Council Minutes - Section B: Reports - 28 February 2017

Contents | Previous Page: Section A - Procedural Matters | Next Page: Section C - Assembly of Councillors

Reports tabled at the Ordinary Meeting of Council on Tuesday date held at the Council Conference and Reception Centre in City Hall, 30 Gheringhap Street, Geelong.


  1. Amendment C341 – Vietnam Veterans Avenue of Honour and Memorial and Osborne Park Gates – Consideration of Panel Report and Adoption

  2. Karreenga Aboriginal Advisory Committee Appointments and Action Plan Update 2016

  3. Provision of Public Immunisation Services

  4. Sale of Land to Roman Catholic Trust – Peninsula Drive, Drysdale

  5. CEO Quarterly Headline Report (October – December 2016)

  6. Revocation of Flood Prone Area Designation of New Lots at Armstrong Waters, Stage 2

  7. Revocation of Flood Prone Area Designation of New Lots at Villawood, Stage 19

  8. Revocation of Flood Prone Area Designation of New Lots at Warralily, Stage 79

  9. Roslyn Road, Highton – Proposed Footpath Construction SRC346 – Declaration of Charge

  10. Council Meeting Schedule 2017

  11. Station Street, Drysdale – Road Construction Special Charge Scheme SRC349 – Declaration of Charge

  12. Sale of Land to VicRoads – 333A Torquay Road, Mount Duneed

  13. 2016-2017 December Financial Management Report and Mid-Year Budget Update


1. Amendment C341 – Vietnam Veterans Avenue of Honour and Memorial and Osborne Park Gates – Consideration of Panel Report and Adoption

Source:

Planning & Development – Strategic Implementation

Acting General Manager:

Tim Hellsten

Index Reference:

Amendment C341


Purpose

To adopt Greater Geelong Planning Scheme Amendment C341.


Background

Amendment C341, as exhibited, proposes a Heritage Overlay over:

The Amendment was exhibited between 24 March and 26 April 2016. Seven submissions were received, including one objection. A Panel Hearing was held on 31 October 2016. The Panel Report was received on 2 December 2016.


Key Issues

P Dorling moved, L Gardner seconded -

That Council:

  1. adopts Amendment C341 in the form outlined in Appendix 3 of this report;

  2. submits the adopted Amendment together with the prescribed information to the Minister for Planning requesting approval.

Carried.


Attachment 1

Discussion

Exhibition and Submissions

The location of the exhibited Heritage Overlay is shown at Appendix 1. The exhibited Heritage Overlay is shown at Appendix 2.

Seven submissions were received on the Amendment: one objected, three expressed support, two provided comment and a submission from VicRoads providing conditional support was subsequently withdrawn.

The objecting submission, lodged on behalf of the owner of 265-285 Melbourne Road, objected for the following reasons:

The objecting and two other submissions questioned the association between the Avenue of Honour and Memorial and the Osborne Park gates; submissions from the National Trust of Australia (Victoria) and the Osborne Park Association suggested separating the gates on the Schedule to the Heritage Overlay.

On 5 September 2016, Council resolved under delegated authority to refer submissions to a Panel. In that report, Council supported a separate Heritage Overlay for the Osborne Park gates.

Panel Hearing and Panel Report

At the Panel Hearing, Council officers expressed support for the Amendment, subject to the following changes:

Revised separate heritage citations for the Avenue of Honour and Memorial and the Osborne Park gates were prepared and submitted to the Panel at the Hearing.

The Panel Report concluded:

Officer response:

The Panel’s conclusions and recommendations are supported. The Amendment should be adopted, subject to the changes recommended by the Panel, with one minor qualification, as follows.

With respect to the construction materials of the gates, further evidence has come to light that the gates incorporate both cast and wrought iron. This has been discussed with the National Trust of Australia (Victoria), Geelong branch representative who raised the issue at the Panel Hearing, and they support referring to both cast and wrought iron on the Schedule to the Heritage Overlay.

Appendix 3 sets out the recommended form of the Amendment to be adopted. These Amendment documents incorporate the changes recommended by the Panel, except for referring to both cast and wrought iron as outlined above. The documents include changes to the exhibited Heritage Overlay boundary, changes to the Schedule to the Heritage Overlay and a change to Clause 22.09 (Cultural Heritage) of the Scheme.

Revised heritage citations for the Vietnam Veterans Avenue of Honour and Memorial and for the Osborne Park gates are at Appendix 4 and Appendix 5 respectively.


Financial Implications

It is not anticipated that the Amendment will result in any financial implications for Council.


Stakeholder Consultation and Communication

The Amendment was exhibited in accordance with the provisions of the Planning and Environment Act 1987 to provide for full public comment. Immediately surrounding landowners and occupiers, government and service authorities and the North Geelong Cricket Club and North Geelong Football Club were notified and invited to comment.

A meeting was held on 31 May 2016 between the objector, the City and the Vietnam Veterans to discuss issues raised in the objecting submission. The objection was not withdrawn.

The Independent Panel report has been publicly released with a copy made available to submitters.


Policy/Legal/Statutory Implications

The Amendment is consistent with the State Planning Policy Framework at Clause 15.03-1 (Heritage conservation) of the Greater Geelong Planning Scheme. The Amendment is consistent with the Local Planning Policy Framework at Clause 21.06-5 (Heritage and identity) and Clause 22.09 (Cultural Heritage) of the Scheme.


Alignment to City Plan

The Amendment is consistent with the strategic direction of Community Wellbeing and the priority of connected, creative and strong communities.


Conflict of Interest

No Council Officers have any direct or indirect interest, in accordance with Section 80C of the Local Government Act.


Risk Assessment

There are minimal risks associated with implementing the recommendation contained in this report.


Environmental Implications

The proposed Heritage Overlay provides stronger protection for the trees within the Avenue of Honour.


Appendix 1

Location Plan – Proposed Heritage Overlay, Vietnam Veterans Avenue of Honour and Memorial and Osborne Park Gates

Location Plan – Proposed Heritage Overlay, Vietnam Veterans Avenue of Honour and Memorial and Osborne Park Gates

Appendix 2

Exhibited Heritage Overlay Map

Exhibited Heritage Overlay Map

Appendix 3

Amendment C341 to be adopted

Planning and Environment Act 1987

GREATER GEELONG PLANNING SCHEME

AMENDMENT C341

INSTRUCTION SHEET

The planning authority for this amendment is Greater Geelong Planning Scheme

The Greater Geelong Planning Scheme is amended as follows:


Planning Scheme Maps

The Planning Scheme Maps are amended by a total of 1 attached map sheet.

Overlay Maps

  1. Amend Planning Scheme Map Nos. 33ho and 37ho in the manner shown on the 1 attached map marked “Greater Geelong Planning Scheme, Amendment C341”.


Planning Scheme Ordinance

The Planning Scheme Ordinance is amended as follows:

  1. In Local Planning Policy Framework – replace Clause 22.09 with a new Clause 22.09 in the form of the attached document.

  2. In Overlays – Clause 43.01, replace the Schedule with a new Schedule in the form of the attached document.

End of document


Amendment C341 - Cultural Heritage Overlay

Amendment C341 - Cultural Heritage - Clause 22.09 - Page 1 of 4

Amendment C341 - Cultural Heritage - Clause 22.09 - Page 2 of 4

Amendment C341 - Cultural Heritage - Clause 22.09 - Page 3 of 4

Amendment C341 - Cultural Heritage - Clause 22.09 - Page 4 of 4
Amendment C341 - Heritage Overlay Schedule - Page 1 of 181

Amendment C341 - Heritage Overlay Schedule - Page 86 of 181

Appendix 4 - Revised Heritage Citation – Vietnam Veterans Avenue of Honour and Memorial

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 1 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 2 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 3 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 4 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 5 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 6 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 7 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 8 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 9 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 10 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 11 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 12 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 13 of 14

Revised Heritage Citation – Vietnam Veterans  Avenue of Honour and Memorial - Page 14 of 14

Appendix 5 - Revised Heritage Citation – Osborne Park gates

Revised Heritage Citation – Osborne Park gates - Page 1 of 8

Revised Heritage Citation – Osborne Park gates - Page 2 of 8

Revised Heritage Citation – Osborne Park gates - Page 3 of 8

Revised Heritage Citation – Osborne Park gates - Page 4 of 8

Revised Heritage Citation – Osborne Park gates - Page 5 of 8

Revised Heritage Citation – Osborne Park gates - Page 6 of 8

Revised Heritage Citation – Osborne Park gates - Page 7 of 8

Revised Heritage Citation – Osborne Park gates - Page 8 of 8

[Back to List]

2. Karreenga Aboriginal Advisory Committee Appointments and Action Plan Update 2016

Source:

Community Life – Community Development

General Manager:

Linda Quinn

Index Reference:

Subject: Australian Aboriginal and Indigenous Matters


Purpose

To adopt revised Terms of Reference for the Karreenga Aboriginal Advisory Committee, endorse Advisory Committee nominees and provide an update on Karreenga Aboriginal Action Plan implementation.


Background

Council adopted the Karreenga Aboriginal Action Plan 2014–2017 (Plan) on 27 May 2014. A key action of the plan was the setting up of an Aboriginal Advisory Committee. Terms of Reference were developed and provided to Council in a report 20 October 2015. The Terms of Reference have subsequently been revised based on consultation with Committee nominees.

The Annual Update of the Karreenga Aboriginal Action Plan provides key actions and achievements up to December 2016.

The City of Greater Geelong has committed to ensuring effective implementation of the Karreenga Aboriginal Action Plan through collaboration, communication and positive relationships.


Key Issues

P Dorling moved, L Gardner seconded -

That Council:

  1. adopts the revised Terms of Reference (Attachment 2);

  2. appoints nominees to Karreenga Aboriginal Advisory Committee and recruit two Aboriginal young people to join the Committee;

  3. congratulates appointees to the Advisory Committee (Attachment 3);

  4. notes the annual update to December 2016 of the Karreenga Aboriginal Action Plan 2014–2017 (Attachment 4); and

  5. supports the recruitment of an Aboriginal Policy and Liaison Adviser.

Carried.


Attachment 1

Discussion

Council adopted the Karreenga Aboriginal Action Plan 2014-2017 (the Plan) in May 2014. A further report detailing outcomes achieved during the first 12 months of the Plan implementation was tabled in May 2015.

A key action of the Plan is the establishment of the Karreenga Aboriginal Advisory Committee (Committee) which sits under Action 1, Cultural Recognition and Respect.

Discussions have been held with Aboriginal organisations, individuals and community groups to agree the composition of the Committee and to develop the revised Terms of Reference (see Attachment 2).

Council advertised for expressions of interest for membership of the Committee and received 10 nominations. The appointment of the Committee was delayed due to dismissal of Council by the State Government and an internal review of Council Committees.

Nominations for the Committee are noted in Attachment 3. The composition of the Committee is comprised of:

Ex-officio members of the Committee are Manager Community Development or delegate and Community Development Officer (both ex-officio, non-voting).

A Co-Chair of the Advisory Committee will be elected from the Karreenga Aboriginal Action Plan Statement of Intent partners. This position will be rotated on an annual basis.

The term of appointment for membership / representation of the Karreenga Aboriginal Advisory Committee is a minimum of one year or until members no longer hold the position on which their membership is based.

Should a vacancy arise during the term of office, Council has the right to choose the new member.

An initial meeting of Committee nominees was held at Wathaurong Aboriginal Co-operative in December 2016. It was agreed to review the Terms of Reference for the Committee in respect to participation of Aboriginal people, governance and membership. The revised Terms of Reference include changes to the membership with two additional places for Aboriginal young people.

Committee members are committed to effective communication, consultation, information sharing and two-way feedback. Actions and deliberations of the Advisory Committee will be shared with their relevant organisations and identified priorities will be brought to the attention of the Advisory Committee, which will meet twice a year.

The 2016 annual update of the Plan is included in Attachment 4.


Financial Implications

Council has committed $25,000 in the annual budget to support implementation of the Karreenga Aboriginal Action Plan 2014–2017.


Stakeholder Consultation and Communication

The Plan was developed with extensive community consultation and engagement. The Plan contains a ‘Statement of Intent’ for Council to continuously work with the local Aboriginal community, Wathaurung Aboriginal Corporation and Wathaurong Aboriginal Co-operative to achieve the objectives of the Plan. This Statement was signed by all parties.

The Committee is a key mechanism to ensure stakeholder engagement, consultation and communication.

An annual report on the achievements of the Plan is attached to this report and will be communicated to the community (Attachment 4).


Policy/Legal/Statutory Implications

The Aboriginal Heritage Act 2006 is the Victorian Government's legislation for protecting Aboriginal cultural heritage.

Council has an obligation to comply with the Act including consulting with Wathaurung Aboriginal Corporation as the Registered Aboriginal Party for the Geelong region on Aboriginal cultural heritage matters.

At the State Government level the objectives of Council under the Local Government Act 1989 are to improve the overall quality of life of people, including provisions with respect to equal employment opportunity.

The Plan is aligned in the local context to the Geelong Public Health and Wellbeing Plan 2013–2017.

A key goal of the Local Government Reform Agenda 2015 is to implement an Aboriginal Local Government Action Plan. The Plan demonstrates contemporary practice in engagement with the Aboriginal community and supports the State’s reform agenda.


Alignment to City Plan

The Plan aligns with Council’s City Plan 2013–2017 under Strategic Directions, Community Wellbeing. A key priority is: Lead by Advocating and Collaborating on Issues Important to the Greater Geelong Community.


Conflict of Interest

No conflict of interest is identified.


Risk Assessment

The Plan outlines shared directions and priorities for the future. Any future opportunities will be subject to Council reports following consideration and research of funding and partnership opportunities.

The Committee will operate under Terms of Reference in accordance with policy.


Environmental Implications

The City of Greater Geelong is required to ensure that all land use development complies with requirements of the Aboriginal Heritage Act 2006.


[Back to List]

3. Provision of Public Immunisation Services

Source:

Community Life - Family Services

General Manager:

Linda Quinn

Index Reference:

Subject: Immunisation


Purpose

To seek Council approval for the appointment of a service provider for the provision of immunisation services for up to five years (three years plus one year plus one year).


Background

Under the provisions of the Victorian Public Health and Wellbeing Act 2008, Council is required to co-ordinate and provide immunisation services to children living or being educated within the municipality.


Key Issues

K Alexander moved, L Gardner seconded -

That Council:

  1. award the contract to Barwon Health for Tender T1600057 – Provision of Immunisation Services. The approval is for the original term of three years, plus two additional one year options to extend;

  2. approve the maximum fixed lump sum amount of $2,114,760.76 (excluding GST) plus the additional cost of any associated schedule of rates expenses for the full 5 year contract term;

  3. authorise the Chief Executive Officer to sign the contract documents; and

  4. authorise the General Manager, Community Life to execute the options to extend subject to budget and successful delivery of the service.

Carried.


Attachment 1

Discussion

The immunisation service is delivered within a complex funding model.

The Federal Government payment of $6 per infant encounter is made monthly dependant upon a complete series of the scheduled program of immunisation being administered by City of Greater Geelong. For example, if a child receives the first two triple antigen immunisations, but has the final immunisation in the series completed with a GP, then the GP would receive the payment. This makes immunisation income predictions from the Federal Government difficult to estimate.

State Government funding of $8.50 per infant and secondary school student encounter is paid annually, and is based on the previous calendar year encounters, which does not reflect the actual number of immunisations delivered in that year.

The previous tender arrangement successfully met community needs and this was evidenced through monthly feedback from community members. Council advertised a new tender process on Saturday 30 July 2016. One tender submission was received from Barwon Health for this service. The tender submission satisfied the mandatory requirements and was deemed conforming.

The evaluation panel members undertook the necessary due diligence to ensure the tender bid satisfied the requirements of the project specification. The evaluation panel completed a thorough assessment of the tender, which was assessed against pre-determined non-price criteria. Pricing clarifications were sought and the panel were satisfied that value for money would be achieved through this tender.

In confirming that the proposed contract provides good value, a benchmark process was conducted. Two Councils with similar 0-18 year old populations, one delivering in-house services and one contracting out have comparable per encounter costs to City of Greater Geelong:

Council
# = contracted
* = in-house

0-18 year population

% of immunisations delivered by Council

Total number of immunisations for 0-18 year olds

Total cost

Cost per encounter

CoGG #

53,100

40%

21,240

$550,552

$25.90

Council 1 #

47,497

29%

13,774

$384,378

$27.90

Council 2 *

51,214

40%

20,486

$497,012

$24.26


The Council most comparable with City of Greater Geelong delivers cost per encounter of $24.26. Based on available data, the cost per encounter of $25.90 provided through the tender received from Barwon Health is comparable to similar contracted and in-house services.


Financial Implications

This is an annual lump sum and schedule of rates contract and will rely upon the funds allocated in Council’s recurrent budget (Budget Code R54445). Future business cases will need to be submitted on an annual basis to meet the ongoing commitment to provision of the service. The fixed price component for this service is as follows:

Original Contract term (3 Years)

$1,196,169.54

Option 1 (1 Year)

$448,333.34

Option 2 (1 Year)

$470,257.88

Total

$2,114,760.76


The estimated per encounter cost is $638,000 over the 5 year period. This figure is dependent upon the actual number of encounters delivered.

Income is reliant on Federal and State Government funding and is impacted either positively or negatively by changes to the National Immunisation Schedule. There have been frequent changes to the Schedule over recent years with vaccines added and others removed. These changes impact on assumptions made during the annual budget preparations for both income and expenditure.

The following table outlines the cost of the service to Council over the past 5 years:

Year

Income

Expenditure

Total expenditure

Cost to Council

Contractor payments

Other costs

2011/12

$169,966

$414,188

$10,459

$424,647

$254,681

2012/13

$165,683

$464,204

$8,365

$472,569

$306,886

2013/14

$201,536

$459,558

$5,801

$465,359

$263,823

2014/15

$221,963

$476,762

$6,735

$483,497

$261,534

2015/16

$264,146

$497,745

$14,925

$512,670

$248, 524


Contractor payments include lump sum plus encounters. Other costs include percentage of Community Child Health coordinator’s salary.

The current 2016/17 approved budget, including contractor payments of $487,733 is a net cost to Council of $307,976.


Stakeholder Consultation and Communication

Customer feedback from families who access the immunisation service provided through Barwon Health is consistently positive and reflects a high standard of customer service. No formal consultation process was undertaken.


Policy/Legal/Statutory Implications

The requirements of Section 186 of the Local Government Act 1989 have been complied with in relation to this tender.

The Public Health and Well Being Act 2008 Section 24 states:

The function of a Council under this Act is to seek to protect, improve and promote public health and wellbeing within the municipal district by:

  1. co-ordinating and providing immunisation services to children living or being educated within the municipal district.

There are no other policies, legal or statutory implications associated with this tender process.


Alignment to City Plan

Aligns with Community Well Being strategic direction to enhance health by providing a service that leads to a reduced incidence of vaccine preventable diseases.


Conflict of Interest

No officers or contractors involved in the preparation of this report have a direct or indirect interest in matters to which this report relates.


Risk Assessment

There are not considered to be any risks associated with the acceptance of this tender that cannot be managed through the contract conditions.


Environmental Implications

There are no known environmental implications.


[Back to List]

4. Sale of Land to Roman Catholic Trust – Peninsula Drive, Drysdale

Source:

Strategy & Performancec- Property & Procurement

Acting General Manager:

Louise Hill

Index Reference:

Property Land Sale


Purpose

To recommend that Council sell 2.67ha of land at Peninsula Drive, Drysdale to the Roman Catholic Trust for the expansion of St Ignatius Secondary College.


Background

Council is the owner of approximately 45ha of undeveloped vacant land in the vicinity of Grubb Road and Peninsula Drive, Drysdale which was part of a larger parcel of land purchased by the former Shire of Bellarine for urban development purposes. Much of the land located to the west of Peninsula Drive is now intended to be used for sports and recreation purposes, and some is leased to the Department of Education and Training and is used in conjunction with the Bellarine Secondary College.


Key Issues

L Gardner moved, P Dorling seconded -

That Council rescinds Council’s previous resolution of 28 July 2015:

“directs Officers to abandon the sale of land at 29-39 Peninsula Drive Drysdale…”.

Carried.


L Gardner moved, P Dorling seconded -

That Council:

  1. commences the procedures to sell land of 2.67ha (subject to survey) located at 29-39 Peninsula Drive, Drysdale (“the Land”) to the Roman Catholic Trust Corporation on the following terms:

    1. the price being not less than the Council’s valuation;

    2. the purchaser will meet all Council’s reasonable costs including any costs associated with subdivision of the Land;

    3. settlement to occur upon registration of a plan of subdivision of the Land;

    4. other appropriate terms and conditions;

  2. commences the procedures under section 189 of the Local Government Act 1989 (“the Act”) to sell “the Land”. That public notice and the right of a person, under section 223 of the Act, to make a submission in relation to the proposed sale be given in the Geelong Advertiser and Geelong Independent;

  3. states in the public notice the day, time and place for the hearing of submissions;

  4. appoints the Submissions Review Panel to hear and report to Council on any submissions in relation to the proposed sale;

  5. in the event that no submissions are received sell the Land to the Roman Catholic Trust Corporation; and

  6. authorise the Chief Executive Officer to execute the Contract of Sale.

Carried.


Attachment 1

Discussion

Approximately 16 years ago parts of the larger parcel of Council owned land in this location were sold to the Roman Catholic Trust Corporation and Department of Education and Training for the 3 schools currently located on Peninsula Drive (refer to Attachment 2).

Council’s multi arts facility, the Potato Shed, is located on a 5.010ha Reserve on the eastern side of Peninsula Drive between the schools and includes a bus interchange and car park.

Council’s land is zoned Special Uses Zone 13 being a zone that allows for a range of civic, community, education and recreation activities. This zone was introduced in 2011 under amendment C194 to the Planning Scheme. Previously the land was more widely zoned for general urban development including residential development, and while the current zone considerably restricts permitted uses it continues to recognize educational use.

The sale of the land to the Archdiocese was the subject of two Council reports in 2015 and again in January 2016:

The Archdiocese in May 2016 again wrote to Council seeking to purchase approximately 2.7ha of land at Peninsula Drive.

St Ignatius College plans to expand its campus at this location to provide more general purpose and specialist learning rooms, and sport and physical education areas. Student numbers have doubled since 2007 and the College requires additional land as its current site is fully developed.

Much of the College’s building stock consists of re-locatable buildings and additional land will allow permanent classrooms to be built without the prior demolition of the re-locatable classrooms they are intended to replace.

The College has received in principle agreement for a $2m Federal Government Capital Grant to support the construction of a new year 9 centre and needs to confirm a site and commence construction.

Council’s intentions for its vacant land at Peninsula Drive have in recent years been expressed in 2 strategic plans.

In 2011 Council adopted the Drysdale Clifton Springs Sports master plan which establishes a concept plan for the use of the vacant Council land to the west of Peninsula Drive for a series of sports grounds and Council uses (Attachment 3).

The Potato Shed has a master plan that shows future expansion of the facility including additional theatre space, music labs, recording space, exhibition space and general purpose areas (Attachment 4). A review has recently been completed of the master plan which has identified that the land subject being the subject of this report is surplus to the future needs of the Potato Shed. Future detailed design of further expansion of the Potato Shed will need to ensure that appropriate access is provided loading and unloading of trucks.

The land proposed to be sold is not required for Council’s community infrastructure requirements, and other sites locations within Drysdale have been identified for these purposes. These sites include 5,020m2 of vacant Council owned land in Palmerston Street and other Council owned sites near to the town centre.

Council land is the preferred location for the expansion of Saint Ignatius College. The alternative for the school to purchase land to the east of Gillies Road has been investigated and ruled out due to land contamination and complications with Gillies Road running through an expanded campus.


Financial Implications

A certified valuation of $740,000 plus GST dated June 2016 has been obtained which was agreed by the purchaser. Due to the requirements of the Local Government Act 1989 (“LG Act”) a new valuation will be obtained and the price of the land will be not less than the new valuation.

Advice has been received from Council’s engineering consultant that costs of approximately $55,000 will be incurred in subdividing the land. Those costs, in addition to any survey and Council valuation costs, will be met by the purchaser.


Stakeholder Consultation and Communication

The relevant internal departments have been consulted in the preparation of this report. Public submissions on the proposed sale will be invited as described below.


Policy/Legal/Statutory Implications

The Local Government Best Practice Guideline for the Sale and Exchange of Land recommends that where ever possible land be sold by a public process such as auction or listing. In this case a direct sale to the Roman Catholic Trust is recommended to assist with its expansion plans.

Section 189 of the LG Act requires that Council obtain a certified valuation dated not more than six months prior to the sale of the land being the date of the contract of sale. The price for the land will be not less than Council’s valuation.

Under the same section of the LG Act the Council is required to give public notice of its intention to sell the land and consider any submissions received. If any submissions are received they will be heard by the Submissions Review Panel followed by a report to Council. If no submissions are received the land will be sold to the Roman Catholic Trust.

In anticipation of submissions, the public notice will specify the day, time and place for the hearing of submissions.

Following the Council resolution of April 2015 to exchange land, notice of intention to sell the Peninsula Drive land was published and 38 submissions were received. Due to the lapse of time and absence of the possible purchase of land in St Leonards, it is recommended that a new notice of intention to sell land be given.


Alignment to City Plan

The sale of the land will support the opportunities for education aims of the City Plan Priority: Connected, Creative and Strong Communities.


Conflict of Interest

No officers or contractors involved in the preparation of this report have a direct or indirect interest in the matters to which this report relates.


Attachment 2

Aerial View of Schools and Council Land in Peninsula Drive Drysdale

Aerial View of Schools and Council Land in Peninsula Drive Drysdale

Attachment 3

Drysdale Clifton Springs Sports Masterplan

Drysdale Clifton Springs Sports Masterplan

Attachment 4

Potato Shed Masterplan

Potato Shed Masterplan
[Back to List]

5. CEO Quarterly Headline Report (October - December 2016)

Source:

Strategy& Performance - Strategy & Program Delivery
Acting General Manager: Louise Hill
Index Reference: Corporate Strategy

Purpose

To provide the community with an update on engagement activities and delivering key projects.


Background

The CEO Quarterly Headline Report has been developed to meet with our commitment to be transparent in performance reporting, including progress updates on 2016 – 2017 City Plan actions for the quarter.


Key Issues

There are 195 actions Council has committed to in the 2016-2017 City Plan there are no actions with ‘Major’ issues, however six actions have ‘Not Started’ for various reasons (refer to Attachment 1, page 15).

A comprehensive report on the status of all actions is attached (Attachment 2).

The City has begun transitioning to the new Our Future framework by reporting against the successful elements of a community as described in the Our Future strategic vision.

P Dorling moved, L Gardner seconded -

That Council receives the CEO Quarterly Headline Report noting the results and commentary.

Carried.


Attachments

Attachment 1: CEO Quarterly Headline Report

Attachment 2: City Plan Quarterly Progress Report - October to December 2016


Attachment 1

CEO QUARTERLY HEADLINE REPORT (OCTOBER – DECEMBER 2016)

Priority: An Informed and Engaged Community

2016-2017 Community Engagement Dashboard

87

12,347

Number of known engagements YTD

Number of known participants YTD

Number new engagement activities (displayed in a bar graph) Engagement techniques YTD (displayed in a pie chart)
Top Pages By Visitors - Have Your Say (displayed in a bar graph)

Engagement Techniques:

Our Future project accelerated during the quarter resulting in survey techniques growing to 69%.

Insights:

For the quarter there were 5,426 page visits with the Have Your Say page attracting 1,273 visits. The main engagements for the months of October through to December were Avalon Corridor Strategy, Highton Village Urban Design Framework and the upgrades of the local and district playgrounds.


Community Engagement Activities commenced Oct-Dec 2016:

Project

Technique

Comments

EVENTS FEEDBACK:

  • Geelong Seniors Festival survey 2016

  • Pivot Connect Feedback Survey

Survey

Results pending.

EVENTS FEEDBACK:

  • Leisure Services Department Planning Day - Feedback survey

  • Geelong's BIG Play Day - 25 October 2016

  • CDD Quarterly - 6 October 2016

  • Toast to the Coast 2016

  • Central Geelong Sidewalk Sales 2016 Survey

  • Christmas in Central Geelong 2016 - Business Survey

  • Sidewalk Sales 2016 Business Survey

  • Word for Word - Non-fiction Festival 2016

  • Geelong Revival Motoring Festival 2016

  • Light Up Geelong

  • JCG/SLT Monthly Leadership Team meetings- 24th November

  • SLT/ ELT Monthly Meeting 14th December 2016

Survey

Feedback from attendees of events will be used to inform the development of future events.

I could get a job if....

Survey

Results pending.

Gov4Business

Event

Results pending.

Highton Village Urban Design Framework

Event

A total of 140 attended community sessions that will be used to inform the development of the Highton Village Urban Design Framework (UDF). A 55 page findings report was publicly released.

Our Future

Survey, Event, Comments

Engagement ongoing.

Geelong Children’s Week October 2016 - Evaluation surveys

Survey

Surveys of organisations participating in Children's week are required as part of funding conditions.

Draft Greenhouse Strategy 2016

Comments

Results pending.

Project

Technique

Comments

Avalon Corridor Strategy

Survey, Event

Approximately 100 survey responses were received and 250 people attended drop in sessions in November. Further opportunities for community engagement are planned for January/February 2017.

The Laneways project feedback

Comments

Results pending.

Rosewall Community Hub development

Event

Results pending.

Rethink Your Rubbish - Green Waste

Survey

817 surveys were completed. Results will be used to assist in the development of a campaign to improve the quality of green waste material.

Handle with Care

Survey

Results pending.

Bouncing Back

Survey

Results pending.

Gateway Sanctuary (Leopold) - Playground

Survey, Event

Results pending.

Local and district playgrounds upgrades

Survey

Feedback has been used to help determine playground designs as part of the 2016-2017 Playground Upgrade Program. Designs for the upgrade program have been selected.

Griggs Creek Restoration & Rehabilitation and Pedestrian Bridge Crossing

Comments

Results pending.

Road Renaming - Western Section Currango Way, Ocean Grove

Comments

Results pending.

Leopold Community Hub - Stage 2 Design

Event

Results pending.

Onboarding survey

Survey

Engagement ongoing.


Priority: An Informed & Engaged Community

News Coverage header image
Breakdown of media coverage (as a line graph) Public relations (PR) value ($M)(as a line graph)

Media coverage in December was 46% positive, 44% neutral and 10% negative. Positive coverage centred on Geelong’s family-oriented Christmas program, and activities at the National Wool Museum. The Floating Christmas Tree gained substantial favourable attention, as did the Our Future project. Negative media for December was centred on the future of the Geelong Saleyards.



Priority: Community Perspective on Geelong

Recent results collated in October from an annual survey(1) sent out mid last year by Tourism Greater Geelong & The Bellarine indicate that:

(1) Survey source - participants breakup – 47% Geelong locals and 53% non-locals.


Our Future Project – Status Report

Net Promoter Score(as a line graph)

As at 15 February 2017

9,396 People Engaged

Demographics of People

People engaged(as a line graph) Gender(as a pie chart)
Age breakdown(as a pie chart)
Connection with Geelong(as a pie chart)

 

107 Events

Conducted between September-15 February, 2017

Events (as a bar graph)

Engagement

 
Engagement (as a bar graph)


Priority: Efficient and Customer focused organisation

Transformation Program

As recommended by the Commission of Inquiry a major transformational program has been established by the Administrators for the City of Greater Geelong.

The transformation program, led by the City’s Executive Leadership Team, has been broken down into four main streams: - People and Leadership, Management, Relationships and Governance, incorporating 20 projects led by Senior leaders each with specific corporate initiatives.

The program is to implement a thorough review of the organisation and its management, and a comprehensive review of all Council policies, systems, processes and operations to ensure they meet contemporary governance standards.

The transformation program provides a roadmap on how we will achieve:

A few highlights this quarter:

People & Leadership

New purpose and values

The City has adopted new values and purpose statement after a comprehensive six month consultation period with its staff. During the consultation period, the organisation actively engaged with 350 staff, listened to the views of hundreds more people through internal communication channels with over 1,200 people voting on the new values and purpose statement. To assist with the implementation, a People Leaders Toolkit has been developed with input from 100 staff to build awareness and understanding of the City of Greater Geelong’s values. The toolkit provides People Leaders practical ways to facilitate team based values conversations. A series of interactive workshops have also been designed to support and develop People Leaders capability in using the resource.

Exit Interview process

A new quarterly departures report has been created to provide further insights for identifying trends or risk areas for potential interventions.  The report provides turnover rates at the organisational level, rate of departure based on division, age, gender, and employment status. The report includes an analysis of the feedback from exit surveys and provides insight into why employees leave and feedback on our culture.  

Governance

Legal Services & Governance

A centralised Legal Services and Governance department has been established to help strengthen the organisations governance requirements. A role of Senior Manager Legal Services and Governance was created to lead compliance, legal, governance and audit functions, including Council business and Councillor support. This will ensure we meet statutory obligations and provide essential accurate and timely legal advice to the organisation.


Governance

Complaint Review Panel

The Susan Halliday Report as part of the Commission of Inquiry recommended that an independent panel be established to deal with unresolved historic complaints of bullying. Twelve months on, the Complaints Review Panel has heard 63 items, 73 per cent are closed, 5 per cent involve live investigations and 22 per cent are undergoing file reviews, desk audits, workplace interventions, team welfare checks, mediations, additional training, and formal performance and behavioural improvement plans.

Return of Council

To create the right environment for the return of an elected council, a detailed plan is being developed to ensure the organisation, candidates and community will be fully informed and aware of all the new rules about the role/responsibilities of a mayor and councillors.

Development of transition plan for return of elected Council has five steps identified:

  1. Raising awareness

  2. Priming (citizen to councillor campaign)

  3. Nomination

  4. Post election induction

  5. Ongoing professional development.

Relationships

Community Update

The reintroduction of Community Update is an opportunity to send updates and news on important City projects and developments to every household in Greater Geelong. This provides a far greater reach for our stories that might not reach the many residents who don’t access local media outlets. The October edition (8 pages) consisted of 32 articles/updates plus 28 events listing; December’s edition (12 pages) consisted of 42 articles/updates and 42 events listings.

Community Update’s reintroduction is a direct result from feedback collected in the 2016 Local Government Community Satisfaction Survey and our Community Engagement CATI Survey.

Results from the 2016 Local Government Community Satisfaction Survey identified:

Management

Process Reviews

Budget

The budget for the 2017-2018 budget has been reviewed; as part of the 2017-2018 budget process a new single grant scheme has been introduced to streamline the process and ensures that all potential funding applications are assessed against the organisations objectives. The scheme will replace the former community budget submissions process.

Financial

Ernst & Young strategic financial review has been completed with implementations already underway. Work has begun on improving reports, management of debt, asset planning, financial cultural discipline and to use VAGO indicators for monitoring overall financial performance.

Information and Communications Technology (ICT)

The review by Deloitte of ICT found significant under-investment and the need for a more strategic approach, including the development of an ICT strategy. The recommendations (12) have been mapped and costed over a two year period. Other non-fiscal recommendations are currently being reviewed by management to inform short and medium term actions.

Asset Management

Sound management of the City’s property portfolio requires periodic reviews to ensure that the properties owned are properties used and maintained, and any surplus properties are disposed of.  As part of the 2017-2018 budget process we are currently identifying properties for possible sale.

Civic Accommodation

Currie and Brown, consultants were appointed to review the City’s accommodation strategy, have completed their report which assesses the financial and non-financial aspects of our accommodation options including continuing to lease, build on a Council owned site or lease a purpose built building from a developer.

The City is working with the Administrators and the Geelong Authority to set up the project and achieve some key milestones over the coming months including more detailed designs and costings, reconciling other uses proposed for the site and preparing financial projections.

Upcoming Reviews

Planning & Development

The City is looking at undertaking a number of critical reviews to processes and systems over the coming months to improve planning permit application assessment times and provide critical information required by stakeholders involved in the development approvals process. These projects include a detailed review of application referral processes, undertaking a customer satisfaction survey, reviewing standard letters and updating web site information.

Priority: To Lead By Advocating and Collaborating On Issues Important to the Geelong Community

Partnerships and Networks Model

The City has been partnering with other organisations during the quarter to achieve the best outcome for the region: -

Priority: Minimising our Environmental Footprint

Greenhouse Strategy

The Greenhouse Strategy has been developed to reflect the City’s certification as a One Planet Living Council and to be aligned with the One Planet Living principle: Zero Carbon.

Input for the Greenhouse Strategy was sought from the community and council via formation of Project Steering and Advisory Groups, workshops, presentations, interviews and surveys. The draft strategy was displayed on public exhibition for a four week period in late 2016 enabling the broader community the opportunity to assess the strategy and provide comments.

The Greenhouse Strategy incorporates the following targets to achieve emissions reduction from Council’s buildings and vehicle fleet from 2014-2015 levels:

Key action areas that support the targets include; energy efficiency (electricity and gas) in buildings, renewable energy (small and large scale) and carbon offset purchasing. A significant solar program is in the design phase, 470kW of installed solar will be rolled out over seven council buildings in 2017. LED lighting upgrades and building management control systems will be upgraded at Leisurelink in April – May 2017. These projects will have significant emissions reduction outcomes.   

The City will play a key role in enabling positive change in the community. They will build on the opportunities identified in the Low Carbon Growth Plan and will collaborate with key stakeholders to develop a Zero Carbon Community Action Plan.

The final draft strategy is scheduled to be reviewed for endorsement at the March 2017 Council meeting.

Annual Emissions (tCO2-e) (as a bar graph)

To meet the 50% target council will purchase carbon offsets and invest in energy efficiency and renewable energy projects on council buildings.

Successful Community Outcomes

Successful community outcomes (as a flowchart)

CREATIVE:

The Geelong Botanic Gardens Education Program engages people of all ages in the fascinating world of plants. The program includes school holiday activities and educates school groups from Prep to University level. 1,586 students participated in the program during 2016. Stories about plants are shared through interpretive trails and free activities and gives thousands of garden visitors an opportunity to see plants differently.



SUSTAINABLE AND RESILIENT:

The City has successfully delivered a newly designed Environment and Sustainability Grants Program. The Environment and Sustainability Grants Program ensures that the City is able to facilitate and support a wide range of environment and sustainability actions across the municipality and build partnerships that work together for shared vision and goals for our future. 12 projects were awarded grants to support a diverse range of biodiversity and sustainability. Successful projects included Green Thinking and Solar project (Diversitat) and Laneway Learning program (Geelong Sustainability Group).

The update was a significant business improvement in delivery of the grants. Working together in partnership with the Community Grants team; the Environment and Sustainability Grants program was re-designed and delivered using the SmartyGrants software platform. This ensured a high level of rigour to the process from the public advertising of grants, through assessment against strategic criteria, record keeping and administration.



DESIGNED FOR PEOPLE:

The Green Spine project will transform Malop Street into a vibrant street and linear park, connecting from Johnstone Park to Eastern Park. The project will deliver more trees and green spaces to the heart of the city, transforming it into an attractive and inviting place. The plan is based on a vision for the street as a ‘Botanic Walk’, with a continuous canopy of trees and a series of different alfresco, seating and gathering spaces along the length of Malop Street, linked by a network of paths. In addition to greening the street and making it more people friendly, the plan also makes the street safer, more accessible and user friendly for bikes.



City Plan 2013-2017 (16/17 Update)

Progress Report to 31 December 2016

Dashboard summary of progress to date of 2016-2017 City Plan actions

(Total 195 actions)

Dashboard summary showing completed, on schedule, not started, major issue, minor issue, and a breakdown of strategic direction by status (as a flowchart)

Successful Implementation/Completion of City Plan actions (Oct - Dec)

P Drysdale Sports Precinct – Stage one earthworks completed.

P Seniors Citizens Week was undertaken and well attended in October.

P St. Albans Electronic Scoreboard, Portarlington Tennis Club Sports lighting Corio Community Reserve open space improvements projects were all completed during the quarter.

P At Eastern Beach, the Fountain steps, Seabed hazard removal project, and the replacement of Heritage Fenceprojects were all completed.

P Compliance training (Prevention of Bullying and Harassment, Fraud Awareness, Equal Employment Opportunity, Positive Duty and Occupational Health and Safety) was reviewed, improved and relaunched to the organisation in December for all staff to undertake.


Projects Not Started

Scheduled for commencement

Project to be scheduled

Not Proceeding



[Back to List]

6. Revocation of Flood-prone Area Designation of New Lots at Armstrong Waters, Stage 2

Source:

City Services - Engineering Services

General Manager:

William Tieppo

Index Reference:

Flood and Drainage Management


Purpose

The purpose of this report is to revoke the designation of flood affected land within the stages of the development of Armstrong Waters, Stage 2.


Background

The current designated flood mapping (refer to Attachment 2) was designated by Council at its meeting of 12 December 2006, under the provisions of the Building Regulations 2006.

The subject of this report is the residential land at Armstrong Creek fronting 291 - 411 Charlemont Road, Armstrong Creek. Prior to subdivision the parent lot was used primarily as farmland.


Key Issues

L Gardner moved, P Dorling seconded -

That Council revoke the Council designation of 12 December 2006 of flood affected land Armstrong Waters, Stage 2 as liable to flooding pursuant to Regulation 802(2) of the Building Regulations 2006.

Carried.


Attachment 1

Discussion

Designation of land as liable to flooding under Regulation 802 of the Building Regulations 2006 enables the control of floor levels for acceptable building permit applications, or refusal of consent to building applications where there is likely to be a danger to life, health or safety due to flooding. Designation also enables disclosure of flood status within statutory information certificates such as the Land Information Certificate and Building Information Request Form.

Overland flows that may occur within the subdivision during the 100 year ARI flood event are now contained within road and drainage reserves in accordance with accepted best practice for development within flood-prone areas. Best practice requires that any overland flows within residential areas satisfy public safety criteria with respect to velocity and depth of flow.

Council has a statutory obligation under the Building Regulations 2006 to designate land as liable to flooding where it reasonably knows it to be prone to flooding. Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.


Financial Implications

No impact to budget.


Stakeholder Consultation and Communication

A revocation of designation does not warrant public consultation as it constitutes the removal of an encumbrance on land.

Relevant Council databases and flood maps will be revised and updates sent to the Corangamite Catchment Management Authority and Building Control Commission.


Policy/Legal/Statutory Implications

The City has various statutory responsibilities for drainage management and flood management (prevention, response and recovery) as set out in the Local Government Act 1989, Local Government Regulations 1990, Planning and Environment Act 1987, Building Regulations 2006, Water Act 1989, Subdivision Act 1988 and Emergency Management Act 1986.


Alignment to City Plan

The recommendations of this report are consistent with City Plan, in relation to Growing our Economy and promoting a sustainable built environment, sustainable land use and development.


Conflict of Interest

There are no officer direct or indirect interests with respect to this report.


Risk Assessment

Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study is a key step toward minimising Council’s exposure to these risks.


Environmental Implications

The revocation of flood-prone areas designation and designation of revised flood data does not result in any known adverse environmental impacts.


Attachment 2

CURRENT FLOOD MAP

Current Flood Map

Attachment 3

REVISED FLOOD MAP

Revised Flood Map
[Back to List]

7. Revocation of Flood-prone Area Designation of New Lots at Villawood, Stage 19

Source:

City Services - Engineering Services

General Manager:

William Tieppo

Index Reference:

Flood and Drainage Management


Purpose

The purpose of this report is to revoke the designation of flood affected land within the stages of the development of Villawood, Stage 19.


Background

The current designated flood mapping (refer to Attachment 2) was designated by Council at its meeting of 12 December 2006, under the provisions of the Building Regulations 2006.

The subject of this report is the residential land at Mount Duneed fronting 73 Airport Road, Mount Duneed. Prior to subdivision the parent lot was used primarily as farmland.


Key Issues

L Gardner moved, P Dorling seconded -

That Council revoke the Council designation of 12 December 2006 of flood affected land Villawood, Stage 19 as liable to flooding pursuant to Regulation 802(2) of the Building Regulations 2006.

Carried.


Attachment 1

Discussion

Designation of land as liable to flooding under Regulation 802 of the Building Regulations 2006 enables the control of floor levels for acceptable building permit applications, or refusal of consent to building applications where there is likely to be a danger to life, health or safety due to flooding. Designation also enables disclosure of flood status within statutory information certificates such as the Land Information Certificate and Building Information Request Form.

Overland flows that may occur within the subdivision during the 100 year ARI flood event are now contained within road and drainage reserves in accordance with accepted best practice for development within flood-prone areas. Best practice requires that any overland flows within residential areas satisfy public safety criteria with respect to velocity and depth of flow.

Council has a statutory obligation under the Building Regulations 2006 to designate land as liable to flooding where it reasonably knows it to be prone to flooding. Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.


Financial Implications

No impact to budget.


Stakeholder Consultation and Communication

A revocation of designation does not warrant public consultation as it constitutes the removal of an encumbrance on land.

Relevant Council databases and flood maps will be revised and updates sent to the Corangamite Catchment Management Authority and Building Control Commission.


Policy/Legal/Statutory Implications

The City has various statutory responsibilities for drainage management and flood management (prevention, response and recovery) as set out in the Local Government Act 1989, Local Government Regulations 1990, Planning and Environment Act 1987, Building Regulations 2006, Water Act 1989, Subdivision Act 1988 and Emergency Management Act 1986.


Alignment to City Plan

The recommendations of this report are consistent with City Plan, in relation to Growing our Economy and promoting a sustainable built environment, sustainable land use and development.


Conflict of Interest

There are no officer direct or indirect interests with respect to this report.


Risk Assessment

Council has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study is a key step toward minimising Council’s exposure to these risks.


Environmental Implications

The revocation of flood-prone areas designation and designation of revised flood data does not result in any known adverse environmental impacts.


Attachment 2

CURRENT FLOOD MAP

Current Flood Map

Attachment 3

REVISED FLOOD MAP

Revised Flood Map
[Back to List]

8. Revocation of Flood-Prone Area Designation of New Lots at Warralily, Stage 79

Source:

City Services - Engineering Services

General Manager:

William Tieppo

Index Reference:

Flood and Drainage Management


Purpose

The purpose of this report is to revoke the designation of flood affected land within the stages of the development of Warralily, Stage 79.


Background

The current designated flood mapping (refer to Attachment 2) was designated by Council at its meeting of 12 December 2006, under the provisions of the Building Regulations 2006.

The subject of this report is the residential land at Armstrong Creek fronting 568 - 612 Torquay Road, Armstrong Creek. Prior to subdivision the parent lot was used primarily as farmland.


Key Issues

L Gardner moved, P Dorling seconded -

That Council revoke the Council designation of 12 December 2006 of flood affected land Warralily, Stage 79 as liable to flooding pursuant to Regulation 802(2) of the Building Regulations 2006.

Carried.


Attachment 1

Attachment 2 shows the existing flood designation. Attachment 3 shows the change in flood mapping at 568 - 612 Torquay Road, Armstrong Creek after construction of the subdivision.


Discussion

Designation of land as liable to flooding under Regulation 802 of the Building Regulations 2006 enables the control of floor levels for acceptable building permit applications, or refusal of consent to building applications where there is likely to be a danger to life, health or safety due to flooding. Designation also enables disclosure of flood status within statutory information certificates such as the Land Information Certificate and Building Information Request Form.

Overland flows that may occur within the subdivision during the 100 year ARI flood event are now contained within road and drainage reserves in accordance with accepted best practice for development within flood-prone areas. Best practice requires that any overland flows within residential areas satisfy public safety criteria with respect to velocity and depth of flow.

Council has a statutory obligation under the Building Regulations 2006 to designate land as liable to flooding where it reasonably knows it to be prone to flooding. Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.


Financial Implications

No impact to budget.


Stakeholder Consultation and Communication

A revocation of designation does not warrant public consultation as it constitutes the removal of an encumbrance on land.

Relevant Council databases and flood maps will be revised and updates sent to the Corangamite Catchment Management Authority and Building Control Commission.


Policy/Legal/Statutory Implications

The City has various statutory responsibilities for drainage management and flood management (prevention, response and recovery) as set out in the Local Government Act 1989, Local Government Regulations 1990, Planning and Environment Act 1987, Building Regulations 2006, Water Act 1989, Subdivision Act 1988 and Emergency Management Act 1986.


Alignment to City Plan

The recommendations of this report are consistent with City Plan, in relation to Growing our Economy and promoting a sustainable built environment, sustainable land use and development.


Conflict of Interest

There are no officer direct or indirect interests with respect to this report.


Risk Assessment

Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

The designation of the flood data produced by the flood study is a key step toward minimising Council’s exposure to these risks.


Environmental Implications

The revocation of flood-prone areas designation and designation of revised flood data does not result in any known adverse environmental impacts.


Attachment 2

CURRENT FLOOD MAP

Current Flood Map

Attachment 3

REVISED FLOOD MAP

Current Flood Map
[Back to List]

9. Delegation to the CEO for the Construction of Drysdale Landfill Cell 5, The Central Geelong Revitalisation Works and the Construction of the Leopold Community Hub - Stage 2

Source:

City Services – Capital Projects

General Manager:

William Tieppo

Index Reference:

Council Reports 2017


Purpose

The purpose of this report is to seek Council consent to delegate to the Chief Executive Officer the power to accept or reject tenders for each of the Leopold Community Hub Stage 2; Drysdale Landfill Cell 5 and Central Geelong Revitalisation projects provided tenders fall within the adopted budget.


Background

Council has previously approved and funded the Leopold Community Hub Stage 2; Drysdale Landfill Cell 5 and Central Geelong Revitalisation projects.

When completed the Leopold Community Hub will expand upon the already significant range of children’s services on the site to include a community hub, senior and youth services and a library.

Drysdale Landfill Cell 5 must be constructed to ensure Council can continue to provide ongoing waste operations to the public. Cell 5 must be constructed and have it approved by the EPA prior to the presently active Cell 6 being filled.

The Central Geelong Revitalisation forms part of the Council adopted Central Geelong Action Plan. In July 2016 the State Government formed a Partnership to work with Council to coordinate and deliver the outcomes of the Revitalising Central Geelong Action Plan.

Due to the tight timelines associated with all three projects, the Capital Projects team are looking to award the construction contracts in the most efficient manner possible.

Tenders are currently progressing for all three projects.


Key Issues

L Gardner moved, P Dorling seconded -

That Council delegate to the Chief Executive Officer its powers and functions to accept or reject tenders and sign the contract documents for the construction and associated works of Leopold Community Hub – Stage 2; Drysdale Landfill Cell 5; and the Central Geelong Revitalisation works provided the tenders are within Council’s approved budget.

Carried.


[Back to List]

10. Roslyn Road, Highton - Propsed Footpath Construction - SRC 346 - Declaration of Charge

Source:

City Services – Engineering Services

General Manager:

William Tieppo

Index Reference:

Special Rates and Charges, Roslyn Road Highton


Purpose

This report seeks a resolution by Council to declare the charges for a Special Charge Scheme to partially fund the construction of a footpath along the south side of Roslyn Road, Highton between Scenic Drive and Remony Avenue. (See plan – Attachment 5).


Background

Existing footpaths are in place along the majority of Roslyn Road, Highton except for the south side of the road between Scenic Road and Remony Avenue. This road is busy, with over 9,000 vehicles per day using the road (traffic count data February 2014). Council’s planning scheme determines that roads of this nature require footpaths on both sides.

The results included three (3) yes votes for the proposed footpath, 14 no votes and one (1) property owner who remained non committal.

At its meeting of 15 March 2016, Council resolved its intention to declare the scheme and a panel hearing was held on 7 September 2016.


Key Issues

P Dorling moved, L Gardner seconded -

That Council:

Resolves to declare the Special Charge Scheme as follows:

  1. The Special Charge is declared for a period of five (5) years commencing upon completion of the works.

  2. The Special Charge be declared for the purpose of defraying any expenses incurred by Council in relation to the construction of the footpath on Roslyn Road between Scenic Road and Remony Avenue, Highton which:

    1. Will provide proper pedestrian access, improved pedestrian safety and enhancement to the general amenity for each of the properties included in the scheme;

    2. Council considers is or will be a special benefit to those persons required to pay the special charge (and who are described in succeeding parts of this Resolution); and

    3. Arises out of Council’s function of planning for and providing infrastructure for property owners.

  3. The total cost of project, be recorded as $268,714(Schedule A).

  4. It be recorded that, for the purposes of Section 163 (2A) of the Act, the special charge proceeds will not exceed the amount calculated in accordance with the prescribed formula (R x C = S), the:

    1. ‘benefit ratio’ (R) being calculated at 0.32 represents the special benefits to all persons liable to pay the special charge (Schedule B);

    2. ‘total cost’ (C) of performing the function described in part 1 (b) of this resolution based on estimated cost be recorded as $217,096; and

    3. ‘maximum levy’ (S) be recorded as $69,471.

  5. the following be specified as the area for which the special rate is so declared:

    1. the area within municipal district of Council highlighted in the plan attached to this Resolution (Attachment 5).

  6. the following be specified as the land in relation to which the special charge so declared:

    1. land within the area shown on the plan.

  7. the following be specified as the criteria which form the basis of the special charge so declared:

    1. ownership of any land described in Part 1(e) of this Resolution.

  8. the following be specified as the manner in which the special charge so declared will be assessed and levied:

    1. Each lot receives a primary access and amenity benefit;

    2. The maximum levy is divided on an access and frontage share (amenity) basis;

    3. The special charge will be levied by sending a notice to the person who is liable to pay, pursuant to section 163(4) of the Act.

  9. having regard to the preceding parts of this Resolution but subject to Section 166 (1) of the Act, it be recorded that;

    1. the owners of the land described in column 1 of Schedule C to the resolution are estimated liable for the respective amounts set out in column 8 of Schedule C; and

    2. such owners may, subject to any further resolution of Council pay the special charge in the following manner;

      1. the charge will become due and payable within one month of the issue of the notice requesting payment pursuant to Section 167 (3) of the Act;

      2. interest will not be charged for six months after the issue of the notice provided the person liable makes timely payment in accordance with any repayment arrangements that may be agreed on by Council; and

      3. in accordance with Section 172 of the Act, the interest rate payable on the special charge which has not been paid by the specific date is set at Council’s overdraft rate, reviewed every three months (provided that it shall not exceed the rate fixed by the Governor in Council by Order for the purposes of Section 172 (2A) in which case the rate of interest shall be the maximum rate fixed by the Governor in Council by Order for the purposes of this section).

  1. Authorise Council’s Chief Executive Officer to levy the Special Charge in accordance with Section 163 (4) of the Act.

Carried.


Attachment 1

Discussion

For the footpath section as proposed, there is evidence of pedestrian movements by the existence of a well used ‘goat track’ in the nature strip particularly between Remony Avenue and Thornhill Road. This ‘goat track’ becomes less obvious to the west of Thornhill Road due to the steep nature strips and difficult terrain at this location. A footpath here would reduce the necessity of pedestrians crossing the road to the north side footpath.

When considering the Benefit Ratio for this footpath, it is reasonable that a majority of cost be apportioned as the community benefit when investigating pedestrian use of the path. With a calculated Benefit Ratio of 0.32, a majority of funding for this scheme would be provided by Council. The average cost per property is estimated at $2,894 which is higher than some recent schemes.

Of the survey results and more recent submissions, there is a majority of objection to the scheme. Of those opposing the scheme, the main concerns raised and corresponding officer considerations include:


Financial Implications

The project is a one off capital cost and there will be minimal ongoing maintenance costs. If approved, the scheme could proceed this financial year as funding is currently set in the C15309 project cost.

Financial details are as follows:

Maximum scheme levy to Property Owners (income)

$69,471

Scheme levy to Council

$147,625

Direct Funding by Council to build support retaining walls and a new pedestrian refuge island at the intersection with Thornhill Road.

$51,618

Total Project Cost

$268,714


Stakeholder Consultation and Communication

Community consultation for the footpath construction Special Charge Scheme has been carried out as follows:

8 July 2015 – Initiation letter including a concept plan, cost estimate, apportionment of charges, Benefit Ratio Calculation and survey to property owners.

23 March 2016 – Letter to owners advising of Council’s Intention to Declare the Special Charge Scheme and invitation to make submissions.

26 March 2016 – Scheme advertised in the local paper.

17 May 2016 – Update letter advising of scheme process and upcoming panel hearing.

10 August 2016 – Invitation to attend the panel hearing.

7 September 2016 – Panel Hearing.

Some phone calls have been fielded in response to the correspondence. A further letter will be sent to all affected property owners should Council resolve to make its declaration of the Special Charge Scheme.


Policy/Legal/Statutory Implications

The scheme has been prepared in accordance with the Special Rate and Charge provisions of the Local Government Act 1989, the 2004 ministerial guidelines, Council’s Special Rates and Charges Policy and community engagement guidelines.


Alignment to City Plan

This report aligns with the City Plan as follows:

Sustainably Built and Natural Environment


Conflict of Interest

No Council Officer has any direct or indirect interest in the properties affected by the scheme.


Risk Assessment

Provision of a sealed footpath will provide safer movement conditions for pedestrians by minimising the risk of personal injuries through conflict with vehicles and the elimination of uneven and slippery surfaces.

There are no identified risks for Council in making its intention to declare the scheme.


Environmental Implications

The provision of a sealed pathway provides a permanent and safe means of access. During construction and the manufacture and procurement of materials, energy is used resulting in some greenhouse gas emissions. This stops when construction is complete.

The project does not create waste with the exception of some excavated material and green waste.

The proposal does not affect any natural habitats.

The proposal may require some nature strip shrubs to be removed and property trees and shrubs to be trimmed.


Attachment 2

SCHEDULE ‘A’

The works for the construction of a footpath in Roslyn Road, Highton which consist of excavation, concrete footpath, retaining walls, reinstatement of nature strip, miscellaneous construction works and professional services associated with survey, engineering design, drafting, supervision and administration of the project all as included in the cost estimate shown below.


COST ESTIMATE FOR CONSTRUCTION OF FOOTPATH – ROSLYN ROAD, HIGHTON

TOTAL PROJECT COST

ITEM

DESCRIPTION

QUANTITY

UNIT

RATE $

AMOUNT $

1.00

GENERAL

 

 

 

 

1.01

Initial site establishment and set up, decamping and site cleanup and other fixed costs up to time of completion of works.

1.00

ITEM

$24,000.00

$24,000.00

1.02

Traffic management costs.

1.00

ITEM

$8,000.00

$8,000.00

1.03

Setting out of works.

1.00

ITEM

$1,000.00

$1,000.00

1.04

Service/Cable locations

1.00

ITEM

$1,000.00

$1,000.00

1.05

Internal supervision fee (COGG construction)

1.00

ITEM

$11,300.00

$11,300.00

2.00

EARTHWORKS & DEMOLITION

 

 

 

 

2.01

Excavation and disposal of all materials to limits of work as indicated on plan, including trimming for new road pavement, excavation of soft spots and removal of concrete.

300.00

m3

$60.00

$18,000.00

2.02

Saw-cutting of Asphalt paving.

15.00

m

$10.00

$150.00

2.03

Saw-cut of concrete paving

1.00

ITEM

$250.00

$250.00

2.04

Saw-cut of concrete kerb and channel

21.00

m

$10.00

$210.00

2.05

Remove/Trim of overhanging branches of trees and disposal.

10.00

ITEM

$1,000.00

$10,000.00

3.00

PAVEMENT WORKS

 

 

 

 

3.01

75mm compacted depth Class 3 40mm crushed rock, supplied, spread and compacted.

57.00

m3

$100.00

$5,700.00

3.02

100mm compacted depth Class 2 20mm crushed rock, supplied, spread and compacted.

0.00

m3

$120.00

$0.00

3.03

200mm compacted depth Class 3 40mm crushed rock, supplied, spread and compacted.

0.00

m3

$100.00

$0.00

3.04

30mm compacted depth 10mm nominal size type N Asphalt spread and compacted including emulsion prime & grit using a paver.

0.00

m2

$35.00

$0.00

4.00

DRAINAGE - PITS

 

 

 

 

4.01

1set - of 2 pcs New Standard Weepa (weep holes) with 90mm Extension Dimension of weep holes 75W x 20H x 195D spaced @ 1.20m on centre

126.00

No

$5.00

$630.00

4.02

20mm aggregate backfill for drainage zone 200 x 225mm enveloped with geotextile

8.50

m3

$110.00

$935.00

5.00

CONCRETE WORKS: KERBING

 

 

 

 

5.01

Remove existing traffic island and construct new traffic island with pedestrian refuge as per plan.

1.00

ITEM

$5,000.00

$5,000.00

5.02

Reinforced Concrete Retaining Wall and Footing with F62 mesh including 75mm compacted depth Class 3 FCR bedding and reinstate nature strip.

150.00

m

$165.00

$24,750.00

5.03

Concrete pram crossing 1.5m wide, including fine crushed rock bedding.

7.00

No.

$250.00

$1,750.00

 

CONCRETE WORKS: PAVING

 

 

 

 

5.04

125mm (25 Mpa) concrete paving with SL72 mesh including crushed rock bedding and reinstate nature strip.

755.00

m2

$135.00

$101,925.00

6.00

LANDSCAPING

 

 

 

 

6.01

Top soiling and seeding nature strips.

541.00

m2

$8.00

$4,328.00

SUB-TOTAL: A

$218,928.00

7.00

PROVISIONAL ITEMS

 

 

 

 

7.01

Adjust level of existing Telstra and sewer services lid as required.

1.00

ITEM

$5,000.00

$5,000.00

SUB-TOTAL: B

$5,000.00

SUB-TOTAL: C (=A+B)

$223,928.00

10% CONTINGENCY: D

$22,393.00

Design

$11,196.00

Project Administration

$11,196.00

CONSTRUCTION COST ESTIMATE

$268,714


COUNCIL FUNDED WORKS

ITEM

DESCRIPTION

QUANTITY

UNIT

RATE $

AMOUNT $

1.00

GENERAL

 

 

 

 

1.01

Initial site establishment and set up, decamping and site cleanup and other fixed costs up to time of completion of works.

1.00

ITEM

$3,600.00

$3,600.00

1.02

Traffic management costs.

1.00

ITEM

$2,000.00

$2,000.00

1.03

Setting out of works.

1.00

ITEM

$150.00

$150.00

1.04

Internal supervision fee (COGG construction)

 

 

 

 

2.00

EARTHWORKS & DEMOLITION

1.00

ITEM

$1,300.00

$1,300.00

2.01

Excavation and disposal of all materials to limits of work as indicated on plan, including trimming for new road pavement, excavation of soft spots and removal of concrete.

75.00

m3

$60.00

$4,500.00

2.02

Saw-cutting of asphalt paving.

15.00

m

$10.00

$150.00

3.00

DRAINAGE: PITS

 

 

 

 

3.01

1set - of 2 pcs New Standard Weepa (weep holes) with 90mm Extension Dimension of weep holes 75W x 20H x 195D spaced @ 1.20m on centre

126.00

No

$5.00

$630.00

3.02

20mm aggregate backfill for drainage zone 200 x 225mm enveloped with geotextile

8.50

m3

$110.00

$935.00

4.00

CONCRETE WORKS:

 

 

 

 

4.01

Remove existing traffic island and construct new traffic island with pedestrian refuge as per plan.

1.00

ITEM

$5,000.00

$5,000.00

5.02

Reinforced Concrete Retaining Wall and Footing with F62 mesh including 75mm compacted depth Class 3 FCR bedding and reinstate nature strip.

150.00

m

$165.00

$24,750.00

SUB-TOTAL:

$43,015.00

10% CONTINGENCY: D

$4,302.00

Design

$2,581.00

Project Administration

$1,721.00

CONSTRUCTION COST ESTIMATE

$51,618.00




Attachment 3

BENEFIT RATIO CALCULATION

A

Purpose

 

 

To construct a footpath in Roslyn Road, Highton to provide all weather pedestrian access for property owners and the wider community.

 

B

Coherence

 

 

The works will provide a physical pathway connection between Remony Avenue and Wandana Drive and will provide a special benefit to adjoining and remote properties.

 

C

Total Cost C

 

 

Total Estimated cost of works - footpath construction

$268,714.00

 

Direct funding by Council to replace traffic island with pedestrian refuge and reinforced concrete retaining wall

$51,618.00

 

TOTAL COST

$217,096.00

D

Identify Special Beneficiaries

 

 

24 properties with frontages to the proposed footpath are considered to receive access and amenity benefits.

 

E

Properties to include

 

 

The 24 abutting properties receive both access and amenity benefits. Therefore:

 

 

Total Special Benefits (in) is apportioned to 24 properties

 

 

There are no Council owned properties in the scheme. Therefore:

 

 

Total Special Benefits out of the scheme

TSB (out)

=

0

 

F

Estimate of Total Special Benefits

 

 

For this scheme it is considered that the greater proportion of benefit is for pedestrian access given the purpose of the scheme. Therefore it is estimated that 80% of the benefits relate to access and 20% to amenity. Estimated pedestrian use of the paths is 85% for the wider community and 15% for abutting property owners. Amenity benefits are based on frontage with 100% of the footpaths fronting benefiting properties. TSB (in) is therefore calculated as follows:

 

 

TSB (in) = 80% X 15%(access) + 20% X 100% (amenity)

=

32%

 

G

Estimate of Total Community Benefit -TCB

 

 

It is considered that people in the community will receive a benefit from the works as the pathway is used to access other areas. There are no amenity benefits considered for the wider community. TCB is calculated as follows:

 

 

 

 

 

TCB

=

85% X 80% (access)

 

=

68%

 

H

Calculate "Benefit Ratio" - R

 

 

Benefits Ratio

=

TSB (in)

=

32

0.32

 

 

 

 

TSB (in) + TSB (out) + TCB

 

32 + 0 + 68

 

 

I

Maximum Total Levy (S)

 

 

Maximum Total Levy S = R X C

 

 

 

$69,470.72

 

Council Contribution to Special Charge Scheme

 

 

 

$147,625.28



Attachment 4

SCHEDULE ‘C’
SPECIAL CHARGE SCHEME FOR FOOTPATH CONSTRUCTION
ROSLYN ROAD, HIGHTON

 

COLUMN 1

COLUMN 2

COLUMN 3

COLUMN 4

COLUMN 5

COLUMN 6

COLUMN 7

COLUMN 8

 

ADDRESS

FRONTAGE
(metres)

ALLOWANCE
FOR
DRIVEWAY

APPORTIONABLE
FRONTAGE
(metres)

ACCESS BENEFIT UNIT

ACCESS BENEFIT

AMENITY BENEFIT

ESTIMATED TOTAL COST

1

293 Roslyn Road, HIGHTON VIC 3216

20.12

0.00

20.12

0.50

$ 914.09

$ 1,550.00

$ 2,464.09

2

295 Roslyn Road, HIGHTON VIC 3216

20.12

3.18

16.94

1.00

$ 1,828.18

$ 1,304.98

$ 3,133.16

3

297-307 Roslyn Road, HIGHTON VIC 3216

80.47

0.00

80.47

1.00

$ 1,828.18

$ 6,200.01

$ 8,028.18

4

16 Carramar Court, HIGHTON VIC 3216

15.24

0.00

15.24

0.50

$ 914.09

$ 1,174.24

$ 2,088.33

5

13 Roslyn Road, HIGHTON VIC 3216

46.13

8.22

37.91

0.50

$ 914.09

$ 2,920.69

$ 3,834.78

6

1 Thornhill Road, HIGHTON VIC 3216

33.53

0.00

33.53

0.50

$ 914.09

$ 2,583.34

$ 3,497.42

7

321 Roslyn Road, HIGHTON VIC 3216

16.77

0.00

16.77

0.50

$ 914.09

$ 1,292.13

$ 2,206.22

8

323 Roslyn Road, HIGHTON VIC 3216

16.63

3.00

13.63

1.00

$ 1,828.18

$ 1,050.19

$ 2,878.37

9

325 Roslyn Road, HIGHTON VIC 3216

18.28

5.50

12.78

1.00

$ 1,828.18

$ 984.70

$ 2,812.88

10

327-329 Roslyn Road, HIGHTON VIC 3216

49.68

3.36

46.32

1.00

$ 1,828.18

$ 3,568.96

$ 5,397.14

11

331 Roslyn Road, HIGHTON VIC 3216

19.82

3.17

16.65

1.00

$ 1,828.18

$ 1,282.88

$ 3,111.06

12

1/333 Roslyn Road, HIGHTON VIC 3216

30.44

4.06

6.60

1.00

$ 1,828.18

$ 508.15

$ 2,336.32

13

2/333 Roslyn Road, HIGHTON VIC 3216

 

 

6.60

1.00

$ 1,828.18

$ 508.15

$ 2,336.32

14

3/333 Roslyn Road, HIGHTON VIC 3216

 

 

6.60

1.00

$ 1,828.18

$ 508.15

$ 2,336.32

15

4/333 Roslyn Road, HIGHTON VIC 3216

 

 

6.60

1.00

$ 1,828.18

$ 508.15

$ 2,336.32

16

337 Roslyn Road, HIGHTON VIC 3216

17.00

3.33

13.67

1.00

$ 1,828.18

$ 1,053.27

$ 2,881.45

17

339 Roslyn Road, HIGHTON VIC 3216

16.50

0.00

16.50

0.50

$ 914.09

$ 1,271.33

$ 2,185.42

18

341 Roslyn Road, HIGHTON VIC 3216

21.39

0.00

21.39

0.50

$ 914.09

$ 1,648.10

$ 2,562.19

19

343 Roslyn Road, HIGHTON VIC 3216

18.10

3.76

14.34

1.00

$ 1,828.18

$ 1,104.90

$ 2,933.08

20

345 Roslyn Road, HIGHTON VIC 3216

18.10

3.61

14.49

1.00

$ 1,828.18

$ 1,116.46

$ 2,944.63

21

347 Roslyn Road, HIGHTON VIC 3216

18.52

3.00

15.52

1.00

$ 1,828.18

$ 1,195.82

$ 3,023.99

22

1/349 Roslyn Road, HIGHTON VIC 3216

24.08

5.90

6.06

0.50

$ 914.09

$ 466.92

$ 1,381.01

23

2/349 Roslyn Road, HIGHTON VIC 3216

 

 

6.06

0.50

$ 914.09

$ 466.92

$ 1,381.01

24

3/349 Roslyn Road, HIGHTON VIC 3216

 

 

6.06

0.50

$ 914.09

$ 466.92

$ 1,381.01




Attachment 6

PROCESS CHART
SPECIAL CHARGE PROJECTS – Section 163 – Local Government Act 1989)

ROSLYN ROAD, HIGHTON – PROPOSED FOOTPATH

Stage

Status

Description

Approval to prepare scheme

✓

Decision made to prepare scheme following consideration of surveys of residents and feed back from the community. Council may then place the project in the budget system or proceed immediately to prepare a scheme. Scheme preparation involves survey, design and preparation of an apportionment of costs. July 2015

Intention to Declare Scheme

✓

Report to Council providing information on scheme including advice of impending advertising of scheme and declaration of charge. Seeks Council approval by resolution to proceed with process. 15 March 2016

Advertisement

✓

The scheme is advertised in the local newspaper and all allotted property owners are notified by mail. This advertisement indicates Council’s intention and notification to ‘declare’ a scheme in a month’s time or at a subsequent meeting. 26 March 2016.

Submissions

✓

From the time of advertising property owners have 28 days (as set down by the Local Government Act) to lodge submissions, either in support or opposition to the scheme. Closed 26 April 2016.

Submissions Review Panel Hearing

✓

A Submissions Review Panel is convened if required (quorum of three Councillors) and meets to consider submissions. Some submissions are written only, and other submitters may wish to be heard before the Panel. The Panel makes a recommendation to Council regarding the scheme. 7 September 2016

Declaration Report

✓

Any time 28 days after advertising the scheme and after the Submissions Review Panel has met and considered submissions, Council considers a report and may proceed to “declare” the charges in accordance with its advertised intent.

Subsequent to this the Finance Manager issues the levy notices and there is a formal charge placed on the property.

This is the final step in the process for Council to make a decision on the scheme.

Appeal

Property owners may lodge an application for review with the Victorian Civil and Administrative Tribunal (VCAT) within one month of issue of the levy notice. An appeal is listed, heard and determined by the Tribunal and this process generally takes three to four months. Decisions made by VCAT are binding on all parties.

Construction

Council may then proceed to construct the works. Invoices are issued seeking payment of the estimated cost within one month of commencement.

Final Cost Report

At the completion of the works the scheme is “finalised” taking into account actual costs incurred and payments are adjusted accordingly.



[Back to List]

11. Station Street, Drysdale - Road Construction Special Charge Scheme - SRC 349 - Declaration of Charge

Source:

City Services - Engineering Services

General Manager:

William Tieppo

Index Reference:

Special Rates and Charges, Station Street, Drysdale



Purpose

This report seeks a resolution by Council to declare the charges for a Special Charge Scheme to partially fund the construction of roads in Station Street and Crimea Street, Drysdale. (See plan – Attachment 5)


Background

Complaints have come in over time about the state of the unsealed roads of Station, Crimea and Bridge Streets, Drysdale. There is also a desire to have Station Street closed at the western end near High Street.

Support for a Special Charge Scheme was sought in 2015 where options were presented to the affected property owners at a public meeting held in Drysdale. This was followed up with a survey where a majority of owners favoured road construction at a reduced cost.

Council resolved its intention to declare a Special Charge Scheme at its meeting of 26 July 2016. A submissions review panel hearing was held on 8 November 2016.


Key Issues

P Dorling moved, L Gardner seconded -

That Council

  1. Resolves to declare the Special Charge Scheme as follows:

    1. The Special Charge is declared for a period of five (5) years commencing upon commencement of the works.

    2. The special charge be declared for the purposes of defraying expenses incurred by Council in relation to the construction of roads including Station Street, Crimea Street and Bridge Street, Drysdale which:

      1. will provide proper sealed road access, improved street drainage and enhancement to the general amenity for each of the properties included in the scheme;

      2. Council considers is or will be a special benefit to those persons required to pay the special charge (and who are described in succeeding parts of this Resolution); and

      3. arises out of Council’s function of planning for and providing infrastructure for property owners.

    3. it be recorded that, for the purposes of Section 163 (2A) of the Act, the special charge proceeds will not exceed the amount calculated in accordance with the prescribed formula (R x C = S), the:

      1. ‘benefit ratio’ (R) being calculated at 0.8 represents the special benefits to all persons liable to pay the special charge; and

      2. ‘total cost’ (C) of performing the function described in Part b of this Resolution based on estimated cost be recorded as $313,186.

      3. ‘maximum levy’ (S) total amount of the special charge be levied and recorded as $250,549.

    4. the following be specified as the area for which the special rate is so declared:

      1. the area within municipal district of Council highlighted in the plan attached to this Resolution (“the area”).

    5. the following be specified as the land in relation to which the special charge so declared:

      1. All land within the area shown on the plan.

    6. the following be specified as the criteria which form the basis of the special charge so declared:

      1. Ownership of any land described in Part 1(e) of this Resolution.

    7. the following be specified as the manner in which the special charge so declared will be assessed and levied:

      1. The costs to be apportioned based on access and amenity benefits.

      2. The special charge will be levied by sending a notice to the person who is liable to pay, pursuant to section 163(4) of the Act.

    8. having regard to the preceding parts of this Resolution but subject to Section 166 (1) of the Act, it be recorded that:

      1. the owners of the land described in column 1 of Schedule C to the Resolution are estimated liable for the respective amounts set out in column 7 of Schedule C; and

      2. such owners may, subject to any further resolution of Council pay the special charge in the following manner:

        1. the charge will become due and payable within one month of the issue of the notice requesting payment pursuant to Section 167 (3) of the Act;

        2. interest will not be charged for six months after the issue of the notice provided the person liable makes timely payment in accordance with any repayment arrangements that may be agreed on by Council; and

        3. in accordance with Section 172 of the Act, the rate of interest which is payable on the special charge which has not been paid by the specified date is set at Council’s overdraft rate, reviewed every three months (provided that it shall not exceed the rate fixed by the Governor in Council by Order for the purposes of Section 172 (2A) in which case the rate of interest shall be the maximum rate fixed by the Governor in Council by Order for the purposes of this section).

  1. Authorise Council’s Chief Executive Officer to levy the Special Charge in accordance with Section 163(4) of the Act.

  2. Authorise the discontinuance of Station Street at the western end near the High Street intersection under Schedule 10 of the Act.

Carried.



Attachment 1

Discussion

An application for residential development has been made for the property at 4-6 De Burgh Road, Drysdale which fronts Bridge Street. Negotiations with the developer have taken place and an agreement has been struck to include the developer in the scheme. This is a mutually beneficial arrangement. The resultant agreement will see the developer construct Bridge Street to full standard between De Burgh Road and the rail line. This will include kerb and channel and underground drainage.

The development application described above was submitted under Permit No PP677/2015. With an agreement in place, Council’s construction cost for the project is reduced, property owners will benefit from a higher standard of work and lower cost and the developers costs are reduced due to the co contributions from the scheme.

Although the preferred option was the rural road style of construction, the scope of work for Station and Crimea Streets will include additional depth of road pavement rather than simply sealing over the top of the existing road.

A submissions review panel was held on 8 November 2016. Six property owners spoke to the panel and were generally in support of the road sealing and closure. Some property owners opposing the charge who asked to be heard were absent from the hearing.

A summary of issues raised at the hearing and officer response is as follows:

On Tuesday 8 November, the panel members visited Station Street, Drysdale prior to the panel hearing. The panel has recommended the scheme proceed to declaration as presented.


Financial Implications

The project has a one off capital cost and there will be minimal ongoing maintenance costs. The scheme is funded via the core program C02301 and can proceed in the 2016/17 financial year.

Since Bridge Street in being constructed by a developer, this reduces the funding commitment by Council. A breakdown of costs is as follows:

Total project cost estimate

$466,257.00

Developer contribution to project (income)

-$153,071.00

Total revised scheme cost

$313,186.00


From a scheme perspective due to the developer at 4-6 De Burgh Road constructing the Bridge Street works, they are not required to make a Special Charge payment. Scheme costs can be summarised as follows:

Scheme cost to property owners

$250,548.80

Scheme cost to council

$62,637.20

Total revised scheme cost

$313,186.00


The net cost to Council for this project is $62,637.20.


Stakeholder Consultation and Communication

Community consultation of the road construction Special Charge Scheme has been carried out as follows:

Further correspondence will be sent to all affected property owners should Council resolve to make its Declaration of charges.


Policy/Legal/Statutory Implications

The scheme has been prepared in accordance with the Special Rate and Charge provisions of the Local Government Act 1989 along with Council’s Special Rates and Charges Policy and community engagement guidelines.


Alignment to City Plan

This report aligns with the City Plan as follows:

Community Wellbeing:

Sustainably Built and Natural Environment


Conflict of Interest

No Council Officer involved with this process has any direct or indirect interest in the properties.


Risk Assessment

Provision of sealed roads will provide safer driving conditions for motorists with a defined and more standard road profile. Walking conditions for pedestrians will also be improved. The improved drainage will reduce the hazards associated with water over roads and the affects of nuisance flooding. There are no identified risks for Council in making its intention to declare the scheme.


Environmental Implications

The road infrastructure proposal provides proper sealed access, improved drainage and a generally safer environment for pedestrian and vehicular traffic. Dust is eliminated.

Storm water runoff will be less contaminated with silt prior to discharge as the bulk of the storm water will be cleaner coming off a sealed road environment.

It is anticipated that no vegetation removal will be required to complete the project.

During the course of construction and the manufacture and procurement of materials, there is expenditure of energy and greenhouse gas emissions. This does cease, however, when construction is complete.

The project does not create waste with the exception of some excess spoil. The proposal does not affect any natural habitats.

Attachment 2

COST ESTIMATE FOR CONSTRUCTION OF ROADS
STATION STREET, CRIMEA STREET and BRIDGE STREET DRYSDALE

The works for the construction of roads in Station Street, Crimea Street and Bridge Street which consist of excavation, drainage improvements, reinstatement of nature strips, legal advice and professional services associated with survey, engineering design, supervision and administration of the project as included in the cost estimate as shown below.

CONSTRUCTION OF STATION STREET, CRIMEA STREET AND BRIDGE STREET DRYSDALE

ITEM

DESCRIPTION

QUANTITY

UNIT

RATE $

AMOUNT $

1.00

GENERAL

 

 

 

 

1.01

Initial site establishment and set up, decamping and site cleanup and other fixed costs up to time of completion of works.

 

ITEM

 

$15,000.00

1.02

Traffic management costs.

 

ITEM

 

$10,000.00

1.03

Setting out of works.

 

ITEM

 

$1,000.00

 

STATION AND CRIMEA STREET

 

 

 

 

2.00

PAVEMENT WORKS

 

 

 

 

2.01

Trimming for new road pavement and excavation of soft spots

 

ITEM

 

$5,000.00

2.02

150mm compacted depth Class 2 20mm crushed rock, supplied, spread and compacted.

611

m3

$118.00

$72,098.00

2.03

7mm Primer Seal, supplied and placed.

4076

m2

$8.00

$32,608.00

3.00

DRAINAGE

   

 

 

3.01

Rural vehicle crossing 300mm diam. RC pipe, 20m wide with VicRoads driveable endwalls as per SD00603, supplied, laid and jointed including excavation, placement of approved FCR bedding and backfill.

1

No.

$9,000.00

$9,000.00

3.02

Rural vehicle crossing 300mm diam. RC pipe, 3.6m wide with VicRoads driveable endwalls as per SD00603, supplied, laid and jointed including excavation, placement of approved FCR bedding and backfill.

17

No.

$2,800.00

$47,600.00

4.00

CONCRETE WORKS

 

 

 

 

 

KERBING

 

 

 

 

4.01

B2 Barrier kerb and channel 450mm wide, including fine crushed rock bedding.

45

m

$120.00

$5,400.00

4.03

Concrete pram crossing 1.5m wide, including fine crushed rock bedding.

2

No.

$250.00

$500.00

 

PAVING

 

 

 

 

4.02

100mm pattern concrete paving with SL72 mesh including crushed rock bedding and reinstate nature strip.

236

m2

$120.00

$28,320.00

 

BRIDGE STREET

   

 

 

5.00

PAVEMENT WORKS

 

 

 

 

5.01

Trimming for new road pavement and excavation of soft spots

 

ITEM

 

$2,000.00

5.02

Sawcut and remove existing asphalt to create overlap onto existing pavement

88

m

$12.00

$1,056.00

5.03

310mm compacted depth Class 3 20mm crushed rock, supplied, spread and compacted.

591

m3

$80.00

$47,280.00

5.04

150mm compacted depth Class 2 20mm crushed rock, supplied, spread and compacted.

275

m3

$118.00

$32,450.00

5.05

Bituminous Prime Coat

1816

m2

$3.03

$5,493.40

5.06

30mm compacted depth, 10mm nominal size type N asphalt

1816

m2

$17.00

$30,872.00

6.00

CONCRETE WORKS

 

 

 

 

6.01

B2 Barrier kerb and channel 450mm wide, including fine crushed rock bedding.

316

m

$120.00

$37,920.00

6.02

Edge Strips

10

m

$40.00

$400.00

7.00

PROVISIONAL WORKS

 

 

 

 

7.01

Regrade table drains

910

m

$5.00

$4,550.00

SUB-TOTAL

$388,547

Survey and Design

$19,427

Administration

$19,427

10% CONTINGENCY

$38,855

CONSTRUCTION COST ESTIMATE

$466,257



Attachment 3

Benefit Ratio Calculation – SCHEDULE ‘B’

A

Purpose

 

 

To construct Station Street, Crimea Street between High Street and Station Street and the unsealed sections of Bridge Street between De Burgh Road and Station Street, Drysdale.

 

B

Coherence

 

 

The works will provide a physical connection between High Street, Bridge Road and De Burgh Street, Drysdale and will provide a special benefit to adjoining and adjacent properties.

 

C

Total Cost C

 

 

Total Estimated cost of works - rural road construction

$466,257

 

Developer contribution towards Bridge Street construction

$153,071

 

TOTAL COST

$313,186.00

D

Identify Special Beneficiaries

 

 

46 properties are considered to receive a combination of access and amenity benefits. 1 Property receives a benefit from the scheme but is not included in the scheme

 

E

Properties to include

 

 

The 46 properties receive a combination of access and amenity benefits. Therefore:

 

 

Total Special Benefits (in) is apportioned to 46 properties

 

 

There are no Council owned properties in the scheme but 1 property that receives special benefit but is considered to be out of the scheme. Therefore:

 

 

Total Special Benefits out of the scheme TSB (out) = 1

F

Estimate of Total Special Benefits

 

 

For this scheme it is considered that an equal portion of access and amenity benefits apply to an individual property. We shall assume that each property is made up of 1 access benefit unit (BU) and one amenity BU. For the large property out of the scheme, this is under development and will ultimately consist of 10 allotments fronting Bridge Street. Benefit Units are assigned to each property accordingly. For properties in and out of the scheme, a summary of special benefits can be shown in the following table:

 

 

 

46 private properties TSB (in)

1 property out TSB (out)

 

 

 

 

 

Access

46

10

 

 

 

 

 

Amenity

46

10

 

 

 

 

 

Total Special Benefits

92

20

 

 

 

 

G

Estimate of Total Community Benefit -TCB

 

 

It is considered that people in the community will receive an access benefit from the works as the roadways are used to access other areas considering potential destinations such as the primary and secondary schools to the south and shopping centre to the north. Based on traffic data, estimated use of the road is 15% for the wider community and 85% for the properties in and out of the scheme. If 85% of the total access benefits is equal to 46BU, 15% would equate to 8. There are no amenity benefits associated with the wider community.

 

 

TCB =

8.0

 

H

Calculate "Benefit Ratio" - R

 

 

 

Benefits Ratio

=

TSB (in)

=

92

0.8

 

 

 

 

TSB (in) + TSB (out) + TCB

 

92 + 20 + 8

 

 

I

Maximum Total Levy (S)

 

 

 

Maximum Total Levy S = R X C

 

$250,548.80

 

Council Contribution to Special Charge Scheme

 

$62,637.20



Attachment 4

SCHEDULE “C”
PROPOSED SPECIAL CHARGE SCHEME - ROAD CONSTRUCTION, DRYSDALE

>

Column 1

Column 2

Column 3

Column 4

Column 5

Column 6

Column 7

Address

Frontage
(metres)

Apportionable Frontage (metres)

Access Benefit

Access Benefit

Amenity Benefit

Total Estimated Cost

97-99 High Street, DRYSDALE

114.71

51.00

0.25

$829.63

$6,045.25

$6,874.88

119 High Street, DRYSDALE

47.88

33.00

0.5

$1,659.26

$3,911.63

$5,570.89

121 High Street, DRYSDALE

42.47

28.00

0.5

$1,659.26

$3,318.96

$4,978.22

121 High Street, DRYSDALE

123 High Street, DRYSDALE

25.15

25.15

1

$3,318.53

$2,980.66

$6,299.19

Rear 123 High St Facing Station St

 

 

 

 

 

 

125 High Street, DRYSDALE

36.27

36.27

1

$3,318.53

$4,299.24

$7,617.76

127 High Street, DRYSDALE

26.41

26.41

1

$3,318.53

$3,130.84

$6,449.37

1 Madison Court, DRYSDALE

20.85

0.00

0.5

$1,659.26

$0.00

$1,659.26

2 Madison Court, DRYSDALE

0.00

0.5

$1,659.26

$0.00

$1,659.26

3 Madison Court, DRYSDALE

0.00

0.5

$1,659.26

$0.00

$1,659.26

1 Ryder Court, DRYSDALE

25.00

0.00

0.5

$1,659.26

$0.00

$1,659.26

2 Ryder Court, DRYSDALE

0.00

0.5

$1,659.26

$0.00

$1,659.26

3 Ryder Court, DRYSDALE

0.00

0.5

$1,659.26

$0.00

$1,659.26

4 Ryder Court, DRYSDALE

0.00

0.5

$1,659.26

$0.00

$1,659.26

5 Ryder Court, DRYSDALE

0.00

0.5

$1,659.26

$0.00

$1,659.26

6 Ryder Court, DRYSDALE

0.00

0.5

$1,659.26

$0.00

$1,659.26

18 Bridge Street, DRYSDALE

20.00

0.00

0.5

$1,659.26

$0.00

$1,659.26

24 Bridge Street, DRYSDALE

58.77

58.77

1

$3,318.53

$6,966.26

$10,284.78

24 Bridge Street, DRYSDALE

45.39

 

 

$0.00

$0.00

$0.00

30 Bridge Street, DRYSDALE

 

0.00

0.5

$1,659.26

$0.00

$1,659.26

32A Bridge Street, DRYSDALE

14.75

0.00

0.5

$1,659.26

$0.00

$1,659.26

32B Bridge Street, DRYSDALE

10.96

0.00

0.5

$1,659.26

$0.00

$1,659.26

9 Station Street, DRYSDALE

25.15

42.47

1

$3,318.53

$5,034.15

$8,352.68

42.47

2-10 Station Street, DRYSDALE

 

136.00

1

$3,318.53

$16,120.66

$19,439.18

11 Station Street, DRYSDALE

30.18

43.73

1

$3,318.53

$5,183.50

$8,502.03

11 Station Street, DRYSDALE

43.73

 

 

 

 

 

12 Station Street, DRYSDALE

28.97

28.97

1

$3,318.53

$3,433.94

$6,752.46

13 Station Street, DRYSDALE

30.18

30.18

1

$3,318.53

$3,577.36

$6,895.89

14 Station Street, DRYSDALE

28.97

28.97

1

$3,318.53

$3,433.94

$6,752.46

15-19 Station Street, DRYSDALE

60.35

60.35

2

$6,637.05

$7,153.54

$13,790.60

16 Station Street, DRYSDALE

30.18

30.18

1

$3,318.53

$3,577.36

$6,895.89

1/18 Station Street, DRYSDALE

15.09

30.18

1

$3,318.53

$3,577.36

$6,895.89

2/18 Station Street, DRYSDALE

15.09

 

 

 

$0.00

$0.00

20 Station Street, DRYSDALE

30.18

30.18

1

$3,318.53

$3,577.36

$6,895.89

21-23 Station Street, DRYSDALE

40.23

40.23

1

$3,318.53

$4,768.63

$8,087.16

22 Station Street, DRYSDALE

30.18

30.18

1

$3,318.53

$3,577.36

$6,895.89

24 Station Street, DRYSDALE

30.18

30.18

1

$3,318.53

$3,577.36

$6,895.89

25-27 Station Street, DRYSDALE

40.23

40.23

1

$3,318.53

$4,769.06

$8,087.59

26 Station Street, DRYSDALE

30.18

30.18

1

$3,318.53

$3,577.36

$6,895.89

28 Station Street, DRYSDALE

35.13

35.13

1

$3,318.53

$4,164.11

$7,482.63

29 Station Street, DRYSDALE

4.14

4.14

1

$3,318.53

$490.73

$3,809.26

30 Station Street, DRYSDALE

35.13

35.13

1

$3,318.53

$4,164.11

$7,482.63

31 Station Street, DRYSDALE

4.00

4.00

1

$3,318.53

$474.14

$3,792.66

32 Station Street, DRYSDALE

15.00

0.00

0.5

$1,659.26

$0.00

$1,659.26

33 Station Street, DRYSDALE

16.00

16.00

1

$3,318.53

$1,896.55

$5,215.07

34 Station Street, DRYSDALE

15.72

0.00

0.5

$1,659.26

$0.00

$1,659.26

35 Station Street, DRYSDALE

16.00

16.00

1

$3,318.53

$1,896.55

$5,215.07

37 Station Street, DRYSDALE

20.00

20.00

1

$3,318.53

$2,370.68

$5,689.21

39 Station Street, DRYSDALE

17.65

17.65

1

$3,318.53

$2,092.13

$5,410.66

41 Station Street, DRYSDALE

18.00

18.00

1

$3,318.53

$2,133.62

$5,452.14

 

 

 

 

 

 

$250,548.80



Attachment 5

PLAN

Attachment 5 - Plan

Attachment 6

PROCESS CHART
SPECIAL CHARGE PROJECTS – (Section 163 – Local Government Act 1989)

Station Street, Crimea Street and Bridge Street, Drysdale

Stage

Status

Description

Approval to prepare scheme

✓

Decision made to prepare scheme following consideration of surveys of property owners and feed back from the community.

Council may then place the project in the budget system or proceed immediately to prepare a scheme.

Scheme preparation involves survey, design and preparation of an apportionment of costs. January 2015.

Intention to Declare Scheme

✓

Report to Council providing information on scheme including advice of impending advertising of scheme and declaration of charge. Seeks Council approval by resolution to proceed with process. 26 July 2016

Advertisement

✓

The scheme is advertised in the local newspaper and all allotted property owners are notified by mail.

This advertisement indicates Council’s intention and notification to ‘declare’ a scheme in a month’s time. 6 August 2016

Submissions

✓

From the time of advertising property owners have 28 days (as set down by the Local Government Act) to lodge submissions, either in support or opposition to the scheme.

Submissions Review Panel Hearing

✓

A Submissions Review Panel is convened (quorum of three Councillors) and meets to consider submissions.

Some submissions are written only, and other submitters may wish to be heard before the Panel.

The Panel makes a recommendation to Council regarding the scheme. 8 November 2016

Declaration Report

✓

Any time 28 days after advertising the scheme and after the Submissions Review Panel has met and considered submissions, Council considers a report and may proceed to “declare” the charges in accordance with its advertised intent.

Subsequent to this the Finance Manager issues the levy notices and there is a formal charge placed on the property.

This is the final step in the process for Council to make a decision on the scheme.

Appeal

 

Property owners may lodge an application for review with the Victorian Civil and Administrative Tribunal (VCAT) within one month of issue of the levy notice.

An appeal is listed, heard and determined by the Tribunal and this process generally takes three to four months.

Decisions made by VCAT are binding on all parties.

Construction

 

Council may then proceed to construct the works. Invoices are issued seeking payment of the estimated cost within one month of commencement.

Final Cost Report

 

At the completion of the works the scheme is “finalised” taking into account actual costs incurred and payments are adjusted accordingly.



[Back to List]

12. Tender Submissions for Recruitment Training and Associated Services

Source:

People & Organisation Development - Remuneration

Executive Manager:

Andrew Keen

Index Reference:

Provision of Agency Staff - T1700009


Purpose

To enter into a new contract with Procurement Australia (“PA”) for the provision of our supplementary labour (agency staff).


Background

Council is required to tender out this service contract as part of its obligations under the Local Government Act. Council provided PA with a non-binding expression of interest to again undertake a tender for recruitment, training and associated products and services (Tender 1912/0618) on behalf of various Councils participating in the tender.


Key Issues

L Gardner moved, P Dorling seconded -

That Council:

  1. approve the Contract for the Provision of Recruitment Training & Associated Services with Procurement Australia (Contract No 1912/0618);

  2. delegate authority to the Chief Executive Officer to sign agreements with both Procurement Australia and Commensura.

Carried.


Attachment 1

Discussion

Council decided not to undertake the tendering process internally due to costs, time and resources. PA has a large buying power and has the ability to adequately satisfy the needs of Council with the provision of agency staff to meet our supplementary labour requirements.

Council determined that the benefits of the PA collaborative purchasing approach are economies of scale achieved by grouping together with other Councils, attracting quality submissions, reduced administration costs and a larger pool of companies with agreed rates and services to select from. Council determined this methodology was preferable to undertaking its own tender process. Therefore PA was selected to act as Councils tendering agent for the provision of temporary recruitment services.

PA were contracted by Council for the provision of supplementary labour for the previous contract from January 2012 and expiring on 31 December 2016.

In the current contract PA have put forward a total of 36 recruitment and associated products providers on behalf of the below listed twenty-eight (28) Councils:

As the City is a key member of G21 initiatives and has a strong platform for supporting local Geelong businesses we will be advising the panel that all requests for agency staff are to be sourced from our local suppliers in the first instance. Where we are unable to access the required staff from our local providers we would then fall back to access other providers on the PA panel.


Financial Implications

Whilst it is yet to be quantified, there will be savings to be achieved through the contract with PA, as we will be able to access the services of the neutrally managed vendor service, namely Commensura. There have been significant cost reduction realised in other Councils of similar scale moving to a vendor managed approach.

Benefits include but not limited to the following:


[Back to List]

13. 2016-2017 December Financial Management Report and Mid-year Budget Update

Source:

Strategy & Performance - Financial Services

Acting General Manager:

Louise Hill

Index Reference:

Financial Management / Financial Reporting 2016-17


Purpose

The purpose of this report is to present the financial performance of Council for the quarter ended 31 December 2016, and to consider Operating and Capital projection changes.


Background

A variation to the amended budget is sought due to the significant transformation program underway across the organisation. The additional expenditure required to achieve this program is offset by identified savings.


Key Issues

December quarter Year-to-date Finance results include:

A half-year budget review has been undertaken. A range of cost increases were identified along with cost savings.

 

Income

$,000’s

Expenditure

$,000’s

Surplus/(Deficit)

$,000’s

Approved Amended Budget

321,341

328,384

(7,043)

Projection Changes to Dec 2016

1,183

393

790

Projection as at 31 Dec 2016

322,524

328,777

(6,253)

Mid-year review changes (net)

-

485

 

Revised full-year projection

322,524

329,262

(6,738)

Cash impact - increase

 

 

305


L Gardner moved, P Dorling seconded -

  1. note the Quarterly Financial Report 31 December 2016 (Attachment 2);

  2. endorse the 2016-17 Operating and Capital projection changes (Attachment 1), subject to an additional $200,000 to the Transformation Program.

Carried.


Attachment 1

Discussion

2016-17 Operating and Capital projection changes

The Adopted Budget was amended by Council on 6 September 2016 to include carryover capital and discretionary projects, plus other capital and recurrent amendments. The impact on the recurrent expenditure budget is an increase of $8.87m, and on non recurrent income of $7.80m for carryover of capital income from 2015 - 16 projects.

The amended capital expenditure budget included an additional $60.18m to complete 2015-16 Projects. Other budget amendments increased total budget by $0.33m.

In late 2016, two significant diagnostic reviews were undertaken of Financial Management and ICT. The reviews recommended a range of improvement initiatives to bring the Council to contemporary levels of capability and capacity. Additional investment is required for both of these key functions which underpin the transformation to a high performing organisation. A number of other funding priorities were also identified as follows.

Additional expenditure of $1.65m is required in the following areas:

Savings initiatives of $1.17m on a one-off basis have been identified:

Deferment/savings of expenditure on several other initiatives

Projection changes to 31 December 2016/ Mid-year Budget Update

The following tables highlight the specific Operating and Capital changes which form part of the mid-year review.

Operating 2016-17

 

$000’s

Authorised amended budget deficit

(7,043)

Projection changes as at 31 December 2016

 

Expenditure increases (Diversion of waste $0.2m, Osborne House Works $0.2m)

400

Income increases (Supplementary rates $0.5m, Planning Applications $0.5m)

1,183

Projection changes surplus

790

   

Mid-year review projection changes

 

Expenditure increases:

 

Our Future (Vision project)

125

ICT Review / Strategy development and Stage 1 implementation

610

Financial management review and implementation

320

Agri Business Strategy

100

Internal Audit – outsourcing

100

Transformation Program (PMO, Governance, Service Planning, Complaints Review, Asset Management, Engagement and Communication)

400

 

1,655

Expenditure savings:

 

Salaries / supplementary labour

800

Building Asset Survey

100

Ocean Grove principal pedestrian network

50

Floating Christmas Tree installation

70

Early childhood planning

50

Linking Learning Eastern Suburbs

100

 

1,170

 

 

Mid-year review projected expenditure (increase)

(485)

 

 

Projected deficit as at 31 December 2016

(6,737)

 

 

Cash impact - increase

305


Capital program 2016-17

 

$000’s

Authorised amended capital expenditure budget (net)

106,114

 

 

Capital projection changes as at 31 December 2016

 

Net expenditure savings

(includes $13.1m carried over to 2017-18)

13,286

 

 

Mid-year review projection changes Cost Reductions / (Increases)

Light fleet replacement savings

192

Heavy and dedicated fleet savings

196

Design and investigation – SR&C savings

100

New bin supply (Waste Collection) savings

50

Innovation Drive construction savings

239

Hede Street landfill investigative works savings

150

Service reviews software pilot (project cancelled)

50

City Hall customer service works

(75)

 

902

 

 

Total projected capital expenditure (net)

91,925

 

 

Total cash movement – Favourable /(Unfavourable)

14,188

 

 

Includes:

Cash impact – increase

Increase Carry over to 2017-18

1,058

13,130



Attachment 2

EXECUTIVE OVERVIEW

Quarterly Financial Report 31 December 2016

Two graphs: left graph shows underlying surpluc / (Deficit) 31 December 2016; right graph shows Capital Expenditure 31 December 2016

The underlying result of $12.6m surplus is ($13.4m) unfavourable to amended budget mainly due to the transfer of assets to the Kardinia Park Stadium Trust ($28.8m).

The Recurrent result is a surplus of $9.7m or $11.5m favourable to budget. The major recurrent favourable and unfavourable performance variances are highlighted in the section below.


RECURRENT VARIANCES TO BUDGET

Graphh showing top 10 variances to Budget ($ thousands) 31 December 2016

Favourable Recurrent variances:

  1. Salaries – YTD variance is $2,950k. This is mainly associated with vacant positions. This variance is offset partly by unfavourable Supp Labour ($1,587k) YTD.

  2. Planning Permit Application Fees – YTD $386k favourable due to both volume and Statutory fee increase effective 15 October – projected to be $463k favourable full year.

  3. Green Waste Disposal Cost – YTD $270k favourable – mainly due to lower tonnages in winter months.

  4. Fuels, Oils & Greases – YTD $168k favourable – lower than budgeted fuel prices.

  5. Interest Received – YTD $165k favourable due to higher investment balances.

  6. Commercial Collection Waste Disposal Income – YTD $106k favourable – additional customers.

Unfavourable Recurrent Variances:

  1. Waste Disposal Costs – due to the issue with the landfill auditor and the surcharge
    protection layer, diversion of waste to Wyndham had to be reinstated, an additional cost of approx $175k has been incurred YTD.

  2. Animal Pound Services – YTD $230k unfavourable – due to payment for asset contribution and interim fees whilst contract awarded and is expected to remain high and over budget as a reflection of the true costs of running the establishment in line with legislation, codes of practice and community expectations.

  3. Supplementary Labour – YTD $1,587k unfavourable – additional costs as an offset to favourable salary costs.


2. FINANCIAL STATEMENTS

2.1 DETAILED OPERATING STATEMENT
Report at 31 December 2016

Table showing8 columns of comparions figures

The Full Year projection is for an underlying surplus of $27.8m with the Recurrent result ($6.7m) or $0.3m favourable to the amended budget.


2.2 STATEMENT OF FINANCIAL POSITION
Report at 31 December 2016

Table with 5 columns detailing year-to-date costs

The movement in net assets of $40.3m versus prior year highlights a favourable movement in cash and receivables together with non-current assets growth.


2.3 STATEMENT OF CASH FLOWS
Report at 31 December 2016

Table with 4 columns detailing cash flow figures

The Closing net cash position at $15.8m highlights the lower than expected capital works expenditure and favourable operating performance variances relative to budget.

Cash flow trend line graph

3. OPERATING RESULTS – ANALYSIS

[image]

Analysis of Recurrent Revenue Variances

Revenue Stream

% Variance

Amount ($000)

Fav /
(Unfav)

Analysis

Rates and Charges

0.76%

782

Fav

Favourable rates growth, expected to be partly offset by objections in full year.

Government Grants

4.53%

1.117

Fav

Aged and Disability Services favourable State and Government funding.

Family Services State specific funding favourable offset by unfavourable Federal Child Care Assistance at the Whittington Centre.

Community Development favourable due to unbudgeted State Government Grants.

User Charges

(2.07)%

547

Unfav

Favourable variance in Commercial Waste Collection and Disposal. Unfavourable variance in subdivision application fees.

Unfavourable variance in subdivision application fees.

Family Services unfavourable Centre Based Long Day Care and Integrated Children Centres.

Aged and Disability unfavourable Disability Care Australia (addressed in report to Council and Council is not continuing as a service provider).

Aquatics Centres favourable due to success of learn to swim programs.

Other Fees and Charges

16.47%

1.065

Fav

Parking infringements favourable with a 25% increase in infringements issued offset by unfavourable Animal Infringements due to greater compliance with animal registrations.

Planning permit (volume and fee increase) and building applications favourable.

Sundry Income

10.94%

463

Fav

Sport and Recreation favourable due to Simmonds Stadium reimbursement of costs from Kardinia Park Stadium Trust which is offset by unbudgeted expenditure.

Interest Investments

15.21%

165

Fav

Higher than budgeted cash flows.


Image shows bar graph comparing ytd actual with ytd amended budget; and a table with these figures as another option

Analysis of Recurrent Expenditure Variance

Expenses

% Var

Amount

($000)

Fav / (Unfav)

Analysis

Salaries

4.42%

2,950

Fav

Salary Related Costs favourable (mainly relating to unfilled vacancies). Offset by Supplementary Labour ($1,587k) unfavourable

General Works - Plant/Equipment/
Vehicle Costs

5.23%

186

Fav

Fleet $188k fav – lower than budgeted fuel price

General Works - External Services

6.68%

2746

Fav

Significant favorable variance in Contractors due to Discretionary projects $2,788k favorable mainly in Community Development $236k, Enterprise Geelong $161k, Environment $236k, Planning Strategy $493k, Sport & Recreation $167k, Central Geelong & Waterfront $188k, Family Services $150k, Organizational Development $134k, Arts & Culture $119k, DCP’s $225, Central Geelong Action Plan $201k and Capital Projects $133k. Recurrent phasing variances of $836k favorable. Health & Local Laws unfavorable ($405k) (animal pound services $219k - due to having a high interim cost for service whilst the tender is awarded).

Administration

3.02%

175

Fav

Phasing

Professional Services

29.39%

779

Fav

Significant favorable variance in Consultants in Waste Services $225k, Planning Strategy $222k, Enterprise Geelong $102k, Strategy & Program Delivery $217k and Central Geelong Action Plan $189k. Unfavorable legal expenses in Health & Local laws ($113k) and City Development ($54k).

Utilities

34.65%

1,223

Fav

Invoices yet to be paid.


4. CAPITAL PROJECT ANALYSIS
As at 31 December 2016

Table below summarises gross expenditure, income and net expenditure compared to Projection.

 

Total Expenditure

$

Income

$

Net Expenditure

$

Year to Date Projection

45,592,799

8,987,951

36,604,848

Year to Date Actual

29,576,960

4,736,499

24,840,461

Variation Fav/(Unfav)

16,015,839

(4,251,452)

11,764,387


Actual expenditure to 31 December was $29.58m compared to $45.59m YTD Projection. Of the $16.01m underspent, $5.45m relates to new assets, $3.36m to asset renewals, $3.17m to asset upgrades and $4.01m to Special Rates & Charges.

Graph showing capital expenditure ytd by program category

Income received YTD was $4.74m compared to YTD Projection of $8.99m. The unfavourable variance was mainly due to grants for Federal Roads Program $1.06m, Central Geelong Advancement Fund $0.80m and Melaluka Rd Clubroom Upgrade $0.76m not yet received, plus behind schedule Special Rates & Charges income for Street Construction $0.57m.

Full year projection for gross capital expenditure as at December 2016 is currently $121.65m and capital income $28.82m. The Net projection of $92.83m is $13.28m favourable to amended budget.

It is proposed through cost reductions identified as part of the mid year Review that the net projection will be $91.92m which is a further reduction of $0.9m.

The anticipated full year carryover is $46.5m and will be analysed by Project as part of a detailed review and will be included in March Financial Management Report.


5. INVESTMENT PERFORMANCE
As at 31 December 2016

Council seeks to invest public funds in a manner that will provide the highest investment return with maximum security, whilst meeting daily cash flow demands of the City of Greater Geelong.

The cash balance as at 31 December 2016 is $69.8m with interest income of $1.1m versus budget of $0.9m. The Actual YTD interest return rate is 2.71% versus USB Aust Index Annualised Benchmark of 1.84%.

Cash Balance 31 December 2016 $69.8m

 

Budget Return YTD $ms

Actual Return YTD $ms

Variance

Fav/(Unfav)

Interest Income

0.9

1.1

0.2

YTD Interest Return

1.84%

2.71%

0.87%


Line graph showing council's actual investment return v budgeted return

Investment returns are trending as per 2015/16 actuals and favourable to budget.


6. FINANCIAL PERFORMANCE INDICATORS
As at 31 December 2016

[image]

TREND

 

 

✓

 

 

✗

 

 

 

 

✗

 

 

 

 

✓

 

 

 

 

 

 

✓

[Back to List]

Contents | Previous Page: Section A - Procedural Matters | Next Page: Section C - Assembly of Councillors