Council Minutes - Section B: Reports - 16 August 2016

Contents | Previous Page: Section A - Procedural Matters | Next Page: Section C - Assembly of Councillors

Reports tabled at the Ordinary Meeting of Council on Tuesday date held at the Council Conference and Reception Centre in City Hall, 57 Little Malop Street, Geelong.


  1. Adoption of C337 – Correction of Planning Scheme Anomalies

  2. Road Renaming – Dog Leg Lane to Timms Lane, Geelong West

  3. Central Geelong 40Km/Hr Speed Zone

  4. CEO Quarterly Headline Report – April to June 2016

  5. Supply of Concrete and Concrete Works

  6. Future of the NDIS – Full Scheme Roll Out

  7. Armstrong Creek – Early Acquisition of Land

  8. Appointment of Two External Members to the Audit Advisory Committee (Confidential)


1. Adoption of C337 – Correction of Planning Scheme Anomalies

Source:

Planning and Development – Strategic Implementation

Acting General Manager:

Peter Bettess

Index Reference:

Application: C337


Purpose

The purpose of this report is to adopt Planning Scheme Amendment C337 to the Greater Geelong Planning Scheme.


Summary

K Alexander moved, P Dorling seconded -

That Council

  1. Adopts Amendment C337 to the Greater Geelong Planning Scheme as contained in Appendix 1 of this report; and

  2. Submits the adopted Amendment together with the prescribed information to the Minister for Planning requesting approval.

Carried.


Background

The Amendment is required to correct a number of anomalies in the Greater Geelong Planning Scheme (both maps and ordinance) that have become apparent during the past months of operation. The Amendment is considered to be house-keeping in nature and has been prepared to ‘tidy-up’ the Scheme.

It is incumbent on Council to resolve these anomalies so that the Planning Scheme is relevant, up-to-date, of a high quality and standard, and meets the Department of Environment, Land, Water and Planning (DELWP) requirements. This Amendment will address these matters. This is the ninth anomalies amendment since the new format Scheme came into operation in July 2000.

Amendment C337 applies to a number of different locations across the municipality including:

On 29 March 2016 Council sought authorisation from the Minister for Planning for this Amendment and exemption from notification as per its resolution under delegation on 23 March 2016. DELWP subsequently advised Council on 5 April that it may proceed to prepare the amendment. As part of that authorisation, DELWP provided the following requirements:

As part of the authorisation process DELWP queried one proposed change affecting the schedule to the Heritage Overlay for 43 Lawton Avenue Geelong West. Officers had made an error in the description of the change and this has been correctly described in this report for adoption. The correction required is to delete HO721 from the Planning Scheme Maps and in its place apply HO1633 – this being the precinct overlay.

The three prescribed Ministers (Minsters for Environment, Agriculture, and Energy & Resources) from which exemption of notice cannot be granted under the Planning and Environment Act 1987, have been notified for a two week period between 22 April and 13 May 2016 (allowing time for mail). No submissions have been received from them. As one of the changes proposed affected Crown Land, DELWP required Council to notify Native Title Services Victoria of the amendment. Again, no submission has been received from that Authority.

Amendment C337 proposed for adoption makes the following changes to the Planning Scheme:

Discussion

On 29 March 2016 Council sought authorisation from the Minister for Planning for this Amendment and exemption from notification as per its resolution under delegation on 23 March 2016. DELWP subsequently advised Council on 5 April that it may proceed to prepare the amendment. As part of that authorisation, DELWP provided the following requirements:

As part of the authorisation process DELWP queried one proposed change affecting the schedule to the Heritage Overlay for 43 Lawton Avenue Geelong West. Officers had made an error in the description of the change and this has been correctly described in this report for adoption. The correction required is to delete HO721 from the Planning Scheme Maps and in its place apply HO1633 – this being the precinct overlay.

The three prescribed Ministers (Minsters for Environment, Agriculture, and Energy & Resources) from which exemption of notice cannot be granted under the Planning and Environment Act 1987, have been notified for a two week period between 22 April and 13 May 2016 (allowing time for mail). No submissions have been received from them. As one of the changes proposed affected crown land, DELWP required Council to notify Native Title Services Victoria of the amendment. Again, no submission has been received from that Authority.

Amendment C337 proposed for adoption makes the following changes to the Planning Scheme:

Planning Scheme Map Changes:

  1. Rezone part of the land at 11 and 12 Marina Court, Lara from UFZ to GRZ1.

  2. Delete HO1582 from part of the land at Pt Henry, and apply HO1133 to another part of the land at Pt Henry.

  3. Rezone part of the land at 3/85 The Terrace, Ocean Grove from RDZ1 to C1Z.

  4. Delete HO1636 from the land at 311-329 Wallington Road, Wallington.

  5. Delete HO151 from the land at 2, 3, 4-5 and 7 Panyall Close, Hamlyn Heights and 42, 44 and 46 Chaucer Street, Hamlyn Heights

  6. Delete HO1567 from part of the land at 61-65 Kensington Road, Leopold.

  7. Rezone the south eastern corner of the land at 66 Gellibrand Street, Portarlington from PPRZ to GRZ2.

  8. Rezone part of the land at 27-31 McCurdy Road, Herne Hill from C1Z to GRZ2.

  9. Rezone the land at 110 Marshalls Road, Staughton Vale from PCRZ to RCZ1.

  10. Delete HO1708 from part of the land at 127 Staceys Road, Connewarre.

  11. Rezone land at lot 89F and 25 Staughton Vale Road, Staughton Vale from part PUZ1 and Part FZ to PCRZ.

  12. Delete SLO5 from part of the land at 25 Staughton Vale Road, Staughton Vale.

  13. Delete HO721 from 43 Lawton Avenue, Geelong West.

Planning Scheme Ordinance Changes

  1. Amend the Schedule to Clause 43.01 to correct the outbuilding description for HO1411.

  2. Amend the Schedule to Clause 43.01 to delete the entry for HO1636.

  3. Amend the Schedule to Clause 43.01 to remove the interior alterations controls requirement for HO90.

  4. Replace Schedule 1 to Clause 44.05 with a new Schedule 1.

Environmental Implications

No adverse environmental implications are expected as a result of this Amendment.


Financial Implications

There are no ongoing financial implications for Council arising from this Amendment.


Policy/Legal/Statutory Implications

The Amendment is consistent with the format for Planning Schemes and with the Ministerial Direction on the Form and Content of Planning Schemes. The Amendment is consistent with the State and Local Planning Policy Framework (SPPF and LPPF). As the changes proposed are minor and essentially administrative in nature, there are no implications for the LPPF. Some minor corrections to the LPPF are proposed by this Amendment and will improve its interpretation and relevance.


Alignment to City Plan

The Amendment supports the Sustainable Built and Natural Environment and Growing Our Economy strategic directions of City Plan.


Officer Direct or Indirect Interest

No Council officers have any direct or indirect interest, in accordance with Section 80 (C ) of the Local Government Act, to which this Amendment relates.


Risk Assessment

There are no notable risks associated with either implementing or not implementing the recommendations contained in this report. Given its minor, procedural nature, this amendment has been assessed as having a low level of risk.


Social Considerations

No adverse social impacts are expected to result from this Amendment.


Human Rights Charter

The Amendment will not impact on basic human rights, freedoms and responsibilities as set out in the Charter. Planning legislation provides for the exemptions to the usual consultation process for Amendments, which the Minister for Planning duly granted.


Consultation and Communication

Limited notice of the Amendment was given to the three prescribed Ministers and to Native Title Services Victoria. Due to the nature of the proposed Amendments, officers determined that it was unnecessary to notify individual landowners, following the same approach that Council has done with all other anomaly Amendments since 2000.



APPENDIX 1 – AMENDMENT TO BE ADOPTED

Planning and Environment Act 1987

GREATER GEELONG PLANNING SCHEME

AMENDMENT C337

INSTRUCTION SHEET

The planning authority for this amendment is Greater Geelong Planning Scheme

The Greater Geelong Planning Scheme is amended as follows:

Planning Scheme Maps

The Planning Scheme Maps are amended by a total of 14 attached map sheets.

Zoning Maps

  1. Amend Planning Scheme Map Nos. 1, 5, 18, 36, 43 and 81 in the manner shown on the 6 attached maps marked “Greater Geelong Planning Scheme, Amendment C337”.

Overlay Maps

  1. Amend Planning Scheme Map Nos. 32HO, 37HO, 40HO, 57HO, 79HO, 81HO, and 5SLO in the manner shown on the 8 attached maps marked “Greater Geelong Planning Scheme, Amendment C337”.

Planning Scheme Ordinance

The Planning Scheme Ordinance is amended as follows:

  1. In Overlays – Clause 43.01, replace Schedule 1 with a new Schedule 1 in the form of the attached document.

  2. In Overlays – Clause 44.05, replace Schedule 1 with a new Schedule 1 in the form of the attached document.

End of document


Amendment C337 - General Residential Zone - Schedule 1
Amendment C337 - Commercial 1 Zone
Amendment C337 - General Residential Zone - Schedule 2 - Part of Planning Scheme map 43
Amendment C337 - General Residential Zone - Schedule 2 - Part of Planning Scheme map 36
Amendment C337 - Rural Conservation Zone - Schedule 1
Amendment C337 - Public Conservation and Resource Zone
Amendment C337 - Area to be deleted from a Heritage Overlay - Part of Planning Scheme map 40HO
Amendment C337 - Area to be deleted from a Heritage Overlay - Part of Planning Scheme map 81HO
Amendment C337 - Area to be deleted from a Heritage Overlay - Part of Planning Scheme map 32HO
Amendment C337 - Area to be deleted from a Heritage Overlay - Part of Planning Scheme map 57HO
Amendment C337 - Area to be deleted from a Heritage Overlay - Part of Planning Scheme map 79HO
Amendment C337 - Area to be deleted from a Heritage Overlay - Part of Planning Scheme map 37HO
Amendment C337 - Heritage Overlay (HO322)
Amendment C337 - Heritage Overlay

*Note that due to its size, the full Schedule 1 to Clause 43.01 has not been included – only the pages with changes have been included in this report

Heritage Overlay Schedule - Page 59 of 163
Heritage Overlay Schedule - Page 140 of 163

*Note that due to its size, the full Schedule 1 to Clause 44.05 has not been included – only the pages with changes have been included in this report

Special Building Overlay - Page 11 of 26
Special Building Overlay - Page 12 of 26
Special Building Overlay - Page 13 of 26
Special Building Overlay - Page 14 of 26
Special Building Overlay - Page 15 of 26
Special Building Overlay - Page 16 of 26
Special Building Overlay - Page 17 of 26
Special Building Overlay - Page 18 of 26
Special Building Overlay - Page 19 of 26
Special Building Overlay - Page 20 of 26
Special Building Overlay - Page 21 of 26
Special Building Overlay - Page 22 of 26
Special Building Overlay - Page 23 of 26
Special Building Overlay - Page 24 of 26
Special Building Overlay - Page 25 of 26
Special Building Overlay - Page 26 of 26
[Back to List]

2. Road Renaming – Dog Leg Lane to Timms Lane, Geelong West

Source:

Strategy & Performance - Financial Services

General Manager:

Dean Frost

Index Reference:

Financial Reporting - Financial Year 2015/2016


Purpose

To seek approval to rename Dog Leg Lane, Geelong West to Timms Lane, Geelong West.


Summary

K Alexander moved, P Dorling seconded -

That Council approve the renaming of Dog Leg Lane to “Timms Lane, Geelong West”.

Carried.


Background

Council is the responsible authority for naming and renaming roadways under the Local Government Act 1989. To administer this, Council is required to utilise the Guidelines for Geographic Names 2010 (the Guidelines).

A subdivision occurred on the property historically known as 60 Aberdeen Street, Geelong West, that created two new properties with frontage and access off the laneway that runs parallel between Villamanta and Aberdeen Streets, Geelong West. Current building development on the site required unique street addresses to be allocated. Prior to the subdivision, no property fronted the laneway concerned. The name Dog Leg was suggested by the property owner, together with a number of other names as part of the subdivision consultation process. Dog Leg was the only name that met the Guidelines.

Council received a petition from nine adjoining and 34 non adjoining property owners / residents requesting that Dog Leg Lane, Geelong West be renamed. The majority of the petitions were opposed to the name Dog Leg as they believed it was a derogatory name.

The petition requested that a new name be chosen based on heritage aspects of the area.

Letters have been sent to the petition submitters, adjoining property owners and residents advising them of the proposal and intention to rename this laneway to “Timms Lane, Geelong West”.


Discussion

It is proposed to rename Dog Leg Lane to “Timms Lane, Geelong West”.

This name has been chosen in honour of the Timms family who were one of Geelong’s largest wool exporters. Their property holdings were between Aberdeen and Autumn Street, Geelong West. Records show that the Timms Family were the early owners of the land near the corner of Aberdeen Street and Coronation Street. Part of this land was sold to James Austin in 1849 and later became the Argyle Hotel in 1855.

The name “Timms” meets the Guidelines for Geographic Names 2010.

The proposed renaming was advertised in the Independent newspaper on 15 April 2016 and the Geelong Advertiser newspaper on 16 April 2016. Five submissions on the proposal were received.

Two submissions requested that Dog Leg Lane be retained. Two submissions did not object to the name “Timms” however, provided other suggested names. One submission suggested that instead of honouring an historic land owner, Council should honour someone who has left a lasting legacy. Three submissions suggested other names that they believed should be considered however, by using the Guidelines these suggested names were shown to be duplications and therefore cannot be used.


Environmental Implications

There are no environmental issues arising from this report.


Financial Implications

The approximate cost to Council is $940.00 This includes advertising, notification to adjoining property owners and residents, notification to authorities and street signage.


Policy/Legal/Statutory Implications

The Local Government Act 1989, the Geographic Place Names Act 1998 and the Guidelines for Geographic Names 2010 have been followed.


Alignment to City Plan

The proposal aligns to City Plan with the encouragement of Community Wellbeing.


Officer Direct or Indirect Interest

There is no Council Officer with direct or indirect interest involved in this report.


Risk Assessment

If an emergency situation occurred, Council’s proposal to rename this section of roadway could minimise the risk or failure to be able to access a situation in a timely manner.


Social Considerations

The renaming of this roadway will ensure the community have a more acceptable road name in place and allow for clearer identification of properties by the general public and emergency services.


Human Rights Charter

It is the right of every resident and property owner for their property to have a unique address in order to receive services and reduce confusion or delay of emergency services.


Consultation and Communication

Correspondence has been sent to the petition submitters, adjoining property owners and residents advising them of the proposed renaming and inviting submissions.

The proposal was advertised in the Independent newspaper on 15 April 2016 and the Geelong Advertiser newspaper on 16 April 2016. This advertisement also advised that descendants of the Timms family were invited to submit submissions.

The proposal was published on Council’s Geelong Australia website for 30 days as per the Guidelines for Geographic Names 2010.

Council was unable to identify and thus consult with any surviving members of the Timms family.

Five submissions were received in regards to this proposal.

Subject to Council and the Registrar of Geographic Names approval, the relevant authorities and abutting owners and residents will be notified of the official registration of this road renaming.


Attachment A

Map showing Dog Leg Lane - to be renamed Timms Lane

[Back to List]

3. Central Geelong 40Km/Hr Speed Zone

Source:

Investment & Attraction - Central Geelong Action Plan

General Manager:

Brett Luxford

Index Reference:

PRJ-16-1281: Central Geelong Action Plan Correspondence

SUB-16-3146: Speed Limits & Zones


Purpose

To reduce the speed limit within Central Geelong in order to create an environment that supports safe movement and city life.


Summary

K Alexander moved, P Dorling seconded -

That Council:

  1. notes the Central Geelong 40km/hr speed zone initiative;

  2. undertakes community engagement for a period of one month;

  3. receives a report on the outcomes of the engagement and implementation.

Carried.


Background

The Central Geelong Action Plan aims to:

“Create an environment which prioritises safe and accessible movement of pedestrians, cyclists and public transport and redirects non-city destination heavy vehicles away from Central Geelong and links precincts.”

(Central Geelong Action Plan, Page 16)

A slow-speed environment has been demonstrated to substantially improve safety for all transport modes, particularly pedestrians and cyclists. A 40km/hr speed zone is proposed within Central Geelong to support the pedestrianisation and activation of streets.

It should be noted that the 40km/hr zone initiative is directly aligned with the 2013-2022 Victorian Road Safety Strategy and the implementation of State Government policy, as follows:

“… the Victorian road safety partners (VicRoads, Victoria Police, the Department of Justice and the Transport Accident Commission) have adopted a Safe System philosophy to road safety. This is a holistic method that aims to minimise the risk of death or serious injury on the roads by taking into account the interaction between roads, vehicles, speeds and road users.

The key principles underpinning and driving a safe system approach are that:

What is known, is that even ‘low level’ speeding impacts on the number of crashes, as it is:

“the most common where drivers are marginally over the limit (usually 5km/hr). Research shows that with each 5km/hr increase in travelling speed above 60km/hr, the risk of a collision resulting in death doubles. Reducing speed by 5km/hr can result in a 15% decrease in crashes”2.

Council and VicRoads support the TAC ‘towards zero’ vision, which is based on the principle that everyone has the right to use our roads and streets without threat to life or health. The key message of this campaign is that ‘life and health should never be exchanged for other benefits in our society, such as getting from A to B quicker’.

The Central Geelong Task Force first considered a proposal for a 40km/hr zone in the CBD in April 2015. Subsequently, the implementation of a Central Geelong 40km/hr speed zone was endorsed for consultation in March 2016.

Since that time, officers have worked in partnership with VicRoads and the Transport Accident Commission (TAC) to resolve the details of the speed limit change and develop the communication program.


Discussion

What are the statistics that support a 40km/hr zone in Central Geelong?

156 reported crashes have occurred on roads in Central Geelong in the last five years, involving over 400 people. 52 people suffered a serious injury and 135 suffered minor injuries as a result of a collision. Both pedestrians and bike riders are over represented in the statistics. Approximately 70% of all crashes were recorded to have occurred in daylight.

Traffic surveys show the average travel speeds of vehicles in Central Geelong are between 37km/hr and 46km/hr. A summary of the findings is provided below on a seven day average:

It is important to note that only 13% of traffic volumes within Central Geelong occur between 7pm to 7am and on some roads up to 8.5% of traffic is travelling above the posted speed limit.

In a CBD setting, where there are increasing numbers of pedestrians and cyclists, their level of interaction between roads, vehicles and speeds increases, as does the risk of crashes, injury or death. In this context, the implementation of a 40km/hr zone is a significant initiative in improving safety for all road users.

What should the extent of a 40km/hr zone be for Central Geelong?

Crash statistics, the existing and future urban environment have been considered in developing the extent of the 40km/hr speed zone shown in Attachment 1.

A ‘whole of city grid’ approach is proposed, to provide consistency and clarity for all road users. The area between Swanston Street and Latrobe Terrace and McKillop Street to the bay is proposed to be included. The general principle is, once you cross these key streets or turn into the grid, you are in the 40km/hr zone. However, the detail of the signage plan will determine the exact transition points.

Importantly, Myers Street, Bellarine Street and the intersections with these two key roads are intended to be included in the 40km/hr zone, ensuring that the busy pedestrian environment of the major hospitals and health precinct are included within this pedestrian-priority zone. These reinforce the eastern and southern extents, with Matthew Flinders College, The Gordon, Geelong Station and Deakin University’s landholdings reinforcing the western extent of the proposed 40km/hr speed zone.

It should be noted that the ‘whole of city grid’ approach reflects what currently exists in Melbourne. Advice has been sought from officers involved in implementing the 40km/hr speed zone initiative in Melbourne CBD, who raised concerns that the staged approach to roll out in that context created confusion for all road users.

VicRoads has provided in-principle support for the proposal.

Communication and engagement

The draft Communications Brochure (refer Attachment 1) has been prepared in conjunction with VicRoads, planned to be publicly released as a co-branded initiative.

A video has been developed to demonstrate the ‘real’ impact the speed zone change will have to vehicle users. The video demonstrates two cars travelling through Central Geelong, one at 50km/hr one at 40km/hr, showing there is no significant difference in travel time in a CBD environment.

A community engagement period of four weeks is proposed from 25 August 2016 to 22 September 2016, pending Council endorsement on the 16 August 2016. The purpose of the engagement is to obtain public feedback on the proposal and understand the concerns arising from the initiative, to inform decisions about implementation.

This approach is consistent with the IAP2 spectrum of public participation, ‘consult’ level of engagement.

The timing of the engagement period for the Central Geelong 40km/hr zone has been coordinated with the communications and engagement activity by TAC for its ‘Graham’ campaign, which focuses on the vulnerability of road users and the limitations to the forces the human body can tolerate. Graham is a human sculpture of what the body would look like if it was to be designed to survive low-impact crashes and will be on exhibition in Geelong from 11 August 2016 until 14 September 2016.


Environmental Implications

There are no environmental impacts arising from this report.


Financial Implications

A preliminary estimate to implement the initiative is $250,000, part funded by the Central Geelong Action Plan cost centre, with funds also being sought as part of a TAC Safer Road Infrastructure program.


Policy/Legal/Statutory Implications

There are no policy/legal/statutory implications arising from this report.


Alignment to City Plan

The proposal closely aligns with ‘Growing the Economy’ and ‘Sustainable and Built Environment’ by supporting the revitalisation of Central Geelong and use of more sustainable transport options to move around within the CBD.


Officer Direct or Indirect Interest

No officers involved in this report have any direct or indirect interest in accordance with Section 80(c) of the Local Government Act.


Risk Assessment

Risks to the safety of all road users in Central Geelong will be reduced as a result of the implementation of the initiative outlined in this report.


Social Considerations

The social impacts arising from this report include creating a safer environment for all road users through lowering vehicle speeds. Slower speeds will enhance the environment for pedestrians and cyclists, as well as improving amenity and enhancing opportunities for street life.


Human Rights Charter

The outcomes described in this report will not impact on any basic rights, freedoms and responsibilities as set out in the Charter.


Consultation and Communication

This project has been developed in collaboration with key stakeholders including VicRoads and TAC. As outlined in the report, it is proposed to ‘consult’ as defined in the IAP2 spectrum of public participation, to inform decisions about implementation.


[Back to List]

4. CEO Quarterly Headline Report – April to June 2016

Source:

Strategy & Performance - Strategy & Program Delivery

General Manager:

Dean Frost

Index Reference:

Corporate Management - Planning & Strategy


Purpose

To provide Council with a quarterly update on the organisations performance measures and assist in strategic decision making and continuous improvement activities.


Summary

K Alexander moved, P Dorling seconded -

That Council notes the CEO Quarterly Headline Report – April to June 2016, as a means of providing a comprehensive picture of Council’s performance in particular areas.

Carried.


Background

The headline report has been prepared quarterly to provide Council visibility of the health of the organisation and assist in strategic decision making and continuous improvement activities.

This report contains key information about the delivery of organisational activities and high level headlines that measure the effectiveness and efficiency of the organisation

Data is captured with a focus on the following:

  1. Community Indicators – (Strategic view of outcomes the organisation is aiming to influence). Data was collected from the following for the quarterly report:

    Community Satisfaction Survey,

    Unemployment statistics for March,

    Building Activity for June and

    Quarterly Engagement Dashboard were captured in this section.

  2. Visitors to Geelong & The Bellarine including facts and figures to support the regions popularity and reputation of a short-break destination.

  3. Our People (Measuring our resourcing, health and engagement of our people/employees). Staff achievements have been highlighted this quarter.

  4. Community Interactions (Measuring the community’s satisfaction with Council). Online activity and media coverage being the items of prominence this quarter.


Discussion

The CEO Quarterly Headline Report currently provides data from four key areas as means to provide performance measures; which may expand over time with new proposed measures, targets and trends.

The report will allow us to become a results oriented organisation and will monitor how we perform against current organisation, other council’s and state trends.


Environmental Implications

The CEO Quarterly Headline report could possibly outline objectives and strategies to deliver the environmental benefits to the community.


Financial Implications

There are no immediate financial implications, however in the current format provides data of how Council is tracking within its own budget.


Policy/Legal/Statutory Implications

No known implications.


Alignment to City Plan

Not applicable.


Officer Direct or Indirect Interest

There is no direct or indirect officer interest to which this report relates.


Risk Assessment

Monitoring Council’s performance measures provides factual data for the organisation to deliver effective and efficient services.


Social Considerations

The report outlines objectives and strategies to deliver social benefits to the community.


Human Rights Charter

There are no known positive or negative effects.


Consultation and Communication

Quarterly reporting will be provided to the organisation and made public to the Community via the relevant Ordinary Meeting of Council.

 
[Back to List]

5. Supply of Concrete and Concrete Works

Source:

City Services - Engineering Services

General Manager:

William Tieppo

Index Reference:

Project T1600012


Purpose

The purpose of this tender is to establish a panel of concreters for the supply of concrete and concrete works throughout the municipality.


Summary


K Alexander moved, P Dorling seconded -

That Council:

  1. Accept the tender submission/’s from:

    Aaron McCurdy Concreting P/L (ATF) A & C McCurdy Family Trust

    Armstrong Creek Concreting & Outdoor Constructions Pty Ltd

    CCP Group Pty Ltd (ATF) The CCP Group Trust

    CJ Walters Concreting PL (ATF) For Walters Business Trust

    Coppards Concreting Pty Ltd

    De Fran Concreting Pty Ltd

    Geelong Kerbing Pty Ltd (ATF) The Kerbing Settlement Trust

    Vince & Anna Rotiroti Pty Ltd

    for Tender No T1600012 – Panel arrangement for Supply of Concrete and Concrete Works for the associated schedule of rates (exclusive of GST). The period of the contract will be for two (2) years with an option for Council to extend the period by one (1) year.

  2. The Chief Executive Officer be authorised to sign the contract documents for and on behalf of the City of Greater Geelong Council.

Carried.


Background

Tenders for the supply of concrete and concrete works were invited via public tender on Saturday 5 December 2015. At the close of tenders on Thursday 28 January 2016 the following tender submissions were received (in alphabetical order):

Tenderer

Aaron McCurdy Concreting P/L (ATF) A & C McCurdy Family trust

Armstrong Creek Concreting & Outdoor Constructions Pty Ltd

CCP Group Pty Ltd (ATF) The CCP Group Trust

CJ Walters Concreting PL (ATF) for Walters Business Trust

Coppards Concreting Pty Ltd

De Fran Concreting Pty Ltd

Geelong Kerbing Pty Ltd (ATF) The Kerbing Settlement Trust

Ozgroup Constructions Pty Ltd

Prestige Concrete Services

Vince & Anna Rotiroti Pty Ltd



Discussion

The tender submissions associated with this service were evaluated by a panel of authorised Council Officers.

Stage One – Mandatory Criteria

Mandatory Requirements do not apply to this Tender.

Stage Two – Comparative Criteria

Tender submissions were assessed based on the tender response in the following areas:

Criteria

Project Delivery – Capability & Experience

Project Delivery – Methodology/plan for performing contract

Project Delivery – Staffing levels, proposed plant & equipment, extent of sub contracting

Economic Contribution to Geelong Region

Price


At the conclusion of the evaluation of the tender submissions the following eight (8) were the highest ranked with a clear margin to the next tier of tender submissions.

Tenderer (in alphabetical order)

Aaron McCurdy Concreting P/L (ATF) A & C McCurdy Family trust

Armstrong Creek Concreting & Outdoor Constructions Pty Ltd

CCP Group Pty Ltd (ATF) The CCP Group Trust

CJ Walters Concreting PL (ATF) for Walters Business Trust

Coppards Concreting Pty Ltd

De Fran Concreting Pty Ltd

Geelong Kerbing Pty Ltd (ATF) The Kerbing Settlement Trust

Vince & Anna Rotiroti Pty Ltd


Tenderers with an overall score of 60 points or above were deemed to have the necessary skills, experience and resources to undertake the service. The tenderers who achieved this score were then assessed on a value for money basis.

The eight (8) tenderers that scored 60 points or more were subsequently deemed to have provided value for money submissions by the evaluation panel. Each of the recommended panel members were contracted under the previous Concrete contract.

The panel believe that due to COGG’s concrete program requirements that all recommended panel members will be utilized and allocated work via this contract.


Environmental Implications

Any environmental implications associated with this contract will arise from the execution of these works. It is considered that these are the responsibility of the Contractor and will be managed through the contract documentation


Financial Implications

This is a schedule of rates tender and will rely upon the amount of funds allocated in Council’s various capital and recurrent budgets.

The current budget allocation for this service is approximately $6,300,000 per annum. The core programs include Capital and Recurrent Footpath replacement($3.6 million), Capital and Recurrent Kerb works ($2.2 million), Special Rates and Charges footpath and kerb works ($500k).


Policy/Legal/Statutory Implications

The requirements of Section 186 of the Local Government Act have been complied with for this tender. There are no other policy, legal or statutory implications associated with this tender process.


Alignment to City Plan

The provision of this service has a positive impact on all key City Plan objectives


Officer Direct or Indirect Interest

No officers or contractors involved in the preparation of this report have a direct or indirect interest in matters to which this report relates


Risk Assessment

There are not considered to be any risks associated with the acceptance of this tender that cannot be managed through the contract conditions


Social Considerations

There are no social implications that will arise from the acceptance of this tender.


Human Rights Charter

There are no Human Rights Charter implications that will arise from the acceptance of this tender.


Consultation and Communication

There are no communication issues associated with the acceptance of this tender. Council’s representative will liaise with affected community groups.


[Back to List]

6. Future of the NDIS – Full Scheme Roll Out

Source:

Community Life / Aged and Disability Services

General Manager:

Linda Quinn

Index Reference:

UB-16-563: Community Services and Development / Aged and Disability Care


Purpose

To advise Council of the net costs associated with continuing as a provider to the NDIS.


Summary


K Alexander moved, P Dorling seconded -

That Council:

  1. Consistent with its 2013 decision, and as a result of the NDIA payments being lower than Council’s cost structure, withdraw as a provider of house cleaning and personal care services to the NDIA; and

  2. Formally advise clients and the NDIA of Council’s withdrawal by 30 September 2016.

Kathy Alexander moved, P Dorling seconded –

That Standing Orders be suspended to enable discussion of a question asked from the Gallery in relation to the Future of the NDIS.

Carried.

Standing Orders were suspended at 6:28pm

Kathy Alexander moved, P Dorling seconded –

That Standing Orders be resumed.

Carried.

Standing Orders were resumed at 6.31pm.

Upon resumption of Standing Orders the motion was carried.


Background

The NDIS has been funded through a new Commonwealth government levy and the reallocation of existing program funding, including HACC and Individual Support as in-kind contributions.

The bilateral agreement between the State and Commonwealth governments sought to maintain stability in the service system in the early phases of the scheme and forced Local Government, amongst others, to become service providers to the NDIS.

In 2013 Council resolved to remain a provider to the NDIA to the extent that all costs were met.

The NDIS policy platform is based on:


Discussion

Council was advised by DHHS in May 2016 that, as a result of the NDIS full scheme roll out, $1.798M of Council’s 2016-17 HACC income would be permanently allocated to the NDIA. If Council was to remain a provider to the NDIA it would do so on the basis of a retrospective creditor.

From July 2016, the standard payments for house cleaning, assistance with self-care and community access, as shown below, will be inadequate to cover the full cost of Council’s service provision.

From 1 July 2016 the net cost to Council of service delivery would be in the order of $17 per hour ($510,000 per annum).

Ceasing service provision for house cleaning and assistance with self-care will impact over 200 clients who will need to transfer to alternate providers. This change will be difficult for some, although NDIA management have indicated that they are confident that there are ample alternate providers available to take on the clients.

A communications plan will be implemented to ensure that all clients impacted will have consistent and compassionate information and practical assistance. Transition to alternate providers will be managed over a period of time and will be done collaboratively with the NDIA, whose staff have undertaken to provide Service Coordination to all clients who require additional support in moving to a new provider.

The withdrawal of these specific NDIS services would result in a 13% reduction to service hours, and impact on approximately 175 Community Care Workers (CCWs). Of these, 132 CCWs will experience a loss of between 0 and 5 hours per week, and 41 will experience a loss of 5 or more hours per week.


Environmental Implications

Not applicable.


Financial Implications

A budget adjustment of $1.798M of income has been made along with a corresponding level of expenditure in Council’s budget in 2016-17.


Policy/Legal/Statutory Implications

Council’s decision has been influenced by, and is a response to, the Commonwealth Government’s policy and legislative changes.


Alignment to City Plan

The withdrawal of select service provision to the NDIA will not impact significantly on Council’s Strategic direction.


Officer Direct or Indirect Interest

No officer who prepared this report has any direct or indirect interest other than as an employee of Council.


Risk Assessment

The withdrawal of services will be stressful for some clients and staff and as such may result in negative press or reputational risk. Staff will be supported through the transition period and will have access to Council’s Employee Assistance Program.


Social Considerations

Some permanent part time staff will have their income reduced as a result of the 13% reduction in work. This will necessitate a realignment of resources. Measures will be taken to minimise the loss of work hours to meet the income needs of staff where possible. There will be no net loss of work within the municipality as services will transfer to alternate providers.


Human Rights Charter

It is hoped that with time the NDIS will increase its flexibility with regard to consumer choice and allow for participants to select their preferred provider within an open market.


Consultation and Communication

The loss of NDIS work constitutes a significant change to work as defined by Council’s Enterprise Agreement. The following consultation activities have been held or are planned:


[Back to List]

7. Armstrong Creek – Early Acquisition of Land

Source:

Planning & Development - Urban Growth 892d

General Manager:

Peter Bettess

Index Reference:

Armstrong Creek Horseshoe Bend Precinct


K Alexander moved, P Dorling seconded -

That in accordance with Section 89 (2) (d) of the Local Government Act 1989, this contractual matter be considered at the conclusion of all other business at which time the meeting be closed to members of the public.

Carried.

[Back to List]

8. Appointment of Two External Members to the Audit Advisory Committee

Source:

Chief Executive Office - Corporate Internal Auditor

Chief Executive Officer:

Kelvin Spiller

Index Reference:

Audit - CG – Internal


K Alexander moved, P Dorling seconded -

That in accordance with Section 89 (2) (d) of the Local Government Act 1989, this contractual matter be considered at the conclusion of all other business at which time the meeting be closed to members of the public.

Carried.