysdale Street, PORTARLINGTON

Lot 4 PS 515822

0.5

1

1.5

$5,434

324532

5/57-59 Drysdale Street, PORTARLINGTON

Lot 5 PS 515822

0.75

1

1.75

$6,340

249753

58 Drysdale Street, PORTARLINGTON

Lot 4 LP 24708

1

1

2

$7,245

353402

61A Drysdale Street, PORTARLINGTON

Lot 2 PS 709262

0.75

1

1.75

$6,340

353401

61B Drysdale Street, PORTARLINGTON

Lot 1 PS 709262

0.5

1

1.5

$5,434

348553

62 Drysdale Street, PORTARLINGTON

Lot 2 PS 700752

0.75

1

1.75

$6,340

344498

1/63 Drysdale Street, PORTARLINGTON

Lot 2 PS 628320

0.75

1

1.75

$6,340

344499

2/63 Drysdale Street, PORTARLINGTON

Lot 1 PS 628320

0.5

1

1.5

$5,434

351481

Unit 1/64 Drysdale Street, PORTARLINGTON

Lot 1 PS 722487

0.75

1

1.75

$6,340

351482

Unit 2/64 Drysdale Street, PORTARLINGTON

Lot 2 PS 722487

0.5

1

1.5

$5,434

351483

Unit 3/64 Drysdale Street, PORTARLINGTON

Lot 3 PS 722487

0.5

1

1.5

$5,434

265574

65 Drysdale Street, PORTARLINGTON

Lot 1 TP 124894

1

1

2

$7,245

264709

66 Drysdale Street, PORTARLINGTON

Lot 8 LP 141378

1

1

2

$7,245

249754

68 Drysdale Street, PORTARLINGTON

Lot 1 TP 607999

1

1

2

$7,245

249755

70 Drysdale Street, PORTARLINGTON

Lot 1 PS 440557

1

1

2

$7,245

249756

72 Drysdale Street, PORTARLINGTON

Lot 3 LP 98580

1

1

2

$7,245

249757

74 Drysdale Street, PORTARLINGTON

Lot 4 LP 98580

1

1

2

$7,245

249722

1/75-77 Drysdale Street, PORTARLINGTON

Lot 1 RP 7194

0.5

0.5

1

$3,623

249723

2/75-77 Drysdale Street, PORTARLINGTON

Lot 2 RP 7194

0.5

0.5

1

$3,623

249724

3/75-77 Drysdale Street, PORTARLINGTON

Lot 3 RP 7194

0.5

0.5

1

$3,623

249725

4/75-77 Drysdale Street, PORTARLINGTON

Lot 4 RP 7194

0.5

0.5

1

$3,623

249758

76 Drysdale Street, PORTARLINGTON

Lot 5 LP 98580

1

1

2

$7,245

249726

79 Drysdale Street, PORTARLINGTON

Lot 1 TP 222307

1

1

2

$7,245

249727

81 Drysdale Street, PORTARLINGTON

Lot 1 TP 346243

1

1

2

$7,245

340833

82-86 Drysdale Street, PORTARLINGTON

Lot 1 PS 621516

0.5

0.5

1

$3,623

249728

83 Drysdale Street, PORTARLINGTON

Pt CA 5 Sec 8A

1

1

2

$7,245

249729

85 Drysdale Street, PORTARLINGTON

Lot 6 LP 71585

1

1

2

$7,245

249730

87 Drysdale Street, PORTARLINGTON

Lot 5 LP 71585

1

1

2

$7,245

267214

88-100 Drysdale Street, PORTARLINGTON

PC 353636

5.5

5.5

11

$39,848

249731

89 Drysdale Street, PORTARLINGTON

Lot 4 LP 71585

1

1

2

$7,245

337780

14 Fairfax Street, PORTARLINGTON

Lot 2 PS 608405

0.75

1

1.75

$6,340

251072

15 Fairfax Street, PORTARLINGTON

Pt CA 1 Sec 7A, Pt CA 2 Sec 7A

1

1

2

$7,245

346282

16 Fairfax Street, PORTARLINGTON

Lot 1 TP 202460

1

1

2

$7,245

355036

17A Fairfax Street, PORTARLINGTON

Lot 2 PS 702058

0.5

1

1.5

$5,434

355035

17B Fairfax Street, PORTARLINGTON

Lot 1 PS 702058

0.75

1

2

$7,245

251085

18 Fairfax Street, PORTARLINGTON

CP 154298

1

1

2

$7,245

329599

19 Fairfax Street, PORTARLINGTON

Lot 1 PS 530751

0.75

1

1.75

$6,340

251087

20 Fairfax Street, PORTARLINGTON

Pt 1 LP 51751

1

1

2

$7,245

348552

21 Fairfax Street, PORTARLINGTON

Lot 1 PS 700752

1

1

2

$7,245

251088

22 Fairfax Street, PORTARLINGTON

Lot 1 LP 70225

1

1

2

$7,245

264703

23 Fairfax Street, PORTARLINGTON

Lot 2 LP 141378

1

1

2

$7,245

251089

24 Fairfax Street, PORTARLINGTON

Lot 2 LP 70225

1

1

2

$7,245

264704

25 Fairfax Street, PORTARLINGTON

Lot 3 LP 141378

1

1

2

$7,245

251090

26 Fairfax Street, PORTARLINGTON

Lot 7 LP 24708

1

1

2

$7,245

264705

27 Fairfax Street, PORTARLINGTON

Lot 4 LP 141378

1

1

2

$7,245

256620

1/28 Fairfax Street, PORTARLINGTON

Lot 2 LP 217109

0.5

0.5

1

$3,623

256619

2/28 Fairfax Street, PORTARLINGTON

Lot 2 LP 217109

0.5

0.5

1

$3,623

264706

29 Fairfax Street, PORTARLINGTON

Lot 5 LP 141378

1

1

2

$7,245

264707

31 Fairfax Street, PORTARLINGTON

Lot 6 LP 141378

0.5

1

1.5

$5,434

251091

32 Fairfax Street, PORTARLINGTON

Lot 3 LP 93775

1

1

2

$7,245

251092

34 Fairfax Street, PORTARLINGTON

Lot 4 LP 93775

1

1

2

$7,245

342411

35 Fairfax Street, PORTARLINGTON

Lot 2 PS 631332

0.75

1

1.75

$6,340

251093

36 Fairfax Street, PORTARLINGTON

Lot 5 LP 93775

1

1

2

$7,245

342412

37 Fairfax Street, PORTARLINGTON

Lot 3 PS 631332

0.75

1

1.75

$6,340

315142

39 Fairfax Street, PORTARLINGTON

Lot 4 PS 449690

0.75

1

1.75

$6,340

315141

41 Fairfax Street, PORTARLINGTON

Lot 3 PS 449690

0.75

1

1.75

$6,340

331127

45 Fairfax Street, PORTARLINGTON

Lot 1 PS 543306

0.75

1

1.75

$6,340

264401

47 Fairfax Street, PORTARLINGTON

Lot 2 LP 205825

1

1

2

$7,245

264402

49 Fairfax Street, PORTARLINGTON

Lot 3 LP 205825

1

1

2

$7,245

267281

51 Fairfax Street, PORTARLINGTON

Lot 1 LP 212800

1

1

2

$7,245

267282

53 Fairfax Street, PORTARLINGTON

Lot 2 LP 212800

1

1

2

$7,245

267283

55 Fairfax Street, PORTARLINGTON

Lot 3 LP 212800

1

1

2

$7,245

346848

60 Fairfax Street, PORTARLINGTON

Lot 2 PS 645789

0.75

1

1.75

$6,340

346849

62 Fairfax Street, PORTARLINGTON

Lot 3 PS 645789

0.75

1

1.75

$6,340

251076

69 Fairfax Street, PORTARLINGTON

Lot 1 LP 116459

1

1

2

$7,245

355052

70 Fairfax Street, PORTARLINGTON

Lot 1 PS 639951

1

1

2

$7,245

251077

71 Fairfax Street, PORTARLINGTON

Lot 2 LP 116459

1

1

2

$7,245

355053

72 Fairfax Street, PORTARLINGTON

Lot 2 PS 639951

1

1

2

$7,245

251078

73 Fairfax Street, PORTARLINGTON

Lot 3 LP 116459

1

1

2

$7,245

355054

74 Fairfax Street, PORTARLINGTON

Lot 3 PS 639951

1

1

2

$7,245

251079

75 Fairfax Street, PORTARLINGTON

Lot 4 LP 116459

1

1

2

$7,245

355055

76 Fairfax Street, PORTARLINGTON

Lot 4 PS 639951

1

1

2

$7,245

251080

77 Fairfax Street, PORTARLINGTON

Lot 5 LP 116459

1

1

2

$7,245

251081

79 Fairfax Street, PORTARLINGTON

Lot 6 LP 116459

1

1

2

$7,245

251082

85 Fairfax Street, PORTARLINGTON

Lot 13 LP 54545

1

1

2

$7,245

251285

110 Fenwick Street, PORTARLINGTON

Lot 1 PS 536904

0.5

0.5

1

$3,623

251212

111 Fenwick Street, PORTARLINGTON

Lot 6 LP 34989

0.5

1

1.5

$5,434

251286

114 Fenwick Street, PORTARLINGTON

CA 3 Sec 4

1

1

2

$7,245

251213

115 Fenwick Street, PORTARLINGTON

Lot 17 LP 55642

1

1

2

$7,245

251287

116 Fenwick Street, PORTARLINGTON

Lot 1 TP 582671

1

1

2

$7,245

251214

117 Fenwick Street, PORTARLINGTON

Lot 16 LP 55642

1

1

2

$7,245

269134

1/118 Fenwick Street, PORTARLINGTON

Lot 1 PS 341422

0.75

1

1.75

$6,340

269135

2/118 Fenwick Street, PORTARLINGTON

Lot 2 PS 341422

0.5

1

1.5

$5,434

251215

119-121 Fenwick Street, PORTARLINGTON

Lot 14 LP 55642, Lot 15 LP 55642

2

2

4

$14,490

251217

123 Fenwick Street, PORTARLINGTON

Lot 13 LP 55642

1

1

2

$7,245

251218

125 Fenwick Street, PORTARLINGTON

Lot 12 LP 55642

1

1

2

$7,245

251219

127 Fenwick Street, PORTARLINGTON

Lot 11 LP 55642

1

1

2

$7,245

251220

129 Fenwick Street, PORTARLINGTON

Lot 10 LP 55642, Pt CA 8 Sec 16A

1

1

2

$7,245

315139

133-135 Fenwick Street, PORTARLINGTON

Lot 1 PS 449690, Lot 2 PS 449690

1

1

2

$7,245

359174

Unit 1/137 Fenwick Street, PORTARLINGTON

1/3 Share of Lot 19 LP 24149

0.75

1

1.75

$6,340

359175

Unit 2/137 Fenwick Street, PORTARLINGTON

1/3 Share of Lot 19 LP 24149

0.5

1

1.5

$5,434

359176

Unit 3/137 Fenwick Street, PORTARLINGTON

1/3 Share of Lot 19 LP 24149

0.5

1

1.5

$5,434

331128

138 Fenwick Street, PORTARLINGTON

Lot 2 PS 543306

0.75

1

1.75

$6,340

251223

139 Fenwick Street, PORTARLINGTON

Lot 18 LP 24149

1

1

2

$7,245

337885

140 Fenwick Street, PORTARLINGTON

Lot 1 PS 606907

0.75

1

1.75

$6,340

337886

1/140 Fenwick Street, PORTARLINGTON

Lot 2 PS 606907

0.75

1

1.75

$6,340

251224

141 Fenwick Street, PORTARLINGTON

Lot 17 LP 24149

1

1

2

$7,245

336189

142 Fenwick Street, PORTARLINGTON

Lot 1 PS 533312

1

1

2

$7,245

251225

143 Fenwick Street, PORTARLINGTON

Lot 16 LP 24149

1

1

2

$7,245

340332

144 Fenwick Street, PORTARLINGTON

Lot 1 PS 623396

1

1

2

$7,245

251226

145 Fenwick Street, PORTARLINGTON

Lot 15 LP 24149

1

1

2

$7,245

315008

146 Fenwick Street, PORTARLINGTON

Lot 1 PS 449151

1

1

2

$7,245

251227

147 Fenwick Street, PORTARLINGTON

Lot 14 LP 24149

1

1

2

$7,245

335025

148 Fenwick Street, PORTARLINGTON

Lot 1 PS 549973

1

1

2

$7,245

251228

149 Fenwick Street, PORTARLINGTON

Lot 13 LP 24149

1

1

2

$7,245

269685

150 Fenwick Street, PORTARLINGTON

Pt CA 8 Sec 5

1

1

2

$7,245

329404

1/151 Fenwick Street, PORTARLINGTON

Lot 1 PS 530758

0.75

1

1.75

$6,340

329405

2/151 Fenwick Street, PORTARLINGTON

Lot 2 PS 530758

0.5

1

1.5

$5,434

265588

152 Fenwick Street, PORTARLINGTON

Lot 1 PS 511405

1

1

2

$7,245

328821

153 Fenwick Street, PORTARLINGTON

Lot 1 PS 525176

1

1

2

$7,245

318787

154 Fenwick Street, PORTARLINGTON

Lot 2 PS 511405

1

1

2

$7,245

251231

155 Fenwick Street, PORTARLINGTON

Lot 23 LP 55154

1

1

2

$7,245

251232

157 Fenwick Street, PORTARLINGTON

Lot 22 LP 55154

1

1

2

$7,245

339538

1/158 Fenwick Street, PORTARLINGTON

Lot 1 PS 622060

0.75

1

1.75

$6,340

339539

2/158 Fenwick Street, PORTARLINGTON

Lot 2 PS 622060

0.5

1

1.5

$5,434

266772

159 Fenwick Street, PORTARLINGTON

Lot 21 LP 55154

1

1

2

$7,245

251298

160 Fenwick Street, PORTARLINGTON

Lot 1 LP 203887

1

1

2

$7,245

251233

161 Fenwick Street, PORTARLINGTON

Lot 20 LP 55154

1

1

2

$7,245

251299

162 Fenwick Street, PORTARLINGTON

Lot 1 TP 405411

1

1

2

$7,245

251234

163 Fenwick Street, PORTARLINGTON

Lot 19 LP 55154

1

1

2

$7,245

335845

1/164 Fenwick Street, PORTARLINGTON

Lot 1 PS 549675

0.75

1

1.75

$6,340

335846

2/164 Fenwick Street, PORTARLINGTON

Lot 2 PS 549675

0.5

1

1.5

$5,434

335847

3/164 Fenwick Street, PORTARLINGTON

Lot 3 PS 549675

0.5

1

1.5

$5,434

346577

Unit 1/165 Fenwick Street, PORTARLINGTON

Lot 1 PS 643465

0.75

1

1.75

$6,340

346578

Unit 2/165 Fenwick Street, PORTARLINGTON

Lot 2 PS 643465

0.5

1

1.5

$5,434

268710

166 Fenwick Street, PORTARLINGTON

Lot 1 LP 215550

1

1

2

$7,245

251236

167 Fenwick Street, PORTARLINGTON

Lot 17 LP 55154

1

1

2

$7,245

341926

1/168 Fenwick Street, PORTARLINGTON

Lot 1 PS 624482

0.75

1

1.75

$6,340

341927

2/168 Fenwick Street, PORTARLINGTON

Lot 2 PS 624482

0.5

1

1.5

$5,434

251237

169 Fenwick Street, PORTARLINGTON

Lot 16 LP 55154

1

1

2

$7,245

251403

49-53 Fisher Street, PORTARLINGTON

Lot 1 TP 532588, Lot 2 TP 532588

1.5

1.5

3

$10,868

251805

3 Gellibrand Street, Portarlington

Lot 3 LP 62821

0.25

0.25

0.5

$1,811

251806

5 Gellibrand Street, Portarlington

Pt CA 2 Sec 5A

0.25

0.25

0.5

$1,811

251807

7 Gellibrand Street, Portarlington

Pt CA 2 Sec 5A

0.25

0.25

0.5

$1,811

251808

9 Gellibrand Street, Portarlington

Pt CA 2 Sec 5A

0.125

0.125

0.25

$906

269926

15 Gellibrand Street, Portarlington

Lot 2 PS 302058

0.25

0.25

0.5

$1,811

269927

17 Gellibrand Street, Portarlington

Lot 1 PS 302058

0.25

0.25

0.5

$1,811

251809

19 Gellibrand Street, Portarlington

Lot 1 TP 9830

0.25

0.25

0.5

$1,811

251815

35 Gellibrand Street, Portarlington

Pt CA 2 Sec 3

0.5

0.5

1

$3,623

267846

37 Gellibrand Street, Portarlington

Lot 1 LP 212027

1

1

2

$7,245

269405

1/39 Gellibrand Street, Portarlington

Lot 1 SP 34254

0.5

1

1.5

$5,434

269406

2/39 Gellibrand Street, Portarlington

Lot 2 SP 34254

0.5

1

1.5

$5,434

251817

41 Gellibrand Street, Portarlington

Lot 23 LP 98789

1

1

2

$7,245

251826

42 Gellibrand Street, Portarlington

CP 170580

1

1

2

$7,245

323761

49 Gellibrand Street, Portarlington

Lot 1 PS 513187

1

1

2

$7,245

266684

21 Hood Road, Portarlington

Lot 1 LP 208529

0.5

1

1.5

$5,434

345540

39 Hood Road, Portarlington

Lot 1 PS 636046

0.5

0

0.5

$1,811

253460

47 Hood Road, Portarlington

CA 4 Sec 28

1

1

2

$7,245

253461

49 Hood Road, Portarlington

CA 5 Sec 28

1

1

2

$7,245

253462

51 Hood Road, Portarlington

CA 6 Sec 28

1

1

2

$7,245

253464

55 Hood Road, Portarlington

CA 8 Sec 28

1

1

2

$7,245

253465

57-59 Hood Road, Portarlington

CA 9 Sec 28

0.5

0.5

1

$3,623

253466

61 Hood Road, Portarlington

Lot 1 LP 54545

0.5

0.5

1

$3,623

325993

85 Hood Road, Portarlington

Lot 25 PS 523855

0.25

0

0.25

$906

253473

111-129 Hood Road, Portarlington

CA 113

0.5

0.5

1

$3,623

302171

4 Mercer Street, Portarlington

Lot 2 PS 410103

0.25

0.5

0.75

$2,717

255744

16 Mercer Street, Portarlington

Lot 6 LP 93922

0.5

0.5

1

$3,623

255748

30 Mercer Street, Portarlington

Lot 10 LP 55154

0.25

0.5

0.75

$2,717

255749

32 Mercer Street, Portarlington

Lot 11 LP 55154

1

1

2

$7,245

255736

33-41 Mercer Street, Portarlington

CA 139

1

1

2

$7,245

255750

34 Mercer Street, Portarlington

Lot 12 LP 55154

1

1

2

$7,245

255751

36 Mercer Street, Portarlington

Lot 13 LP 55154

1

1

2

$7,245

255752

38 Mercer Street, Portarlington

Lot 14 LP 55154

1

1

2

$7,245

255753

40 Mercer Street, Portarlington

Lot 15 LP 55154

1

1

2

$7,245

255754

42 Mercer Street, Portarlington

Lot 1 TP 857286

1

1

2

$7,245

255737

43-51 Mercer Street, Portarlington

CA 138

1

1

2

$7,245

255755

44 Mercer Street, Portarlington

Lot 5 GLSBW 23

1

1

2

$7,245

255756

46 Mercer Street, Portarlington

Lot 4 GLSBW 23

1

1

2

$7,245

255757

48 Mercer Street, Portarlington

Lot 3 LP 24848

1

1

2

$7,245

255758

50 Mercer Street, Portarlington

Lot 2 LP 24848

1

1

2

$7,245

255759

52 Mercer Street, Portarlington

Lot 1 LP 24848

1

1

2

$7,245

255738

53-61 Mercer Street, Portarlington

Lot 1 TP 319259

1

1

2

$7,245

255760

60 Mercer Street, Portarlington

Lot 8 LP 98790

1

1

2

$7,245

255761

62 Mercer Street, Portarlington

Lot 9 LP 98790

1

1

2

$7,245

255739

63-71 Mercer Street, Portarlington

CA 115

1

1

2

$7,245

255762

64 Mercer Street, Portarlington

Lot 10 LP 98790

1

1

2

$7,245

255763

66 Mercer Street, Portarlington

Lot 10 LP 57519

1

1

2

$7,245

255765

68-70 Mercer Street, Portarlington

Lot 11 & 12 LP 57519

2

2

4

$14,490

255766

72 Mercer Street, Portarlington

Lot 13 LP 57519

1

1

2

$7,245

255740

73-81 Mercer Street, Portarlington

CA114

1

1

2

$7,245

255767

74 Mercer Street, Portarlington

Lot 14 LP 57519

1

1

2

$7,245

255768

76 Mercer Street, Portarlington

Lot 15 LP 57519

1

1

2

$7,245

325980

80 Mercer Street, Portarlington

Lot 12 PS 523855

0.75

1

1.75

$6,340

325981

82 Mercer Street, Portarlington

Lot 13 PS 523855

0.75

1

1.75

$6,340

325982

84 Mercer Street, Portarlington

Lot 14 PS 523855

0.75

1

1.75

$6,340

325983

86 Mercer Street, Portarlington

Lot 15 PS 523855

0.75

1

1.75

$6,340

325984

88 Mercer Street, Portarlington

Lot 16 PS 523855

0.5

1

1.5

$5,434

256601

137 Newcombe Street, Portarlington

Pt CA 2 Sec 10A

0.125

0.125

0.25

$906

256691

156 Newcombe Street, Portarlington

Lot 3 LP 34989

0.5

0.5

1

$3,623

256692

158 Newcombe Street, Portarlington

Lot 1 LP 55642

0.5

0.5

1

$3,623

256611

161 Newcombe Street, Portarlington

CA 3 Sec 11A

1

1

2

$7,245

256612

163 Newcombe Street, Portarlington

CA 4 Sec 11A

1

1

2

$7,245

256617

1/175-177 Newcombe Street, Portarlington

Lot 1 LP 217109

0

0

0

$0

256618

2/175-177 Newcombe Street, Portarlington

Lot 1 LP 217109

0.25

0.25

0.5

$1,811

256702

178 Newcombe Street, Portarlington

Lot 2 LP 93775

0.5

0.5

1

$3,623

342410

182 Newcombe Street, Portarlington

Lot 1 PS 631332

0.5

0.5

1

$3,623

256712

200 Newcombe Street, Portarlington

Lot 1 LP 42948

0.5

0.5

1

$3,623

327001

202 Newcombe Street, Portarlington

Lot 1 PS 522331

0.5

0.5

1

$3,623

323760

1-3 Payne Street, Portarlington

Lot 2 PS 513187

1

1

2

$7,245

257838

2-4 Payne Street, Portarlington

CA 1 Sec 27

2

2

4

$14,490

257839

6 Payne Street, Portarlington

Lot 12 LP 20796

1

1

2

$7,245

257840

8 Payne Street, Portarlington

Lot 11 LP 20796

1

1

2

$7,245

267194

9 Payne Street, Portarlington

Lot 2 LP 210751

1

1

2

$7,245

257841

10 Payne Street, Portarlington

Lot 10 LP 20796

1

1

2

$7,245

266977

11 Payne Street, Portarlington

Lot 2 LP 213980

1

1

2

$7,245

257842

12 Payne Street, Portarlington

Lot 9 LP 20796

1

1

2

$7,245

327043

13 Payne Street, Portarlington

Lot 2 PS 526798

1

1

2

$7,245

257843

14 Payne Street, Portarlington

Lot 8 LP 20795

1

1

2

$7,245

271082

15 Payne Street, Portarlington

Lot 2 PS 316308

1

1

2

$7,245

257844

16 Payne Street, Portarlington

Lot 7 LP 20795

1

1

2

$7,245

257822

17-19 Payne Street, Portarlington

CA 9 Sec 19

2

2

4

$14,490

257845

18 Payne Street, Portarlington

Lot 6 LP 20795

1

1

2

$7,245

265272

20 Payne Street, Portarlington

Lot 5 LP 20795

1

1

2

$7,245

335491

21-23 Payne Street, Portarlington

Lot 2 PS 606271

1

1

2

$7,245

265603

22-24 Payne Street, Portarlington

CA 1 Sec 28, CA 2 Sec 28, CA 3 Sec 28

3.25

3.25

6.5

$23,547

351984

25 Payne Street, Portarlington

Lot 2 PS712539

1

1

2

$7,245

335762

33 Payne Street, Portarlington

Lot 2 PS 605388

1

1

2

$7,245

346393

34 Payne Street, Portarlington

Lot 2 PS 647941

1

1

2

$7,245

355471

35A Payne Street, Portarlington

Lot 1 PS 719293

0.75

1

1.75

$6,340

355472

35B Payne Street, Portarlington

Lot 2 PS 719293

0.75

1

1.75

$6,340

257824

37-39 Payne Street, Portarlington

CA 9 Sec 20

2

2

4

$14,490

339074

42 Payne Street, Portarlington

Lot 12 LP 54545

1

1

2

$7,245

257847

44 Payne Street, Portarlington

Lot 11 LP 54545

1

1

2

$7,245

257825

45 Payne Street, Portarlington

Lot 7 LP 116459

1

1

2

$7,245

257848

46 Payne Street, Portarlington

Lot 10 LP 54545

1

1

2

$7,245

257826

47 Payne Street, Portarlington

Lot 8 LP 116459

1

1

2

$7,245

257849

48 Payne Street, Portarlington

Lot 9 LP 54545

1

1

2

$7,245

320644

1/49 Payne Street, Portarlington

Lot 1 PS 515298

0.75

1

1.75

$6,340

320645

2/49 Payne Street, Portarlington

Lot 2 PS 515298

0.75

1

1.75

$6,340

335047

1/50 Payne Street, Portarlington

Lot 1 PS 600386

0.75

1

1.75

$6,340

335048

2/50 Payne Street, Portarlington

Lot 2 PS 600386

0.5

1

1.5

$5,434

257828

51 Payne Street, Portarlington

Lot 10 LP 116459

1

1

2

$7,245

257851

52 Payne Street, Portarlington

Lot 7 LP 54545

1

1

2

$7,245

257829

53 Payne Street, Portarlington

Lot 11 LP 116459

1

1

2

$7,245

257852

54-62 Payne Street, Portarlington

Pt CA 29

5.5

5.5

11

$39,848

257830

55 Payne Street, Portarlington

Lot 12 LP 116459

1

1

2

$7,245

325969

64 Payne Street, Portarlington

Lot 1 PS 523855

0.75

1

1.75

$6,340

257831

65 Payne Street, Portarlington

Lot 23 LP 57519

1

1

2

$7,245

325970

66 Payne Street, Portarlington

Lot 2 PS 523855

0.75

1

1.75

$6,340

257832

67 Payne Street, Portarlington

Lot 22 LP 57519

1

1

2

$7,245

325971

68 Payne Street, Portarlington

Lot 3 PS 523855

1

1

2

$7,245

257833

69 Payne Street, Portarlington

Lot 21 LP 57519

1

1

2

$7,245

325972

70 Payne Street, Portarlington

Lot 4 PS 523855

1

1

2

$7,245

350884

71A Payne Street, Portarlington

Lot 20 LP 57519

0.75

1

1.75

$6,340

350885

71B Payne Street, Portarlington

Lot 1 PS 705827

0.5

1

1.5

$5,434

325973

72 Payne Street, Portarlington

Lot 2 PS 705827

1

1

2

$7,245

257835

73-75 Payne Street, Portarlington

Lot 18 & 19 LP 57519

2

2

4

$14,490

325974

74 Payne Street, Portarlington

Lot 6 PS 523855

1

1

2

$7,245

325975

76 Payne Street, Portarlington

Lot 7 PS 523855

1

1

2

$7,245

257836

77 Payne Street, Portarlington

Lot 17 LP 57519

1

1

2

$7,245

325976

78 Payne Street, Portarlington

Lot 8 PS 523855

1

1

2

$7,245

257837

79 Payne Street, Portarlington

Lot 16 LP 57519

1

1

2

$7,245

325977

80 Payne Street, Portarlington

Lot 9 PS 523855

1

1

2

$7,245

333908

1/82 Payne Street, Portarlington

Lot 1 PS 536901

0.75

1

1.75

$6,340

333909

2/82 Payne Street, Portarlington

Lot 2 PS 536901

0.5

1

1.5

$5,434

325979

84 Payne Street, Portarlington

Lot 11 PS 523855

0.75

1

1.75

$6,340

265575

14 Simson Street, Portarlington

CA 9 Sec 7A, Lot 1 TP 17830

1.5

1.5

3

$10,868

260008

18 Simson Street, Portarlington

Lot 6 LP 98580

0.5

1

1.5

$5,434

260013

34 Simson Street, Portarlington

Lot 3 LP 42948

1

1

2

$7,245

328823

36 Simson Street, Portarlington

Lot 3 PS 525176

0.75

1

1.75

$6,340

327002

37 Simson Street, Portarlington

Lot 2 PS 522331

1

1

2

$7,245

328822

38 Simson Street, Portarlington

Lot 2 PS 525176

0.75

1

1.75

$6,340

259988

39 Simson Street, Portarlington

Lot 27 LP 55154

1

1

2

$7,245

330981

1/40A Simson Street, Portarlington

Lot 4 PS 541672

0.75

1

1.75

$6,340

330982

2/40A Simson Street, Portarlington

Lot 5 PS 541672

0.5

1

1.5

$5,434

330983

3/40A Simson Street, Portarlington

Lot 6 PS 541672

0.5

1

1.5

$5,434

259989

41 Simson Street, Portarlington

Lot 26 LP 55154

1

1

2

$7,245

260014

42 Simson Street, Portarlington

Lot 18 LP 116459

1

1

2

$7,245

318907

43 Simson Street, Portarlington

Lot 25 LP 55154

1

1

2

$7,245

260015

44 Simson Street, Portarlington

Lot 17 LP 116459

1

1

2

$7,245

259991

45 Simson Street, Portarlington

Lot 24 LP 55154

1

1

2

$7,245

260016

46 Simson Street, Portarlington

Lot 16 LP 116459

1

1

2

$7,245

259992

47 Simson Street, Portarlington

Lot 1 LP 20931

1

1

2

$7,245

265608

48 Simson Street, Portarlington

Lot 15 LP 116459

1

1

2

$7,245

259993

49 Simson Street, Portarlington

Lot 2 LP 20931

1

1

2

$7,245

265609

50 Simson Street, Portarlington

Lot 14 LP 116459

1

1

2

$7,245

259994

51 Simson Street, Portarlington

Lot 3 LP 20931

1

1

2

$7,245

260017

52 Simson Street, Portarlington

Lot 13 LP 116459

1

1

2

$7,245

259995

53 Simson Street, Portarlington

Lot 4 LP 20931

1

1

2

$7,245

265611

55 Simson Street, Portarlington

Lot 5 LP 20931

1

1

2

$7,245

259996

57 Simson Street, Portarlington

Lot 6 LP 20931

1

1

2

$7,245

259997

59 Simson Street, Portarlington

Lot 7 LP 20931

1

1

2

$7,245

259998

61 Simson Street, Portarlington

Lot 8 LP 20931

1

1

2

$7,245

259999

63 Simson Street, Portarlington

Lot 9 LP 20931

1

1

2

$7,245

260000

65 Simson Street, Portarlington

Lot 10 LP 20931

1

1

2

$7,245

260001

67 Simson Street, Portarlington

Lot 1 LP 57519

1

1

2

$7,245

260002

69 Simson Street, Portarlington

Lot 28 LP 57519

1

1

2

$7,245

260003

71 Simson Street, Portarlington

Lot 27 LP 57519

1

1

2

$7,245

260004

73 Simson Street, Portarlington

Lot 26 LP 57519

1

1

2

$7,245

260005

75 Simson Street, Portarlington

Lot 25 LP 57519

1

1

2

$7,245

260006

77 Simson Street, Portarlington

Lot 24 LP 57519

1

1

2

$7,245

325996

81 Simson Street, Portarlington

Lot 28 PS 523855

1

1

2

$7,245

325995

83 Simson Street, Portarlington

Lot 27 PS 523855

1

1

2

$7,245

325994

85 Simson Street, Portarlington

Lot 26 PS 523855

0.75

1

1.75

$6,340

265034

1/92 Stevens Street, Portarlington

Lot 1 SP 25591

0.5

0.5

1

$3,623

265035

2/92 Stevens Street, Portarlington

Lot 2 SP 25591

0.75

1

1.75

$6,340

260552

95 Stevens Street, Portarlington

Lot 1 TP 892757

1

1

2

$7,245

260553

97 Stevens Street, Portarlington

Pt CA 4 Sec 3

1

1

2

$7,245

260554

99 Stevens Street, Portarlington

Lot 1 TP 14261, Pt Sec 3 CA 5

1

1

2

$7,245

301824

100 Stevens Street, Portarlington

Lot 1 PS 408008

1

1

2

$7,245

260555

101 Stevens Street, Portarlington

Lot 4 LP 78014

1

1

2

$7,245

301825

102 Stevens Street, Portarlington

Lot 2 PS 408008

1

1

2

$7,245

260556

103 Stevens Street, Portarlington

Lot 5 LP 78014

1

1

2

$7,245

260608

104 Stevens Street, Portarlington

Lot 2 LP 98789

1

1

2

$7,245

260557

105 Stevens Street, Portarlington

Lot 6 LP 78014

1

1

2

$7,245

260609

106 Stevens Street, Portarlington

Lot 3 LP 98789

1

1

2

$7,245

260558

107 Stevens Street, Portarlington

Lot 7 LP 78014

1

1

2

$7,245

355537

1/108 Stevens Street, Portarlington

Part Lot 1 TP 630015 Ppsd Lot 1 PS 709909

0.75

1

1.75

$6,340

355538

2/108 Stevens Street, Portarlington

Part Lot 1 TP 630015 Ppsd Lot 2 PS 709909

0.5

1

1.5

$5,434

355539

3/108 Stevens Street, Portarlington

Part Lot 1 TP 630015 Ppsd Lot 3 PS 709909

0.5

1

1.5

$5,434

260559

109 Stevens Street, Portarlington

Pt CA 9 Sec 3

1

1

2

$7,245

260611

110 Stevens Street, Portarlington

Lot 5 LP 98789

1

1

2

$7,245

260560

111 Stevens Street, Portarlington

Pt CA 9 Sec 3

1

1

2

$7,245

260612

112 Stevens Street, Portarlington

Lot 6 LP 98789

1

1

2

$7,245

260561

113 Stevens Street, Portarlington

Lot 1 TP 261290 Pt CA 13 Sec 4

1

1

2

$7,245

260613

114 Stevens Street, Portarlington

Lot 7 LP 98789

1

1

2

$7,245

260562

115 Stevens Street, Portarlington

Pt CA 14 Sec 4

1

1

2

$7,245

260614

116 Stevens Street, Portarlington

Lot 1 TP 575113

1

1

2

$7,245

260563

117 Stevens Street, Portarlington

Pt CA 15 Sec 4

1

1

2

$7,245

337887

141 Stevens Street, Portarlington

Lot 3 PS 606907

0.75

1

1.75

$6,340

337888

1/141 Stevens Street, Portarlington

Lot 4 PS 606907

0.75

1

1.75

$6,340

336190

143 Stevens Street, Portarlington

Lot 2 PS 533312

1

1

2

$7,245

340333

145 Stevens Street, Portarlington

Lot 2 PS 623396

1

1

2

$7,245

326509

1/147 Stevens Street, Portarlington

Lot 1 PS 513432

0.75

1

1.75

$6,340

326510

2/147 Stevens Street, Portarlington

Lot 2 PS 513432

0.5

1

1.5

$5,434

326511

3/147 Stevens Street, Portarlington

Lot 3 PS 513432

0.5

1

1.5

$5,434

342034

1/149 Stevens Street, Portarlington

Lot 1 PS 630980

0.75

1

1.75

$6,340

342035

2/149 Stevens Street, Portarlington

Lot 2 PS 630980

0.5

1

1.5

$5,434

269686

151 Stevens Street, Portarlington

Lot 1 TP 123654

1

1

2

$7,245

265589

1/153 Stevens Street, Portarlington

Lot 3 PS 541672

0.75

1

1.75

$6,340

330979

2/153 Stevens Street, Portarlington

Lot 2 PS 541672

0.75

1

1.75

$6,340

330980

3/153 Stevens Street, Portarlington

Lot 1 PS 541672

0.75

1

1.75

$6,340

260617

158 Stevens Street, Portarlington

Lot 14 LP 20931

1

1

2

$7,245

323857

1/159 Stevens Street, Portarlington

Lot 1 PS 514386

0.75

1

1.75

$6,340

323855

2/159 Stevens Street, Portarlington

Lot 2 PS 514386

0.75

1

1.75

$6,340

260618

160 Stevens Street, Portarlington

Lot 13 LP 20931

1

1

2

$7,245

265590

161 Stevens Street, Portarlington

Lot 2 LP 203887

1

1

2

$7,245

260619

162 Stevens Street, Portarlington

Lot 1 LP 98790

1

1

2

$7,245

260564

163 Stevens Street, Portarlington

Lot 1 TP 695100

1

1

2

$7,245

260620

164 Stevens Street, Portarlington

Lot 2 LP 98790

1

1

2

$7,245

265392

165 Stevens Street, Portarlington

Lot 2 LP 123717

1

1

2

$7,245

260621

166 Stevens Street, Portarlington

Lot 1 TP 544871

1

1

2

$7,245

268711

1/167 Stevens Street, Portarlington

Lot 1 PS 447582

0.75

1

1.75

$6,340

319503

2/167 Stevens Street, Portarlington

Lot 2 PS 447582

0.75

1

1.75

$6,340

346352

1/168 Stevens Street, Portarlington

Lot 1 PS 639952

0.75

1

1.75

$6,340

346353

2/168 Stevens Street, Portarlington

Lot 2 PS 639952

0.5

1

1.5

$5,434

260565

169 Stevens Street, Portarlington

Lot 2 LP 126076

1

1

2

$7,245

260623

170 Stevens Street, Portarlington

Lot 5 LP 98790

1

1

2

$7,245

260624

172 Stevens Street, Portarlington

Lot 6 LP 98790

1

1

2

$7,245

260625

174 Stevens Street, Portarlington

Lot 7 LP 98790

1

1

2

$7,245

265596

1/71-73 Willis Street, Portarlington

Lot 1 PS 531173

0.75

1

1.75

$6,340

328975

2/71-73 Willis Street, Portarlington

Lot 2 PS 531173

0.5

1

1.5

$5,434

328976

3/71-73 Willis Street, Portarlington

Lot 3 PS 531173

0.5

1

1.5

$5,434

328977

4/71-73 Willis Street, Portarlington

Lot 4 PS 531173

0.5

1

1.5

$5,434

328978

5/71-73 Willis Street, Portarlington

Lot 5 PS 531173

0.5

1

1.5

$5,434

328979

6/71-73 Willis Street, Portarlington

Lot 6 PS 531173

0.75

1

1.75

$6,340

263078

75 Willis Street, Portarlington

Pt CA 6 Sec 10

0.75

1

1.75

$6,340

263079

77B Willis Street, Portarlington

Lot 2 TP 97548

0.75

1

1.75

$6,340

355438

77A Willis Street, Portarlington

Lot 1 TP 97548

0.75

1

1.75

$6,340

342124

1/79 Willis Street, Portarlington

Lot 1 PS 633325

0.75

1

1.75

$6,340

342125

2/79 Willis Street, Portarlington

Lot 2 PS 633325

0.75

1

1.75

$6,340

316701

80 Willis Street, Portarlington

Pt CA 5A Sec 18, CA 5 Sec 18

2

2

4

$14,490

263081

83 Willis Street, Portarlington

Pt CA 8 Sec 10, Pt CA 9 Sec 10

1

1

2

$7,245

263082

85 Willis Street, Portarlington

Lot 22 LP 98789

1

1

2

$7,245

263083

87 Willis Street, Portarlington

Lot 21 LP 98789

1

1

2

$7,245

263084

89-91 Willis Street, Portarlington

Lot 20 LP 98789, Lot 19 LP 98789

2

2

4

$14,490

263117

92 Willis Street, Portarlington

CA 1 Sec 19

2

2

4

$14,490

263085

93 Willis Street, Portarlington

Lot 18 LP 98789

1

1

2

$7,245

263118

94 Willis Street, Portarlington

CA 3 Sec 19

2

2

4

$14,490

263086

95 Willis Street, Portarlington

Lot 17 LP 98789

1

1

2

$7,245

263120

96 Willis Street, Portarlington

CA 4 Sec 19

2

2

4

$14,490

263087

97 Willis Street, Portarlington

Lot 16 LP 98789

1

1

2

$7,245

267193

98 Willis Street, Portarlington

Lot 1 LP 210751

1

1

2

$7,245

263088

99 Willis Street, Portarlington

Lot 15 LP 98789

1

1

2

$7,245

266976

100 Willis Street, Portarlington

Lot 1 LP 213980

1

1

2

$7,245

263089

101 Willis Street, Portarlington

Lot 14 LP 98789

1

1

2

$7,245

327042

102 Willis Street, Portarlington

Lot 1 PS 526798

1

1

2

$7,245

270823

1/103 Willis Street, Portarlington

Lot 1 PS 448104

0.75

1

1.75

$6,340

270824

2/103 Willis Street, Portarlington

Lot 2 PS 448104

0.5

1

1.5

$5,434

271081

104 Willis Street, Portarlington

Lot 1 PS 316308

1

1

2

$7,245

263091

105 Willis Street, Portarlington

Lot 12 LP 98789

1

1

2

$7,245

263125

106 Willis Street, Portarlington

CA 10 Sec 19

2

2

4

$14,490

263092

107 Willis Street, Portarlington

Lot 11 LP 98789

1

1

2

$7,245

338698

108 Willis Street, Portarlington

Lot 3 PS 605410

0.75

1

1.75

$6,340

338699

110 Willis Street, Portarlington

Lot 4 PS 605410

0.75

1

1.75

$6,340

338700

112 Willis Street, Portarlington

Lot 5 PS 605410

0.75

1

1.75

$6,340

351983

114 Willis Street, Portarlington

Lot 1 PS 712539

1

1

2

$7,245

263128

116 Willis Street, Portarlington

CA 4 Sec 20

2

2

4

$14,490

263129

118 Willis Street, Portarlington

CA 5 Sec 20

2

2

4

$14,490

263130

120 Willis Street, Portarlington

CA 6 Sec 20

2

2

4

$14,490

335761

122 Willis Street, Portarlington

Lot 1 PS 605388

1

1

2

$7,245

344787

124 Willis Street, Portarlington

Lot 1 PS 638025

1

1

2

$7,245

346846

126 Willis Street, Portarlington

Lot 4 PS 645789

1

1

2

$7,245

346847

128 Willis Street, Portarlington

Lot 1 PS 645789

0.75

1

1.75

$6,340

263134

130 Willis Street, Portarlington

Lot 24 LP 116459

1

1

2

$7,245

263135

132 Willis Street, Portarlington

Lot 23 LP 116459

1

1

2

$7,245

263136

134 Willis Street, Portarlington

Lot 22 LP 116459

1

1

2

$7,245

263137

136 Willis Street, Portarlington

Lot 21 LP 116459

1

1

2

$7,245

263138

138 Willis Street, Portarlington

Lot 20 LP 116459

1

1

2

$7,245

263139

140 Willis Street, Portarlington

Lot 19 LP 116459

1

1

2

$7,245

357161

1/157-159 Willis Street, Portarlington

Lot 12 LP 20931, Lot 11 LP 20931 Ppsd Lots 1-6 PS 717145

0.75

1

1.75

$6,340

357162

2/157-159 Willis Street, Portarlington

 

0.5

1

1.5

$5,434

357163

3/157-159 Willis Street, Portarlington

 

0.5

1

1.5

$5,434

357164

4/157-159 Willis Street, Portarlington

 

0.5

1

1.5

$5,434

357165

5/157-159 Willis Street, Portarlington

 

0.5

1

1.5

$5,434

357166

6/157-159 Willis Street, Portarlington

 

0.75

1

1.75

$6,340

347812

Unit 1/158 Willis Street, Portarlington

Lot 1 PS 637258

0.75

1

1.75

$6,340

347813

Unit 2/158 Willis Street, Portarlington

Lot 2 PS 637258

0.5

1

1.5

$5,434

347814

Unit 3/158 Willis Street, Portarlington

Lot 3 PS 637258

0.5

1

1.5

$5,434

347815

Unit 4/158 Willis Street, Portarlington

Lot 4 PS 637258

0.5

1

1.5

$5,434

263141

160 Willis Street, Portarlington

Lot 3 LP 57519

1

1

2

$7,245

263094

161 Willis Street, Portarlington

Lot 15 LP 98790

1

1

2

$7,245

263142

162 Willis Street, Portarlington

Lot 4 LP 57519

1

1

2

$7,245

263095

163 Willis Street, Portarlington

Lot 14 LP 98790

1

1

2

$7,245

263143

164 Willis Street, Portarlington

Lot 5 LP 57519

1

1

2

$7,245

263096

165 Willis Street, Portarlington

Lot 13 LP 98790

1

1

2

$7,245

263144

166 Willis Street, Portarlington

Lot 6 LP 57519

1

1

2

$7,245

263097

167-169 Willis Street, Portarlington

Lot 12 LP 98790, Lot 11 LP 98790

1

1

2

$7,245

263145

168 Willis Street, Portarlington

Lot 7 LP 57519

1

1

2

$7,245

263146

170 Willis Street, Portarlington

Lot 8 LP 57519

1

1

2

$7,245

263147

172 Willis Street, Portarlington

Lot 9 LP 57519

1

1

2

$7,245

 

$3,368,546.03



Attachment 1

PROCESS CHART

SPECIAL CHARGE PROJECTS –

(Section 163 – Local Government Act 1989)

Portarlington North East Group of Streets

Stage

Status

Description

Approval to prepare scheme

✓

Decision made to prepare scheme following consideration of surveys of property owners and feed back from the community. Council may then place the project in the budget system or proceed immediately to prepare a scheme. Scheme preparation involves survey, design and preparation of an apportionment of costs. May 2013.

Intention to Declare Scheme

✓

Report to Council providing information on scheme including advice of impending advertising of scheme and declaration of charge. Seeks Council approval by resolution to proceed with process. 17 February 2015

Advertisement

✓

The scheme is advertised in the local newspaper and all allotted property owners are notified by mail. This advertisement indicates Council’s intention and notification to ‘declare’ a scheme in a month’s time. 3 March 2015

Submissions

✓

From the time of advertising property owners have 28 days (as set down by the Local Government Act) to lodge submissions, either in support or opposition to the scheme. April 2015

Submissions Review Panel Hearing

✓

A Submissions Review Panel is convened (quorum of three Councillors) and meets to consider submissions. Some submissions are written only, and other submitters may wish to be heard before the Panel. The Panel makes a recommendation to Council regarding the scheme. 27 October 2015

Declaration Report

✓

Any time 28 days after advertising the scheme and after the Submissions Review Panel has met and considered submissions, Council considers a report and may proceed to “declare” the charges in accordance with its advertised intent.

Subsequent to this the Finance Manager issues the levy notices and there is a formal charge placed on the property.

This is the final step in the process for Council to make a decision on the scheme.

Appeal

 

Property owners may lodge an application for review with the Victorian Civil and Administrative Tribunal (VCAT) within one month of issue of the levy notice. An appeal is listed, heard and determined by the Tribunal and this process generally takes three to four months. Decisions made by VCAT are binding on all parties.

Construction

 

Council may then proceed to construct the works. Invoices are issued seeking payment of the estimated cost within one month of commencement.

Final Cost Report

 

At the completion of the works the scheme is “finalised” taking into account actual costs incurred and payments are adjusted accordingly.



[Back to List]

Cr Eddy Kontelj declared an Indirect Financial Interest in Agenda Item 19 – Tender and Award of Industrial Subdivision, Innovation Drive, Corio in that Drapers Civil are a significant customer of his employer and left the meeting room prior to discussion at 9:13pm.


19. Tender and Award of Industrial Subdivision, Innovation Drive, Corio

Portfolio:

Infrastructure, Parks & Gardens - Cr Ellis

Source:

City Services - Engineering Services

General Manager:

William Tieppo

Index Reference:

T1600019; 62-96 O’Brien’s Road, Corio
Innovation Drive, Corio


Purpose

The purpose of this report is to seek approval to vary the budget and award a tender for the first stage industrial subdivision construction known as Innovation Drive, Corio.

Summary

Cr Ellis moved, Cr Harwood seconded -

That Council:

  1. approve additional funds of $609,151 from C02317 Drainage Construction Program to enable the Innovation Drive subdivision to be constructed; and

  2. accept the tender submitted by Drapers Civil Contracting for a total contract price of $2,809,151 for the construction and associated works for C16000019 Stage 1 Innovation Drive.

Carried.


Background

The subdivision proposal in question is located on the parent property at 62 – 96 O’Brien’s Road, Corio. Funds of $2.2M have been secured in the current budget to construct part of a new road called Innovation Drive which intersects with O’Brien’s Road as a ‘T’ intersection on the southern side. The works will include road construction and all service provisions. A new sewer pumping station will also be constructed which will service the new subdivision and the future stage.

Council is currently in the final stages of a land sale at 62 – 68 O’Brien’s Road, Corio which is also part of the parent land at 62 – 96 O’Brien’s Road. This 7.2Ha parcel of land forms part of the Innovation Drive subdivision. The tender approval for the subdivision is conditional on the land sale proceeding. The negotiated sale price is $2.85 M and signed contracts and a deposit has been received from the purchaser.

The subdivision has been tendered and evaluated via Council’s procurement process. Award of this will allow Council to develop the land and fulfil our obligations for the land sale in a timely manner.


Discussion

A timber truss manufacturing company is looking to secure permanent premises for expansion at 62 – 68 O’Brien’s Road, Corio. This Council owned irregular shaped land lies within Council’s premium industrial estate at the GREP. Although the land is situated in close proximity to the ring road, when considering its irregular shape it is fortunate that a prospective purchaser has decided to buy.

In order to have this 7.2Ha parcel of land fully serviced, Council is proposing to construct the following works which are included in the current tender:

The tender price of $2.81M includes $500,000 of contingencies and provisional items that may not be necessary during construction. However the price still exceeds the budgeted amount and Council will need to approve additional funds to award the tender.

The original estimate for this subdivision was $2.2M and was based on contract market rates for other similar projects within the GREP and was considered appropriate for this project.

Once the tenders were submitted, it was realised that the tender prices were above the original estimate and the option of CEO delegation was no longer viable.

The original engineering estimate inadvertently excluded the hard stand provision for the land at 62-68 O’Brien’s Road or fencing of the new lots, estimated at $600,000. This was the cause of the higher than anticipated tender prices.

If awarding of this contract is further delayed it could have an adverse impact on the potential development of this land, as it could undermine the negotiations that have taken place with the purchase of the land at 62 – 68 O’Brien’s Road. The sale of this land was conditional on the subdivision progressing and sale contract documents have been signed and deposit paid in good faith.

Tenders for the Civil Works Innovation Drive, 62-69 O’Brien’s Road were invited via public advertisement in the Geelong Advertiser and on Tenderlink on Saturday 14 November 2015.

At the close of tenders on Wednesday 9 December 2015 the following tender submissions were received:

Tenderer

Draper’s Civil Contracting Pty Ltd

Harcom Pty Ltd

Winslow Constructors Pty Ltd


All tenders have been submitted exclusive of GST.

The tender submissions associated with this supply service were evaluated by a panel consisting of:

William Tieppo

General Manager City Services

Viciki Shelton

Manager Engineering Services

Vaughn Notting

Coordinator Engineering Design

Ron Hill

Project Engineer (Non Voting)

Peter Walker

Contracts Officer (Non Voting)


OHS mandatory requirements applied to this Tender.

All submissions responded to all mandatory requirements set down in the Tender documents and are considered to conform.

Tender submissions were assessed based on the respondent’s performance or tender response in the following areas:

Criteria

Weighting

Financial Assessment

50%

Technical Capability to meet specification

40%

Economic Contribution to Region

10%

 

100%


Extensive tender submission and task analysis due diligence was undertaken to ensure tendered bids satisfied our brief and project outputs. Panel members undertook a rigorous exercise of due diligence by assessing the various tenderer submissions. At the conclusion of the evaluation process the tenderers were ranked in the following order in accordance with the above criteria:

Tenderer

Rank

Draper’s Civil Contracting Pty Ltd

1

Harcom Pty Ltd

2

Winslow Constructors Pty Ltd

3


The evaluation panel has determined that Draper’s Civil Contracting Pty Ltd as the highest ranked and lowest priced tender represented best value to Council. Drapers Civil Constructing Pty Ltd is a locally based civil construction company, were rated highly competent having successfully undertaken numerous project works within the region. Drapers Civil Constructing Pty Ltd is well known to COGG staff having successfully delivered Stages 1 & 2 of works within the same precinct. The Panel’s assessment of their capability, past performance, sub contractors, plant and equipment / staffing levels demonstrated their ability to successfully deliver the works on behalf of Council.


Environmental Implications

During construction and the manufacture and procurement of materials, energy is used resulting in some greenhouse gas emissions. This stops when construction is complete.

The project does not create waste with the exception of some excavated material. This is being used as fill in other parts of the GREP.

The area is not environmentally significant and the proposal does not affect any natural habitats.

The proposal does not require the removal of trees.

Storm water from the proposed subdivision will be directed to the O’Brien’s Road wetland system where it will undergo retardation and ultimate treatment to best practice standards.


Financial Implications

The project is a one off capital cost and there will be minimal ongoing maintenance costs. If approved, the project will proceed this financial year.

Financial summary is as follows:

Current Approved Budget

$2,200,000

Cost to Council (Award tender)

$2,809,151

Total shortfall

$609,151


The shortfall can be accommodated from within the 2015/16 Drainage Construction Program C02317 through the reprioritisation of projects.


Policy/Legal/Statutory Implications

This report provides the policy and legal mechanisms necessary for Council to award a tender.


Alignment to City Plan

This project supports the strategic directions in Community Wellbeing, Growing Our Economy and Sustainable Built & Natural Environment areas.


Officer Direct or Indirect Interest

No council officers involved in this project or report have declared a direct or indirect interest in this matter.


Risk Assessment

There will be a risk to Councils reputation if this project cannot be completed in a timely fashion. There is a risk that the negotiated sale of land at 62 – 68 O’Brien’s Road may not carry through. There will also be a missed opportunity in securing a cost positive investment at the GREP.


Social Considerations

Council’s commitment to the construction of the staged subdivision is in response to providing industrial land to cater for and encourage growth in the heavy industry sector.

If Council is unable to complete this project in a timely manner there is likely to be disruption to this growth.


Human Rights Charter

It is not evident or likely that this report would negatively impact any of the rights contained in the Charter of Human Rights.


Consultation and Communication

There are no communication issues or requirements if the recommendations of this report are accepted.


[Back to List]

Cr E Kontelj re-entered the meeting room at 9:18pm


20. Contractual Matter (Confidential)

Portfolio:

Governance – Cr Lyons (Mayor)

Source:

Strategy & Performance – Capital Projects

General Manager:

Dean Frost

Index Reference:

Capital Projects


Cr Macdonald moved, Cr Harwood seconded -

That in accordance with Section 89 (2) (h) of the Local Government Act 1989, this matter, which the Council considers would prejudice the Council or any person, be considered at the conclusion of all other business at which time the meeting be closed to members of the public.