Council Minutes - Section B: Reports - 25 June 2019

Contents | Previous Page: Section A - Procedural Matters | Next Page: Section C - Notice of Motion

Reports tabled at the Ordinary Meeting of Council on Tuesday date held at the Council Conference and Reception Centre in City Hall, 57 Little Malop Street, Geelong.


  1. Declaration of 2019-2020 Rates, Adoption of Council Plan 2018-2022, Update 2019 and 2019-2020 Budget 

  2. Traffic Flow Movement and Congestion in Malop Street – Green Spine Area

  3. Amendment C372 – Hams Road, Waurn Ponds – Consideration of Submissions

  4. Revocation of Flood Prone Area Designation of New Lots at Ashbury Estate, Stages 8 and 10

  5. Procurement Policy Update

  6. Planning Authorisations – Council to Staff

  7. Audit and Risk Committee Summary Report (Confidential)

1. Declaration of 2019-2020 Rates, Adoption of Council Plan 2018-2022, Update 2019 and 2019-2020 Budget 

Source:

Customer & Corporate Services – Financial Services

Director:

Michael Dugina

Portfolio:

Finance


Purpose

  1. To adopt the Council Plan 2018-2020, Update 2019, declaration of 2019-2020 Rates and 2019-2020 Budget as proposed at Council meeting held on 30 April 2019, after consideration of budget submissions and any changes.


Background

  1. Under section 125 of the Local Government Act 1989 (Act), Council must prepare a Council Plan by 30 June 2018. The Council Plan identifies the objectives and priorities of Council. The Council Plan is the culmination of extensive consultation with councillors, the City and the community.

  2. In accordance with section 127 of the Act, Council is required to prepare a budget for each financial year and must ensure that it contains all required statements, reports and data as prescribed by the Act. Refer to Attachment 3 for an outline of these requirements.


Key Matters

  1. The Council Plan 2018-2020, Update 2019 and proposed 2019-2020 budget for the year commencing 1 July 2019 was considered by Council at its meeting on 30 April 2019 and public notice was given in accordance with section 129 of the Act.

  2. The Council Plan 2018-2020, Update 2019 and 2019-2020 budget has been prepared in accordance with the requirements of the Act and the Best Practice Guidelines that were developed by a Local Government industry taskforce.

  3. The Council Plan 2018-2020, Update 2019 (Attachment 3) includes:

    1. Strategic priorities (11) each with deliverables and measures.

    2. Overarching themes of sustainability, equity and community engagement.

    3. Support for the proposed 2019-2020 Budget, the Municipal Public Health and Wellbeing Plan and the regions long term Vision Greater Geelong; A Clever and Creative Future.

  4. The Proposed Budget (Attachment 3) includes:

    1. The budgeted Statements of Comprehensive Income, Cash Flows, Balance Sheet, Capital Works, Changes in Equity and Human Resources.

    2. The strategic objectives to be undertaken during the financial year and Service Performance Outcome Indicators in relation to each strategic objective.

    3. The relationship between the activities and initiatives in contributing to achieving the strategic objectives specified in the Council Plan and,

    4. Details of the activities and initiatives to be funded in the budget.

    5. As required under the Act a schedule declares the differential rates and charges.

  5. The Rating Strategy 2019-2020 (Attachment 4)

    1. The Rating Strategy document has been updated to reflect the outcome of Council’s budget deliberations and the resetting of rate in the dollar based on final 2019 revaluation figures.

    2. Rates and charges are the major source of council revenue accounting for 62.8% of the total council revenue annually. An increase in rate income is required to meet the objectives of council aspirations and community expectations for new infrastructure.

    3. The Minister for Local Government announced on 20 December 2018 that the 2019-2020 rate cap would be 2.5% for all Victorian councils.

    4. Not all council charges are included in the rate cap calculation.

      Rates and the Municipal charge are included in the rate cap calculation.

      The waste charge and the Fire Services Property Levy are not included in the rate cap calculation.

    5. The 2018-2019 base average rate is calculated as $1,557.54 and the 2019-2020 Budget proposes this will increase by 2.5% to $1,596.51.

    6. The average residential rates for 2019-2020 is:

    7. Residential Properties

      2018-2019

      2019-2020

      Increase %

      Rates on Average

      Budget Rates on Average

      CIV $

      CIV $

      General Rates CIV x Rate in $

      1,151.90

      1,180.70

      2.5%

      Municipal Charge

      102.00

      105.25

      3.2%

      Total Rates including Municipal Charge

      1,253.90

      1,285.95

      2.6%

      Waste Collection Service

      316.90

      332.00

      4.8%

      Total Rates & Charges

      1,570.80

      1,617.95

      3.0%


  6. Rate Waiver

    1. Council declares a waiver under section 171 of the Act for residential land and farm land properties where the valuation of the assessment has increased between the 2018 valuation and the 2019 valuation by 50% or more and that increase is purely attributable to market factors, not attributable, in whole or in part, to improvements made to the assessment by the owner (or occupier). The amount of the waiver be set at:

      between 25% and 49.99% of the general rates payable for the 2019-2020 financial year, increasing pro rata according to the valuation increase, for valuation increases between 50% and 59.99%; and

      50% of the general rate payable for the 2019-2020 financial year for valuation increases of 60% or more.

    2. The waiver is designed to mitigate the impact of significant valuation increases for ratepayers who can demonstrate low income status (maximum income of $53,728 and owned the property for both valuation periods).

    3. Council declare a Housing Support waiver under section 171 of the Act of 100% of general rates and municipal charge for the following types of housing; transitional, emergency, crisis housing, housing for legatees or war widows provided by the Geelong Legacy Club or provided by RSL, and supported housing for people with a disability.

    4. This waiver recognises that these properties provide specific needs within the community. Application can be made to council to have land classified as being eligible for the waiver.

    5. The New Corio Estate is an old and inappropriate subdivision within an established farming zone in Corio. Since the land is zoned as farming land it cannot be developed for residential use with no services available for the area.

    6. There is no prospect of these services becoming available in the future. In addition, environment reports in recent years have shown that the land contains significant native vegetation which Council is obligated to protect for future generations. Council adopted Planning Scheme amendment C243 which formally protects the native vegetation and provides some certainty over the future of the land. This amendment was approved by the Minister of Environment & Climate Control on 30 April 2013.

    7. From 2013-14 Council declared a waiver under section 171 of the Act of 100% of general rates and municipal charge for privately owned properties in the New Corio Estate. This rates assistance waiver recognises the financial burden associated with ownership of the land and the encumbrances that prevents property owners from making any demands on Council services now and into the future.

  7. Rate Structure

    1. Council has 11 rating or tariff groups with the application of differential rates to each of these groups in accordance with section 161 of the Act. The finalised Ministerial Guidelines for Differential Rating were gazetted on 26 April 2013 and came into effect from 1 July 2013. The intention of the guidelines is to provide clarity, consistency and transparency. Council is required to consider the objectives, the suitable uses and the types of classes of land when introducing a differential rate. The guidelines establish three groups of types and classes of land categories for differential rates – those which are considered ‘appropriate’, those which must be ‘carefully considered’ by a council and those which would ‘not be appropriate’.

  8. The Rating Strategy for 2019-2020 (Attachment 4) contains the Council Policy, Procedure, rate assistance and information on the City’s approach to the raising of property rates updated to reflect the outcome of Council’s budget deliberations.

  9. At the Council meeting held on 30 April 2019 a Submissions Hearing Panel was appointed to hear submissions made in relation to the Council Plan and Proposed Budget.

  10. A Submissions Hearing Panel hearing was held on Wednesday, 5 June 2019. The panel comprised of Councillor S Asher (Chair), Councillor K Grzybek, Councillor S Mansfield, Councillor J Mason, Councillor P Murnane and Councillor P Murrihy. The Submissions Hearing Panel heard 11 submitters, reviewed 52 submissions and recommended no change to the budget. (Refer Attachment 5).

Councillor Murnane moved, Councillor Aitken seconded:

  1. That Council

    1. Adopt the proposed budget considered by Council on 30 April 2019 after:

      1. having considered all submissions lodged, together with the report of the Submissions Hearing Panel (Attachment 5); and

      2. the resetting of the rate in the dollar based on final revaluation for 2019,

      3. (the 2019-2020 Budget).

    2. Adopt the 2018-2020 Council Plan, Update 2019 and Rate Declaration.

    3. Give public notice of the decision to adopt the 2018-2020 Council Plan, Update 2019 and 2019-2020 Budget and Rate Declaration in accordance with the Act.

    4. Pursuant to section 171 (4)(f) of the Act, Council resolves to treat any persons who has successfully applied for and been granted a pension waiver of rates as having made a continuing application for such waiver, unless the person advises otherwise.

    5. Adopt the Rating Strategy 2019-2020 (Attachment 4).

    6. Declare the amount of rates and charges intended to be raised as follows:

      1. Amount intended to be raised by General Rates, Municipal Charge, and Annual Service Charge for the period 1 July 2019 - 30 June 2020;

      2. An amount of $237,685,462 be declared as the amount which Council intends to raise by General Rates, Municipal Charge and the Annual Service Charge, which amount is calculated as follows;

      3. General Rates $186,797,071;

      4. Municipal Charge $13,254,531; and

      5. Annual Service Charge $37,633,860.

    7. Declare that rates, rating differential and charges for the period 1 July 2019 to 30 June 2020 confirm with Council’s Rating Strategy and will be applied as outlined in section 4.1 of the 2019-2020 Annual Budget.

    8. Note that general rates must be paid in full by 15th February 2020 or by four instalments made on or before the following dates:

      1. Instalment 1 – 30 September 2019

      2. Instalment 2 – 30 November 2019

      3. Instalment 3 – 29 February 2020

      4. Instalment 4 – 31 May 2020

    9. Require that any person pay interest on any amounts of rates and charges which:

      1. That person is liable to pay; and

      2. Have not been paid by the dates specified for their payment.

    10. Authorise the Manager Financial Services to levy and recover the general rates and service charges in accordance with the Local Government Act 1989.


Attachment 1

Discussion

  1. Following consideration by Council of the Proposed Budget, an advertisement was placed in the Geelong Advertiser advising that the budget document would be available for public scrutiny and inviting written submissions to be made.

  2. The Submissions Hearing Panel met on Wednesday, 5 June 2019 at 6:15pm to consider written submissions and hear any person who wished to address the Panel in support of their submission.

  3. In respect to the Council Plan the submissions panel recommended (Attachment 5) no change to the Council Plan Update 2019.

  4. The recommendation from the Submissions panel (Attachment 5) was not to propose any changes to the proposed budget adopted by Council on the 30 April 2019. However the following changes have been made to the Budget in response to recent announcements.

  5. Capital Program

    1. Project managers have provided an updated assessment of the 2018-2019 Capital works program. The timing of project delivery now requires an additional $1.3 million or $27.8 million of capital carryover from 2018-2019 to 2019-2020, which means the 2019-2020 Capital project expenditure has risen by $1.3 million to $117 million.

  6. Fire Services Property Levy – 2019-2020 rates

    1. Council collects the Fire Services Property Levy (FSPL) on behalf of the State Government via the Council rate notice. The FSPL rates were announced on 31 May 2019 with an increase of 1.8% for the fixed residential charge and an increase of (13.8%) for the residential variable charge. The fixed charge for Primary Production, Commercial, Industrial, Public Benefit and Vacant has increased by 2.3%. The variable charges have increased by 15.9% for Primary Production, 15.1% for Commercial, 13.8% for Public Benefit 13.2% for Vacant and decreased by (8.1%) for Industrial.

    2. The impact to the rate notice for the average residential ratepayer is as follows:

Fire Services Property Levy

2018-2019 Rates on Average CIV $

2019-2020 Budget Rates on Average CIV $

 

Fixed

109.00

111.00

1.8%

Variable

22.01

36.05

28.7%

 

137.01

147.05

7.3%



Attachment 2

Financial Implications

  1. The budget has been prepared in compliance with Rate Cap legislation and Ministerial announcement that the cap is 2.50% for 2019-2020. Changes in rates, fees and charges have been structured to meet the financial requirements as proposed for the 2019-2020 financial year.

  2. Expenditure includes the continuation of council services to the community.

  3. The budget includes a recurrent operating surplus of $1.4 million.

  4. The capital program forecasts expenditure of $117 millionn 2019-2020. This includes carryover project funding from 2018-2019 for incomplete projects of $27.8 million (previously $26.5 million), $111.4 million of new project funding with $22.3 forecast to carry-over into 2020-2021.

  5. New loans of $35.3 million are proposed for 2019-2020 including $6.4 million deferred loans from 2018-2019. The projected total amount of borrowings as at 30 June 2020 is $91.8 million.


Community Engagement

  1. Following adoption of the proposed budget on 30 April 2019 a process of community engagement has been undertaken with a total of 52 submissions received. These submissions were considered at a hearing on 5 June 2019.

  2. A number of actions were initiated in response to these submissions which will be outlined in formal responses provided to each submitter (refer Attachment 5).

  3. In accordance with requirements under the Act, once the budget is adopted, a public notice will be placed in the newspaper on Wednesday, 26 June 2019, advising the adoption of the 2019-2020 Budget, Council Plan 2018-2020 Update 2019, along with the Declaration of the Rates.


Social Equity Considerations

  1. The proposed budget identifies the sources and allocation of resources to implement the many social initiatives that impact on the community.


Policy/Legal/Statutory Implications

  1. The annual budget is prepared to comply with the requirements of the Local Government Act 1989 and the Local Government (Planning and Reporting) Regulations 2014. The process also recognises the need to align the annual budget to the direction and allocation of resources identified within the proposed Council Plan.


Alignment to Council Plan

  1. This report identifies the activities the City will undertake in 2019-2022 which are aligned to achieving the priorities in Council Plan 2018-2020.


Conflict of Interest

  1. No council officer involved in the preparation of this report has a direct or indirect interest in any matter to which this report relates.


Risk Assessment

  1. Under section 130 of the Act Council must adopt the annual budget by 30 June each year.

  2. The budget has been developed in accordance with a timetable to ensure sufficient time to achieve 30 June adoption. This includes time for community consultation, meetings of the executive and council to prepare the 2018-2020 Council Plan Update 2019 and 2019-2020 Budget. The timetable provides a framework to manage risk in order for Council to meet its statutory obligations and avoid adverse implications if the process is delayed.


Environmental Implications

  1. The budget identifies the sources and allocation of the resources to implement the many environmental initiatives that impact on the community as outlined with Council Plan 2018-2020.


Attachment 3

2018-2020 COUNCIL PLAN UPDATE 2019 AND 2019-2020 ANNUAL BUDGET


Attachment 4

2019-2020 RATING STRATEGY


Attachment 5 - Minutes

Budget and Council Plan Submissions Hearing Panel

Held in Council Chamber
Council Conference and Reception Centre
City Hall, 30 Gheringhap Street, Geelong
on Wednesday, 5 June 2019
Following completion of Panel Hearing

Present:

Also Present:

The hearing commenced at 6:06pm and closed at 8:03pm.


Councillor Asher chaired the hearing of public submissions.


Apologies:

Councillor Bruce Harwood, Councillor Eddy Kontelj, Councillor Trent Sullivan, Councillor Anthony Aitken, Councillor Ron Nelson.


Apologies from submitters:

Ms Kathryn Arndt (Victorian Local Governance Association membership) Mr Bo Li attended and spoke to the submission on behalf of Ms Arndt.                           


Declarations of Interest or Conflicts of Interest:

Councillor Asher declared direct interest with Item 5 - Agribusiness Strategy Implementation

Councillor Grzybek declared direct interest with Item 10 – Building Better Bike Connections.

Councillor Murrihy Declared a direct interest with Item 17 – St Mary’s Sports Club redevelopment of facilities.


Items considered:

On 30 April 2019 Council gave notice of intention to adopt the 2018-2020 Council Plan Update 2019-2020 and Proposed Budget 2019-2020. Council received 52 submissions in relation to the Council Plan and Proposed Budget. Submissions have been listed by topic and name of the submitter as follows.

Topic No.

Topic

Submitters Name

1

Newcomb Streetscape Improvements

Ms Miranda Hurley

2

Cycling Path East Geelong / Belmont

Ms Miranda Hurley

3

Car Parking

Ms Cassandra Rabich

 

- Proposed Fee Increase

Ms Zoe Sells

 

- Car Parking Permits

Ms Leanne Yearsley

 

- Central Geelong Parking

Ms Jeanette Connolly

 

 

Ms Jo-anne Duffield

 

 

Ms Irene Kadenbach

 

 

Mr Andrew Craddock

 

 

Mr Steve Sowden

 

 

Mr Jason Wilde

 

 

Ms Renee Gaulke

 

 

Ms Kim Blair

 

 

Mr Brian Happ

 

 

Ms Shelley Christy

 

 

Ms Vicki Maroulis

 

 

Ms Stephanie Wood

 

 

Ms Helen Donnelly

 

 

Ms Renee Brenner

 

 

Ms Ruby Burns

 

 

Ms Meredith Fletcher

 

 

Mr Joel Harbour

 

 

Mr Iliya Ilievski

 

 

Ms Gail Croft

 

 

Ms Janet Taylor

4

Little Malop Street Mall Improvements

Mr Michael Inturissi

 

 

Ms Jacqui Hart

 

 

Ms Dannielle Menz

 

 

Ms Jeanette Connolly

 

 

Mr Braden McKay

5

Agribusiness Strategy Implementation

Bill Winter

6

Funding for Indented Head

- General Infrastructure

- Footpath Infrastructure

- Indented Head Woodland

Ms Ingrid Novosel

7

Waste Management Initiatives

Mr Ryan Mischkulnig

8

Rates Increase

Mr Rod Hodson

9

Portarlington Recreation Reserve

Ms Judith Bracken

10

Building Better Bike Connections

Ms Monique Connell

11

Proposed consolidation of Maternal Child Health Centres

Ms Monique Connell

12

Improvements to Beach Road, Avalon Locale

Mr Justin Giddings

13

Barwon Heads Football & Netball – Ground Maintenance

Mr Tim Goddard

14

Funding for Heritage operations and activities

Mr Ian Morris

 

Off street parking in residential developments

Mr John Brockway

16

Kevin Hoffman Walk Stewardship

Mr Greg Wilson

17

St Mary’s Sports Club redevelopment of facilities

Mr Kevin McMahon

18

Tree scaping and Traffic Management in Geelong West

Ms Jacqueline Edge

19

Victorian Local Governance Association membership

Ms Kathryn Arndt

20

Cunningham Pier car park upgrade

Mr Murray Rance

21

Footpath Infrastructure in Grovedale

Ms Sarah Roberts

22

Geelong Gallery expansion to City Hall space

Mr Jason Smith

23

Collendina Reserve multi-purpose pavilion

Mr Steven Bishop


Late submissions were received as follows:

Topic No.

Topic

Submitters Name

24

General Commentary on Budget

Ms A L Chalmers OAM

25

Feasibility Study – Chilwell Community Hub

Ms Lynne Dowling


List of submitters who addressed the panel:

Submitters Name

Topic

Mr Andrew Elliott

Improvements to Beach Road, Avalon Locale

Mr Tim Goddard

Barwon Heads Football & Netball – Ground Maintenance

Mr Greg Wilson

Kevin Hoffman Walk Stewardship

Mr Kevin McMahon

St Mary’s Sports Club redevelopment of facilities (Councillor Murrihy left the room for this item)

Mr Bo Li

Victorian Local Governance Association membership

Mr Murray Rance

Cunningham Pier car park upgrade

Ms Sarah Roberts

Footpath Infrastructure in Grovedale

Mr Jason Smith

Geelong Gallery expansion to City Hall space

Mr Steven Bishop

Collendina Reserve multi-purpose pavilion

Ms Lynne Dowling

Feasibility Study – Chilwell Community Hub

Ms Jacqueline Edge

Tree scaping and Traffic Management in Geelong West



PANEL CONSIDERATION OF SUBMISSIONS MADE TO THE COUNCIL PLAN 2018-2020, UPDATE 2019-2020 AND PROPOSED 2019-2020 BUDGET

Source:

Customer & Corporate Services - Financial Services

Director:

Michael Dugina

Report To:

Council Meeting

Portfolio

Finance


Purpose

  1. The purpose of the Council Plan and Budget Submission Hearing Panel is to consider all submissions received and make a recommendation whether to change the Council Plan 2018-2020, Update 2019-2020 or the 2019-2020 Budget.


Background

  1. Council adopted the 2018-20 Council Plan, Update 2019 and the 2019-2020 Proposed Budget on 30 April 2019. In accordance with the requirements of the Local Government Act, the proposed Council Plan update and Budget was advertised and invited submissions for a 28 day consultation period. The submission period closed on Tuesday, 28 May 2019 at 5:00pm.

  2. The submissions hearing panel met on Wednesday 5 June 2019 at 6:00pm to consider the submissions. All submitters have been invited to attend the panel hearing and to briefly speak to their submission.

  3. Council will receive a report from the submissions panel and consider recommendations as part of adopting the 2018-2020 Council Plan, Update 2019 and 2019-2020 Budget. This meeting is scheduled on Tuesday 25 June 2019 at 6:00pm.


Key Matters

  1. Council received 52 written submissions in relation to the Council Plan update and budget. Two submissions were received after the submission deadline. Submissions have been grouped under each topic raised, listing the name of the submitter (refer Attachment 1), see a full list of submissions in order of receipt at Attachment 3. All submitters have received an acknowledgement of their submission and invited to attend the panel hearing in order to speak to their submission.

  2. The Submissions Hearing Panel heard 11 submitters and reviewed 52 submission and recommended no change to the budget.


Recommendation

  1. That the Panel, having heard all submitters and considered the submissions made in respect of the proposed 2019-2020 Budget and Council Plan Update, recommend that Council:

    1. Adopt the proposed 2019-2020 Budget and Council Plan without change;

    2. Ensure that all submitters be thanked for their submission and be individually advised in writing of the submission outcome resulting from the Panel Hearing.


Attachment 1

Topic No.

Topic

Submitters Name

Action/Recommendation

1

Newcomb Streetscape Improvements

Ms Miranda Hurley

No change to Budget

2

Cycling Path East Geelong / Belmont

Ms Miranda Hurley

No change to Budget

3

Car Parking

Ms Cassandra Rabich

No change to Budget

 

- Proposed Fee Increase

Ms Zoe Sells

 

- Car Parking Permits

Ms Leanne Yearsley

 

- Central Geelong Parking

Ms Jeanette Connolly

 

 

Ms Jo-anne Duffield

 

 

Ms Irene Kadenbach

 

 

Mr Andrew Craddock

 

 

Mr Steve Sowden

 

 

Mr Jason Wilde

 

 

Ms Renee Gaulke

 

 

Ms Kim Blair

 

 

Mr Brian Happ

 

 

Ms Shelley Christy

 

 

Ms Vicki Maroulis

 

 

Ms Stephanie Wood

 

 

Ms Helen Donnelly

 

 

Ms Renee Brenner

 

 

Ms Ruby Burns

 

 

Ms Meredith Fletcher

 

 

Mr Joel Harbour

 

 

Mr Iliya Ilievski

 

 

Ms Gail Croft

 

 

Ms Janet Taylor

4

Little Malop Street Mall Improvements

Mr Michael Inturissi

No change to Budget

 

 

Ms Jacqui Hart

 

 

Ms Dannielle Menz

 

 

Ms Jeanette Connolly

 

 

Mr Braden McKay

5

Agribusiness Strategy Implementation

Bill Winter

No change to Budget

6

Funding for Indented Head

- General Infrastructure

- Footpath Infrastructure

- Indented Head Woodland

Ms Ingrid Novosel

No change to Budget

7

Waste Management Initiatives

Mr Ryan Mischkulnig

No change to Budget

8

Rates Increase

Mr Rod Hodson

No change to Budget

9

Portarlington Recreation Reserve

Ms Judith Bracken

No change to Budget

10

Building Better Bike Connections

Ms Monique Connell

No change to Budget

11

Proposed consolidation of Maternal Child Health Centres

Ms Monique Connell

No change to Budget

12

Improvements to Beach Road, Avalon Locale

Mr Justin Giddings

No change to Budget

13

Barwon Heads Football & Netball – Ground Maintenance

Mr Tim Goddard

By December 2019, request the CEO provide Council with a report assessing potential options for supporting the Barwon Heads Football club, which also gives consideration to any other potential impacts for other public facilities on crown land not managed by Council.

14

Funding for Heritage operations and activities

Mr Ian Morris

No change to Budget

15

Off street parking in residential developments

Mr John Brockway

No change to Budget

16

Kevin Hoffman Walk Stewardship

Mr Greg Wilson

Identify opportunities for support. / No change to Budget

17

St Mary’s Sports Club redevelopment of facilities

Mr Kevin McMahon

No change to Budget

18

Tree scaping and Traffic Management in Geelong West

Ms Jacqueline Edge

Refer to City Works Team to identify Tree Scaping Opportunities within Budget / No change to Budget

19

Victorian Local Governance Association membership

Ms Kathryn Arndt

No change to Budget

20

Cunningham Pier car park upgrade

Mr Murray Rance

No change to Budget

21

Footpath Infrastructure in Grovedale

Ms Sarah Roberts

Refer to City Works Footpath and Road prioritisation report planned for Council in 2019 / No change to Budget

22

Geelong Gallery expansion to City Hall space

Mr Jason Smith

By December 2019, request the CEO provide Council with

a report considering the use of City Hall, in particular by the Geelong Art Gallery.

23

Collendina Reserve multi-purpose pavilion

Mr Steven Bishop

Referred to Community Infrastructure Grants Scheme


Late submissions were received as follows:

Topic No.

Topic

Submitters Name

Action/Recommendation

24

General Commentary on Budget

Ms A L Chalmers OAM

No change to Budget

25

Feasibility Study – Chilwell Community Hub

Ms Lynne Dowling

No change to Budget



Attachment 2

1. & 2. MIRANDA HURLEY – NEWCOMB STREETSCAPE IMPROVEMENTS AND CYCLING PATH EAST GEELONG TO BELMONT

Ms Miranda Hurley provides a submission in response to the proposed 2019-2020 Budget. The submission requests budget funding for deciduous tree plantings on nature strips in Newcomb to create treed environs in the neighbourhood. Additionally, a request that the budget fund provision of a usable cycling / walking path from Geelong to Belmont via Breakwater Road.

Officer Comments

The City has received requests for the construction of a footpath on Breakwater Road past the Racecourse and Geelong Showgrounds. The request is on our Footpath Customer Commitments register and will be considered for inclusion in the 2020-2021 Budget. Breakwater Road is an identified on-road principal bicycle network route. The Barwon River Trail provides connections between East Geelong over Breakwater Road bridge to the Belmont cycle paths along the Waurn Ponds Creek. The City is also undertaking a Shared Trails Masterplan to refine the existing planned and existing routes for walking and cycling, which will be open for community engagement later this year.

As a part of Councils Urban Forest Strategy suburbs with low canopy, high heat and social vulnerability such as Whittington and Corio have been prioritised for street tree planting. Councils focus has been the higher priority areas and early indicators have shown improved canopy coverage and increased density of tree planting.

Newcomb and Moolap as surrounding suburbs have also been identified as a higher priority tree planting area within the Urban Forest Strategy and are anticipated to have tree planting within the next 3-5 years.

To achieve this, approximately 1,200 trees will need to be planted with species selected for tolerance to climate change, canopy cover and suitability for their planting location. Currently planting is limited to ‘by request’ only as we continue to progress with our primary tree planting program in Corio.


3. CAR PARKING - PROPOSED FEE INCREASE, PARKING PERMITS, CENTRAL GEELONG PARKING

Submissions responding to the proposed 2019-2020 Budget were received from: Ms Cassandra Rabich, Ms Zoe Sells, Ms Leanne Yearsley, Ms Jo-anne Duffield, Ms Irene Kadenbach, Mr Steve Sowden, Mr Jason Wilde, Mr Andrew Craddock, Ms Renee Gaulke, Ms Helen Donnelly, Ms Stephanie Wood, Ms Vicki Maroulis, Ms Shelley Christy, Mr Brian Happ, Ms Kim Blair, Ms Jeanette Connelly, Ms Renee Brenner, Ms Ruby Burns, Ms Meredith Fletcher, Mr Joel Harbour, Mr Iliya Ilievski, Ms Gail Croft and Ms Janet Taylor.

The submissions object to the proposed increase in car parking fees for Council owned car parks.

Officer Comments

Proposed Fee Increase

With the growth of the Geelong CBD, we are experiencing a shortage of all day car parking options. This is a direct result of the increase in demand far exceeding the available supply.

As a result, new car parking options are being offered by commercial providers at a higher daily and monthly rate than the CBD has experienced before.

To ensure the City is not undercutting this growing competitive market, we are aiming to ensure competitive neutrality with new and existing providers within our CBD. We are doing this by increasing our fees over a two year period to a level consistent with other providers and councils.

The best way to attract additional commercial car parking providers to Geelong is to ensure the market is fair and reasonable.

Use of shared car parking permits

The City is not in a position to issue two car park access permits for the capacity of one space. Not only is this bad practice from an audit perspective, it effectively has the potential to enable existing permit holders to establish their own permit management process, waiting list and usage patterns, which significantly impacts on councils ability to manage the capacity of the car park and the integrity of our waiting list in a transparent manner. We are not opposed to a permit holder sharing their permit with someone else but will not be involved in that process as it is the onus of those concerned to make the arrangement work for both parties.

The option of applying pro-rata charges is not available to us from a technical perspective. The choice of experiencing a minor level of inconvenience for the benefit of gaining access to a car park space is a choice that needs to be made by the person involved.

Central Geelong Parking

Whilst undertaking Greater Geelong - A Clever and Creative Future in 2016 and 2017, more than 16,000 people from our community told us what they valued about our region and how they rated it against the recognised elements of a successful community. They told us about their aspirations for our future city. One of those key aspirations was ‘A fast, reliable and connected transport network’.

Parking is a key aspect of the transport equation and a major issue for cities globally. In Geelong, more than 80% of daily CBD commuters drive as single occupants in vehicles, leaving their cars sitting vacant in car parking spaces all day. Additionally, many of these commuters are travelling from less than two kilometres away.

This behaviour has a profound impact on our transport system and our city streets. More than 30% of the land in Central Geelong is asphalt for vehicles. City space is not infinite, so smarter and more effective methods for moving people in, out and around Central Geelong must be developed and embraced by the community.

We are fortunate to live in a wonderful city, on one of the only north facing bays in Australia and in proximity to some of the most visited and beautiful destinations. Geelong is considered one of the most liveable regional cities and we need to protect its liveability for future generations.

We recently completed a 100-day community engagement relating to car parking in Central Geelong. One aspect of this engagement was a discussion paper and survey. More than 2,600 responses were received from the community both on line and in person, with data collected throughout the municipality from residents and visitors. The results of this survey are currently being assessed and will be used to inform a draft Central Geelong Parking Strategy which will be released for public engagement later in 2019.

The City are currently working with the State Government regarding the Transport Planning within and around Central Geelong, which includes the location and routes of buses.

Improved parking options for Central Geelong workers will be considered as part of the Central Geelong Parking Strategy which will be released for engagement late in 2019.

The Central Geelong Parking Strategy will not be undertaken in isolation to other transport solutions. With the State Government and other major agencies including Transport for Victoria and VicRoads, we are also progressing the:

All these projects have links to each other and will all work together to deliver important transport solutions for Geelong.

Even though the currently engagement is closed, you can still view a short video and read our Central Geelong Car Parking Discussion paper.

We continue to explore options to improve both transport and amenity outcomes in Central Geelong.


4. LITTLE MALOP STREET MALL IMPROVEMENTS

Submissions in response to the proposed 2019-2020 Budget were received from Mr Michael Inturrisi, Ms Jacqui Hart, Ms Dannielle Menz, Braden McKay and Ms Jeanette Connolly. The submissions recommend improvements to public space to address antisocial behaviour and safety in the Little Malop Street mall area and Moorabool Street bus interchange.

Officer Comments

Lt Malop Central and the Moorabool Street bus stops

Everyone experiences the Mall in different ways, depending on age, gender and cultural background. Everyone has the right to be in the Mall and to feel safe and comfortable. Anti-social behaviour and the perception that the space is generally unsafe is an issue in the Mall that both Council and Victoria Police have been working together to address. There is a strong community perception that the Mall is unsafe, however only one reported incident of ‘crimes against a person’ has been reported since 2014.

The G21 Regional Justice Reference Group has facilitated a sub-committee comprising of representatives from the City of Greater Geelong, Victoria Police, G21 Geelong Region Alliance, Barwon Adolescent Taskforce, Market Square Management, Geelong Chamber of Commerce, Sexual Assault and Family Violence Centre, Department of Justice and Community Safety, Department of Health and Human Services, Department of Environment, Land, Water and Planning and Public Transport Victoria.

The sub-committee takes a collaborative and socially responsible approach to address some of the perceived community safety issues, anti-social behaviour and the societal issues relating to homelessness and rough sleepers in and around the Mall that is experienced in almost every community in Australia and around the world.

Emerging issues have been investigated and a variety of activities have been embarked upon. Victoria Police and City of Greater Geelong, in conjunction with other social agencies, continue to have a strong presence in the area and intervention through a variety of activities and strategies that actively engage with users and the broader community.

Central Geelong Revitalisation Partnership and the State Action Plan

The Revitalising Central Geelong Action Plan is a partnership between the City and Victorian Government to drive change in Central Geelong. This long term strategic plan endeavours to have a positive impact on the Geelong CBD as a whole, including this precinct. Lt Malop Central (‘the Mall’) and the bus stops in Moorabool Street will both be redeveloped as part of the Revitalising Central Geelong Action Plan.

To commence the redevelopment, Councillors have been asked to allocate $250,000 in the 2019-2020 financial year to allow officers to undertake a comprehensive master plan and produce design and construction documentation for the rebuilding of Lt Malop St between Moorabool Street and Yarra Street (the Mall). A recent Crime Prevention Through Environmental Design (CPTED) assessment identified a number of physical, environmental and built-form factors that contribute to issues of anti-social behaviour and low public perceptions of safety. Redeveloping the area with more active edges (and fully tenanted shops with the cooperation of Market Square) will assist in addressing most of these issues in conjunction with collaborative projects by other agencies.

The Transport Network Operating Plan currently being developed through the State Action Plan will also address the ‘cluster’ of bus stops in Moorabool St, the concentration of people often leading to aggression and anti-social behaviour.

Further information can be found at: Revitalising Central Geelong; and Planning - Revitalising Central Geelong Action Plan.


City of Greater Geelong led activities

The City’s Place Activation Central Geelong implements and facilitates a range of activities and entertainment initiatives to help create unique, exciting and dynamic public spaces that encourage community pride and increase pedestrian traffic.

Annually, over 500 on-street performances ranging from Food Truck Friday, school holiday activities, musical performances, giant games, busking competitions and workshops provide 1,345 hours of free community activity in the Mall.

More than 50 permits are issued annually to commercial and community groups who are encouraged to utilise the space. Youth and targeted outreach engagement and mentoring activities are provided and supported within the area.

Pedestrian Counting technology has been introduced to help assess and provide consistent data regarding the usage and value of activities in the area. Over time this data will provide useful trend information to aid evaluation and future planning.

CCTV is provided by the City to enable live monitoring of the area at the Geelong Police Station which provides a valuable tool for police in dealing with anti-social behaviour and the potential apprehension and prosecution of offenders.

Cleaning services are provided seven days a week to ensure the area remains clean and well presented at all times. Service levels are reviewed regularly to deliver additional top up cleaning when necessary.

The City of Greater Geelong has recently received funding from the Victorian Government to develop a Social Housing Strategy which will provide a plan that outlines options and opportunities to impact on affordable housing and assist with rough sleepers and homelessness in our community.

The City will continue liaison and support with key stakeholders and adjacent property owners and operators.

Victoria Police led activities

Victoria Police have a regular active presence in the Mall area. The City Safe Operations include a strong physical Police presence including officers on daily foot patrols, bicycles, mounted Police and Police vehicles on site.

Coffee with a Cop is an ongoing initiative that is occurring throughout the Geelong Police Service Area. Local Police regularly host, Coffee with a Cop, in the Mall which enables members of the public to talk with local officers in an informal setting.

Recent legislation changes have enabled Protective Service Officers to monitor and patrol the Mall and the bus stops in Moorabool Street.

As mentioned earlier, Safe City CCTV cameras are located in various areas within the Mall precinct and Geelong CBD. These are monitored within Geelong Police Station.

The Council, Victoria Police and the G21 Regional Justice Reference Group meets regularly to determine:

Victoria Police maintain regular informal contact with traders in the precinct. Their Community Engagement Unit provide business security audits to assist traders to identifying security issues and seek opportunities to install crime prevention measures.

Council, the agencies outlined above and major stakeholders will continue to work together to deliver a public space that is worthy of our community.


5. BILL WINTER - AGRIBUSINESS IMPLEMENTATION STRATEGY

Mr Bill Winter on behalf of Food and Agribusiness Network, G21 Region provides a submission in response to the proposed 2019-2020 Budget. Submission notes the omission in the proposed 2019-2020 budget of $60k for funding the Agribusiness Strategy implementation.

Officer Comments

The City has provided funding to support the Agribusiness sector to the value of $220,000 over the last three years. The last two years funding has been used and leveraged to support the delivery of priority actions in the Agribusiness strategy for the G21 region. Mr Winter rightly identifies the development of a web portal for the agribusiness sector, supporting showcase events, and progressing collaborative new products and services delivering new jobs and investment to the region.

The City is pleased with the productive and collaborative partnership with the AgriCollective in support of the implementation of the Sustainable Agribusiness Strategy for the G21 region, 2017-22. The Agri Collective are a key member of the Implementation Strategy Group which also includes G21 Regional Partnership, Geelong Food Cluster, Industry, Golden Plains Shire, Surf Coast shire , Colac Otway Shire, Agriculture Victoria and Regional Development Victoria. This group is led by CoGG.

The Economic Development budget does provide some flexibility to support priority industry growth projects that deliver jobs, investment or building business capacity activities in the region. At this time there is no specific line item in the budget to support Agribusiness.

It should be noted that there is no line item for incubator services of $150,000 in the 2019-2020 Budget as identified by Mr Winter in his submission.


6. INGRID NOVOSEL – FUNDING FOR INDENTED HEAD -– GENERAL INFRASTRUCTURE, FOOTPATH INFRASTRUCTURE AND INDENTED HEAD WOODLAND

Ms Ingrid Novosel provides three submissions in response to the proposed 2019-2020 Budget. The submissions note the absence of funding for footpaths and general infrastructure in Indented Head and the absence of funding in the 2019-2020 Budget for the preparation of a land management plan and maintenance of the Indented Head Woodland.

Officer Comments

An allocation of $1.2m is included in the budget for the construction of new footpaths across the municipality. Priority paths are assessed for inclusion in the program. The nominated paths in Indented Head by the Locomote walkability group have been assessed and are not listed within the 2019-2020 program. Murradoc Road, St Leonards, identified by Locomote, has been allocated funding for the construction of a footpath along the south side of Murradoc Road from the shopping centre to the bowling club.

Indented Head Woodland was included in the Environment Reserves Budget. Completing the Master Plan is a priority project and will be funded from this budget.


7. RYAN MISCHKULNIG – WASTE MANAGEMENT INITIATIVES

Mr Ryan Mischkulnig provides a submission in response to the 2018-2020 Council Plan, Update 2019. Supportive comments from Mr Mischkulnig on current waste management processes were noted.

The submission offers a suggestion to investigate waste stream opportunities based on a circular economy methodology.

Officer Comments

The City thanks Mr Mischkulnig for his support and suggestion. While maintaining Council’s responsibility in providing waste services to our residents and visitors, the City also supports and helps promote resource recovery opportunities that can make a difference to environmental sustainability. As such we operate two Resource Recovery Centres and also other facilities where residents can dispose of their items for recycling or reuse.

The City has been working with the community and stakeholders to develop a new Waste and Resource Recovery Strategy. This strategic document will guide Geelong to move towards a more national circular economy by reducing the waste we generate and recovering waste as valuable resources. The draft Strategy will be available for public consultation in the next few months and we encourage you to provide feedback to this important document.


8. ROD HODSON – RATES INCREASE 2019-2020

Mr Rod Hodson provides a submission in response to the proposed 2019-2020 Budget. Mr Hodson is concerned at the increase of 2.5% for residential rates being higher than the CPI increases for aged pension recipients and the impact of this increase adding to further cost of living expenses.

Officer Comments

An officer phoned Mr Hodson and spoke with him regarding specifics to his property.

The City has complied with the rate cap set by the State Government. As the calculation uses the average valuation movement, where a property has a valuation movement lower than the average, there will be a reduction to the rates payable. Where a property has a valuation movement higher than the average, the increase to the rates payable will be higher than the rate cap.

The City currently offers the following to eligible ratepayers:

The above assistance measures provide relief to ratepayers.


9. JUDITH BRACKEN – PORTARLINGTON RECREATION RESERVE

Ms Judith Bracken provides a submission in response to the proposed 2019-2020 Budget. The submission comments on the allocation of $50k in the proposed 2019-2020 Budget to create a master plan for the recreation reserve in Portarlington. The submission requests that consideration be given to the use of the reserve and that its use is inclusive of all members of the community. Present access to the reserve are unsuitable for dog walking activities.

Officer Comments

No funding has been requested and no budget allocation required. Council officers will contact the author of the submission to ensure they are aware of their existing use rights and outline their opportunities to contribute to the Master plan review once the project commences.


10. & 11. MONIQUE CONNELL – BUILDING BETTER BIKE CONNECTIONS AND PROPOSED CONSOLIDATION OF MATERNAL AND CHILD HEALTH (MCH) CENTRES

Ms Monique Connell provides two submissions in response to the proposed 2019-2020 Budget. The first submission acknowledged the City’s initiatives to improve the Moorabool Street and mall precinct and the trial of short term free parking. The submission requests an update on the western route for the Better Bike Connections which has not yet commenced and requests Council address the issue of parking options for workers in the CBD, in particular park and ride facilities for workers who access the CBD from the northern and western entrances. A further submission requests an amendment to plans to consolidate the MCH centres in Bell Park, Bell Post Hill and Herne Hill.

Officer Comments

Building Better Bike Connections

The City has now awarded the tender for the Building Better Bike Connections - Western Link. Construction is due to commence in July 2019.

We continue to explore options to improve both transport and amenity outcomes in Central Geelong.

Planned consolidation of Maternal Child Health centres

The comments above are noted and the matters identified will be incorporated and addressed as part of the proposed site selection and future design requirements for a new early childhood facility in the Bell Park - Bell Post Hill area. Proximity to public transport and provision of off-street parking are key criteria used as part of site selection and facility design specifications. The future design of a new early childhood facility in Bell Park - Bell Post Hill proposed to consolidate, upgrade, and replace existing buildings will include consultation with service users and stakeholders, where the matters referred to in this budget submission (above) will be considered further. Future plans for any facilities that maybe subject to relocation and proposed to be redeveloped as all-abilities playgrounds (item 3 above) will also be considered in accordance with Council’s open space and public playground planning and development priorities.


12. JUSTIN GIDDINGS – AVALON AIRPORT - BEACH ROAD IMPROVEMENTS

Mr Justin Giddings provides a submission on behalf of Avalon Airport Australia in response to the proposed 2019-2020 Budget. The submission requests the proposed 2019-2020 capital works budget consider funding improvements to the Beach Road Avalon locale.

Officer Comments

Engineering Services has met with Avalon Airport representatives, Transport for Victoria and Regional Development Victoria to assist with facilitating improved ground transport both internally and externally to the airport.

The City supports a road safety audit to identify traffic management and road infrastructure interventions to improve the customer experience and provide safe access for all road users, in particular foreign drivers.

Request for budget would need to be supported by detailed design and investigation to determine scope of works required. There is a likely opportunity for a joint application for external funding to support the submission. Minor works can be accommodated within existing budgets – e.g. linemarking and signage.


13. TIM GODDARD – BARWON HEADS FOOTBALL AND NETBALL CLUB SPORTS GROUND MAINTENANCE

Mr Tim Goddard provides a submission on behalf of Barwon Heads Football and Netball Club (BHFNC) in response to the proposed 2019-2020 Budget. BHFNC are seeking Council support for funding of $49,216.57 for 2019-2020 for the cost of ground maintenance. The club currently funds the expenditure from its operating budget.

Officer Comments

Council’s Fair Play Policy (adopted 2017) can be applied to public land and reserves and is not just limited to public lands managed by CoGG. The Barwon Heads Football Netball Club (BHFNC) is located on public land (Howard Harmer Reserve) that is under the management of the Barwon Coast Committee of Management (BCCoM) and therefore the Fair Play Policy can be applied.

The BHFNC competes in the same league as a range of other clubs that all have access to the benefits of Council’s Fair Play Policy. As Howard Harmer reserve is currently public land under the management of the BCCoM, the BCCoM have existing responsibility to maintain public land for public use and access, and specifically BBCoM utilise the Howard Harmer reserve for camping two months of every year, that derives a direct income for the BBCoM.

It is the officers view that BCCoM should retain responsibility for maintaining Howard Harmer reserve to a standard fit for general public use and camping and that as a result the BCCoM should also retain a level of responsibility for the cost of maintaining the reserve to a standard suitable for safe general use by the public, as would be the case in the absence of BHFNC being a tenant.

It is noted that the submission provided by BHFNC provides quotes of future costs for reserve maintenance. It is the officers view that a more accurate reflection of the cost attributable to the maintenance of the Howard Harmer Reserve would be to rely on the past three (3) years of actual costs borne by the club for oval maintenance.

It is recommended that Council consider:


14. IAN MORRIS – GREATER GEELONG HERITAGE ADVISORY COMMITTEE

Mr Ian Morris provides a submission on behalf of Greater Geelong Heritage Advisory Committee in response to the proposed 2019-2020 Budget. The submission requests the budget make provision for additional funding to increase heritage committee activities.

Officer Comments

There is currently no budget for the operation of the Heritage Advisory committee other than staff resourcing. It is understood the Committee was allocated $5,000 from the Planning, Design and Development division but to date none of this money has been spent. This money will be made available this financial year.

It is understood the Committee is currently meeting bi-monthly not quarterly and this is being resourced by staff. The quarterly meetings are a minimum in the terms of reference.

Council is currently appointing a heritage planner who will develop a detailed implementation plan to deliver the heritage strategy, this will allow considered budget bids to be made next financial year. $30,000 will provide funding to deliver some of the identified actions on the heritage strategy this financial year.

The heritage planner can investigate the tree register option with the City’s Parks Unit for consideration for a future budget bid.

The Major Heritage Fund will be reviewed after the latest round is finalised. The latest round of the Fund is being broadly advertised with targeted consultation as well.

The City is currently undertaking a Heritage Asset Strategy which will inform future decision making on how to best manage and care for our collections.


15. JOHN BROCKWAY – OFF STREET PARKING IN RESIDENTIAL DEVELOPMENTS

Mr John Brockway provides a submission in response to the 2019-2020 Budget. The submission acknowledged the challenges of creating annual budgets which respond to the demands of the municipality. The submission requests that consideration at the planning stage of new residential developments include adequate off street car parking bays.

Officer Comments

This matter has been discussed with the Development Planning Unit of Engineering Services.

Indented parking bays, such as those cited in Trinity Way, Armstrong Creek, are provided at the time of subdivision where the road and lot layout prevents adequate on-street parking.

Parking provision in and around Cornell Avenue, Mount Duneed is standard for new residential areas and consistent with State Government requirements in the planning scheme.

Council has no program to retrofit residential areas by providing new indented parking bays.


16. GREG WILSON – KEVIN HOFFMAN WALK STEWARDSHIP

Mr Greg Wilson provides a submission on behalf of the Friends of Kevin Hoffman Walk in response to the 2019-2020 Budget. The submission requests an additional $25k funding for Friends of Kevin Hoffman Walk to employ a part time horticulturist to continue the work initiated by Mr Hoffman.

Officer Comments

The Friends of Kevin Hoffman Walk group was formed approximately 3-4 years ago due to Kevin’s failing health. Due to his health Kevin has been unable to contribute to works in any great capacity for some time and has already been working with Corrections Victoria and the arrangements detailed above were part of the management plan put in place when the group was formed to allow them to be self-sustainable.

Council has previously been in support of providing funds through the Parks Stewardship fund however, has not been prepared to contribute to the wages of a gardener.


17. KEVIN MCMAHON – ST MARY’S SPORTING CLUB REDEVELOPMENT OF FACILITIES

Mr Kevin McMahon provides a submission on behalf of St Mary’s Sporting Club in response to the proposed 2019-2020 Budget. The submission is seeking funding of $43k in 2019-2020 proposed budget to support a $2.2m redevelopment of existing facilities.

Officer Comments

The scope of the current St Mary’s pavilion project is to deliver non-essential upgrades and expansion of social rooms which exceed the AFL facility guidelines. Project funding has already been committed by State Government and the St Mary’s Football Club, with the Club also committing to fund any budget overrun that may occur. Council will manage the project delivery at no cost to the club.

The project has already been scoped and adequate funding secured via the funding agreement with State Government and existing Club financial commitment.

Officer recommendation is that no allocation be made in the budget towards this discretionary club project which already has funding secured.


18. JACQUELINE EDGE – TREESCAPING AND TRAFFIC MANAGEMENT IN GEELONG WEST

Ms Jacqueline Edge provides a submission in response to the proposed 2019-2020 Budget. The submission requests the 2019-2020 Proposed Budget include provision in Elizabeth Street, Geelong West for an environmental assessment, treescaping plan and additionally, complete a safety assessment and implementation of a traffic management plan.

Officer Comments

Our streetscape upgrade program is currently focussed on shopping strip areas where there are existing adopted master plans. At present there is no streetscape or master plan for this area, and no budget allocation for the 2019-2020 financial year to plan for these works.

A Road Safety Audit Assessment under the Safer Road System is not planned for 2019-2020. Traffic counts in Elizabeth Street indicate motorists are compliant with the posted speed limit. Residents are welcome to provide input to the City’s Road Safety Strategy when it is available for community input in September 2019.


19. KATHRYN ARNDT – VICTORIAN LOCAL GOVERNANCE ASSOCIATION (VLGA) MEMBERSHIP

Ms Kathryn Arndt provides a submission on behalf of VLGA in response to the proposed 2019-2020 Budget. The submission seeks an allocation of $48k in 2019-2020 Proposed Budget for the City to purchase membership of VLGA for 2019-2020.

Officer Comments

The City of Greater Geelong has previously been a member of the VLGA. In 2017, the VLGA provided support for all candidates interested in standing for Council and partnered with the City and WILD to run candidate information sessions. There are a number of benefits of VLGA membership including access to resources at a discounted member rate (including candidate and Councillor information sessions and training) and support for advocacy particularly about gaming machines. The VLGA have also been championing the representation of women in Local Government and have received government funding for its Local Women Leading Change campaign. Council may consider rejoining the VLGA to support the upcoming Council elections in 2020.


20. MURRAY RANCE – PORT PHILLIP FERRIES – CUNNINGHAM PIER CARPARKING UPGRADE

Mr Murray Rance provides a submission on behalf of Port Phillip Ferries in response to the proposed 2019-2020 Budget. The submission requests the 2019-2020 Proposed Budget make provision for $200k contribution towards the upgrade of the Cunningham Pier car park. Cunningham Pier has been identified as a suitable car parking location for ferry users due to the close proximity to the arrival/departure point.

Officer Comments

The addition of a ferry service from Geelong to Melbourne will add to both the image of Geelong and the accessibility of Geelong. It will add another dimension to the waterfront and allow people to experience Geelong from another angle.

Port Phillip Ferries have identified an opportunity to reconfigure car parking on Cunningham Pier to allow for users of the ferry to park nearby. This initiative will improve the operation of the Cunningham Pier car parking and allow for a greater number of bays to be available at other peak times in Central Geelong. It will encourage more people to use the ferry and will help ensure sustainability of the service.

The initial investment by both Port Phillip Ferries and the Victorian Government is significant in establishing this operation and the request of the City of Greater Geelong to upgrade parking in the nearby vicinity appears to be in-line with what would be considered the role of Local Government, car parking. This would be a one-off payment that would ensure that the City is supporting a very worthwhile addition to the offering of Geelong and the region.


21. SARAH ROBERTS – FOOTPATH INFRASTRUCTURE IN GROVEDALE

Ms Sarah Roberts provides a submission in response to the proposed 2019-2020 Budget. The submission requests the 2019-2020 proposed budget be revised to include spending on footpath infrastructure to deliver a principal pedestrian network in Grovedale.

Officer Comments

$1.2 million has been allocated for the construction of new footpaths across the municipality. Priority paths are assessed for inclusion in the program.

Funding of new footpaths is via the Special Rates and Charges mechanism whereby abutting property owners share the cost of the works with Council. Thus, agreement and support is needed from property owners before we can proceed to construction.

With respect to future footpaths in Grovedale, the City is aware that there are areas of Grovedale without an extensive footpath network and have undertaken a Principal Pedestrian Network (PPN) study for Grovedale.

A PPN uses census data to determine origins and destinations of pedestrians and creates a map indicating the areas use and/or needed as a priority. We use this document to assess needs against the existing footpath network and determine gaps in preparing future footpath construction programs for budget consideration.

In addition to the PPN, the City has a Footpath Customer Commitments Register (FCCR) where footpaths that need constructing are added to the list and ranked in order of risk and priority.

All of the locations identified in your submission are included in our list of missing paths in Grovedale and have been ranked in the FCCR. The priority paths recommended for construction in Grovedale are Burdoo Drive and Surfcoast Highway missing links. Timing of delivery is proposed within the next 3-5 years.

The paths listed below are key routes that have been constructed over the past five years.


22. JASON SMITH – GEELONG GALLERY BUSINESS CASE

Mr Jason Smith provides a submission on behalf of Geelong Gallery in response to the proposed 2019-2020 Budget. The submission seeks reconsideration of Geelong Gallery’s budget bid for Council investment of $100k to complete an updated business case for Geelong Gallery expansion into City Hall space.

Officer Comments

The Geelong Gallery Business Case is unlikely to be funded by the State if Council does not contribute. Immediate major risks if the Business Case remains unfunded by Council include:

Major risks long term if the Business Case remains unfunded by Council include:


23. STEVEN BISHOP – FACILITIES UPGRADE COLLENDINA RESERVE

Mr Steven Bishop provides a submission on behalf of Ocean Grove Cobras Junior Football Club and Collendina Cricket Club in response to the proposed 2019-2020 Budget. The Club has secured a Federal Government commitment of $580K towards the development of a multi- purpose pavilion at Collendina Reserve and seeks a matching contribution of $580k from Council be included in the 2019-2020 Proposed Budget.

Officer Comments

Officers have met with representatives of the Collendina Cobras regarding this project. The growth in Club participation is noted and also the Clubs’ need to expand and deliver facilities that meets sport standards and deal with the pressure of increased participation at peak times.

The design of the proposed facility, and the needs for further improvement or changes to other existing / supporting infrastructure in the reserve is not resolved and would benefit from further engagement with the City to more fully resolve the proposed design and infrastructure response.

It is proposed that as a one-off community initiative seeking Council support, that this matter be referred to the Community Infrastructure Grants process opening on 7 June. That officers will continue to work with the Club to further refine the proposal, look at any alternatives and also consider any needs for improvements to other aspects of the reserve and that this will enable the Club to submit a more resolved proposal as part of the community infrastructure grants process.

The following two submissions (Topic 24 & 25) were received after the closing date, therefore they are provided to the panel for information, but officer comments are not provided:


24. LEX CHALMERS OAM – GENERAL COMMENTARY ON PROPOSED BUDGET

Ms Lex Chalmers OAM provides a submission in response to the proposed 2019-2020 Budget. The submission proposes that increased budget funding for Heritage Strategy, UNESCO designation and heritage, urban and social planning staff will enable the City to respond to community cultural needs.


25. LYNNE DOWLING – FEASIBILITY STUDY FOR CHILWELL COMMUNITY HUB

Ms Lynne Dowling provides a submission in response to the proposed 2019-2020 Budget. Ms Lynne Dowling requested that the City provide finance for a feasibility study to incorporate the Chilwell Library and adjoining Maternal Health Centre and Sladen Park into a ‘Community Hub’ for local residents. This is the only community space in the Chilwell area for people of all ages to meet and interact. The facilities are aged and could be better utilised with an integrated and modern expanded facility. The design could incorporate a separate meeting room, men’s shed, community garden and public toilets.


Attachment 3

Listing of Submissions in order of receipt

Submission No.

Topic

Name

Organisation

Attending

1

Newcomb Streetscape Improvements

Ms Miranda Hurley

 

 

2

Bike Path East Geelong / Belmont

Ms Miranda Hurley

 

 

3

Car Parking

Ms Cassandra Rabich

 

 

4

Car Parking

Ms Zoe Sells

 

 

5

Little Malop Street Mall Improvements

Mr Michael Inturrisi

 

 

6

Car Parking

Ms Leanne Yearsley

 

 

7

Little Malop Street Mall Improvements

Ms Jacqui Hart

 

 

8

Little Malop Street Mall Improvements

Ms Dannielle Menz

 

 

9

Little Malop Street Mall Improvements

Ms Jeanette Connolly

 

 

10

Agribusiness Strategy Implementation

Mr Bill Winter

Food & Agribusiness Network G21 Region

 

11

Car Parking

Ms Jo-anne Duffield

 

 

12

Footpath Infrastructure

Ms Ingrid Novosel

 

 

13

Car Parking

Ms Irene Kadenbach

 

 

14

Environmental Management

Mr Ryan Mischkulnig

 

 

15

Little Malop Street Mall Improvements

Mr Braden McKay

 

 

16

Rates Increase 2019-2020

Mr Rod Hodson

 

 

17

Infrastructure funding for Indented Head

Ms Ingrid Novosel

 

 

18

Indented Head Woodland

Ms Ingrid Novosel

 

 

19

Car Parking

Mr Andrew Craddock

 

 

20

Bike Networks / Park and ride facilities

Ms Monique Connell

 

 

21

Car Parking

Mr Steve Sowden

 

 

22

Car Parking

Mr Jason Wilde

 

 

23

MHC centres consolidation

Ms Monique Connell

 

 

24

Car Parking

Ms Renee Gaulke

 

 

25

Masterplan – Portarlington Rec Reserve

Ms Judith Bracken

 

 

26

Car Parking

Ms Kim Blair

 

 

27

Car Parking

Mr Brian Happ

 

 

28

Car Parking

Ms Shelley Christy

 

 

29

Car Parking

Ms Vicki Maroulis

 

 

30

Car Parking

Ms Stephanie Wood

 

 

31

Sports Ground Maintenance

Mr Tim Goddard

Barwon Heads Football & Netball Club

 

32

Beach Road Avalon Improvements

Mr Justin Giddings

Avalon Airport Australia

Yes – Andrew Elliott

33

Car Parking

Ms Helen Donnelly

 

 

34

Heritage funding

Mr Ian Morris

Geelong Heritage Advisory Committee

 

35

Off street parking in residential developments

Mr John Brockway

 

 

36

Kevin Hoffman Walk stewardship

Mr Greg Wilson

Kevin Hoffman Walk Committee

 

37

Redevelopment of existing facilities

Mr Kevin McMahon

St Mary’s Sporting Club

 

38

Geelong West – Treescaping & Traffic Management

Ms Jacqueline Edge

 

 

39

Car Parking

Ms Renee Brenner

 

 

40

VLGA Membership

Ms Kathryn Arndt

Victorian Local Governance Association

Yes

41

Car Parking

Ms Ruby Burns

 

 

42

Cunningham Pier carpark upgrade

Mr Murray Rance

Port Phillip Ferries Pty Ltd

 

43

Footpath Infrastructure

Ms Sarah Roberts

 

Yes

44

Geelong Gallery Business Case

Mr Jason Smith

Geelong Gallery

Yes

45

Car Parking

Ms Meredith Fletcher

 

 

46

Car Parking

Mr Joel Harbour

 

 

47

Car Parking

Mr Iliya Ilievski

 

 

48

Car Parking

Ms Gail Croft

 

 

49

Car Parking

Ms Janet Taylor

 

 

50

Collendina Reserve facilities upgrade

Mr Steven Bishop

Ocean Grove Cobras Junior Football Club and Collendina Cricket Club

Yes

51

General Budget Commentary

Ms Lex Chalmers OAM

 

 

52

Feasibility study – Chilwell Community Hub

Ms Lynne Dowling

 

Yes



[Back to List]

2. Traffic Flow Movement and Congestion in Malop Street – Green Spine Area

Source:

Economy, Investment and Attraction - Central Geelong & Waterfront

Director:

Brett Luxford

Portfolio:

Economic Development


Purpose

  1. To provide Council with the results of the traffic review undertaken for Malop Street Green Spine and to outline the series of initiatives that have been implemented and proposed.


Background

  1. At the 12 February 2019 Community Focus Council Meeting, Council resolved to seek a review of the operations of the Malop Street Green Spine post implementation, particularly how it related to traffic flow and safety.

  2. The Malop Street Green Spine is highlighted as a catalyst project in the Vision 2 strategy and is identified in Council’s 2013 Central Geelong Action Plan, including the Victorian Government’s Revitalising Central Geelong Action Plan.

  3. The objective of the project is to develop a streetscape that makes the city more liveable and encourages people to spend longer in the space.


Key Matters

  1. In response to the request to review operations a ‘Malop Street Green Spine Investigation’ report was prepared (Attachment 3).

  2. As a destination street, the Green Spine aimed to increase pedestrian numbers and reduce through vehicle traffic on Malop Street. Since the Green Spine implementation, vehicle volumes have decreased by 56%. During mid-day peak (between 12-1pm) pedestrian movements have increased by 11% and now make up 75% of all movement (1358 pedestrian movements, 452 vehicle movements).

  3. Delay has increased for through moving vehicles on Malop Street between Gheringhap Street and Bellerine Street. From the data collected; east bound traffic (Gheringhap to Bellerine Street) maximum delays occurred in the hour between 4-5pm; for west bound traffic (Bellerine to Gheringhap Street) maximum delays were between 5-6pm.

  4. The data collected reflected increases in delay at times, however it also showed minimum delays at those same time periods. So whilst delays may be experienced, they are typically only at peak times and for short durations.

  5. Comparisons in data pre-Green Spine (2016) to post-Green Spine (2019) have been undertaken, where data was available pre-Green Spine.

  6. Three priority short term actions are recommended; 1) work with Regional Roads Victoria to improve traffic signal phasing, 2) develop a driver education program and 3) implement directional signage improvements.

Councillor Kontelj moved, Councillor Nelson seconded -

  1. That Council:

    1. Note the findings of the Malop Street Green Spine Investigation report.

    2. Note the measures outlined in the report Malop Street Green Spine Investigation report.

    3. Note that with the exception of the PM east bound traffic, all other legs of the Moorabool / Malop Street intersection have resulted in comparatively minor increases or decreases in travel times and that any decreases are largely due to the decrease in vehicular traffic entering or egressing the Malop Street Green Spine.

    4. Note that officers will implement the following short term actions:

      1. Continue to work with Regional Roads Victoria to improve traffic signal phasing;

      2. Develop an education campaign to reduce traffic blocking intersections; and

      3. Implement the identified directional signage improvements.

    5. Further evaluate the changes in traffic conditions and driver behaviour following the implementation of the above actions and that Council receive a further report on the measures in March 2020.

    6. Request the Chief Executive Officer to provide a report to Council by November 2019, which includes an outline of the work scope, the potential impacts on the Green Spine design, pros and cons, costs and timelines for implementation to install/introduce vehicle turning lanes at the intersections of Malop Street and Yarra Street and Malop Street and Moorabool Street.

Carried.

Division Requested:

For: Councillors Kontelj, Mansfield, Aitken, Murrihy, Mason, Asher, Sullivan, Nelson

Against: Councillor Murnane


Attachment 1

Discussion

  1. The proposed directional signage changes and education programs can be funded through Council’s existing programs and are estimated at $10,000. Those items requiring action by Regional Roads Victoria will be subject to their funding for implementation.


Community Engagement

  1. Community engagement was not undertaken in the development of this report or the traffic data and movement review.


Social Equity Considerations

  1. Social Equity consideration have been considered in the development of the Green Spine project, particularly relating to disability and access and impairment.


Policy/Legal/Statutory Implications

  1. There are no policy, legal or statutory implications arising from this report.


Alignment to Council Plan

  1. The Green Spine is identified as a key catalyst project in Vision2, Central Geelong Action Plan, Revitalising Central Geelong and Council Plan.


Conflict of Interest

  1. There have been no direct or indirect interests declared.


Risk Assessment

  1. Safety is paramount and the City adopts the Safe System Principles lead by TAC in reviewing and monitoring the municipalities’ road network. Traffic speed in Central Geelong has been reduced to 40km/h in recognition of the need to reduce traffic speed and prioritise the safety of vulnerable users, pedestrians and cyclists.

  2. The Green Spine is designed to make the city more liveable and encourage people to spend longer along the Malop Street Green Spine. As such, we have considered the need to reduce the impact of vehicles in this space and reprioritise for pedestrians.

  3. The traffic investigation identified risks to pedestrians with vehicles stopping within pedestrian crossings in Central Geelong. We have been liaising with Victoria Police to monitor and assist enforcing poor driver behaviour, as well as developing an education campaign ‘don’t block the intersection’.


Environmental Implications

  1. There are no identified environmental implications arising from this report.


Attachment 2

Discussion

  1. At the Community Focus Council Meeting on 12 February 2019, through an urgent Notice of Motion regarding Malop Street Traffic Issues, Council resolved to:

    1. Note the traffic flow issues that are currently experienced in the Green Spine;

    2. In order to significantly improve vehicle traffic flow and movement through the Green Spine, work with VicRoads to investigate all possible improvement opportunities taking into consideration what impact the recent changes, including the installation of the bike lanes, may have had on traffic flow and movement;

    3. Work with VicPol to ensure safety aspects of traffic congestion are managed appropriately in the Green Spine;

    4. Undertake a detailed post-evaluation of traffic for the Green Spine project; and

    5. Report back to Council with all findings and recommendations by no later than 18 June 2019.

  2. Investigation comparing data pre-Green Spine (2016) to post-Green Spine (2019) has been undertaken and is detailed in the ‘Malop Street Green Spine Investigation’ report, where data was available pre-Green Spine.

  3. The design of the Green Spine included the removal of turning lanes on the east approach to the intersection of Moorabool/Malop Streets and the west approach to the intersection of Yarra / Malop Streets to allow space for additional greening and landscaping.

  4. The design considered the inclusion of turn lanes at the expense of reducing the ‘botanic walk’ (landscaping), however the streetscape value was deemed a priority element that aligned with the objectives of the project.

  5. The investigation highlighted that pedestrian numbers have increased and vehicles travelling through the space have decreased. It also highlighted that some challenges still exist with queuing in Malop Street and across intersections.

  6. Key actions arising from the investigation and detailed in the ‘Malop Street Green Spine Investigation’ report are:

    1. Broader traffic signal linking and intersection sequencing will be considered following completion of the Central Geelong Transport Network Operating Plan.

    2. Council officers to continue to work with VicRoads to understand the impacts of recent improvements to the timing of signals and identify what further improvements can be made to traffic signals.

    3. Victoria Police have commenced additional patrols to address driver behaviour. Council officers have regular meetings with Victoria Police members and will continue to monitor safety and compliance.

    4. Education initiatives through online platforms, social media and temporary electronic message signs regarding driver behaviour “don’t block the intersection” will be developed.

    5. Changes and improvements to directional signage entering Central Geelong, particularly Malop Street, have been identified for implementation.

    6. Changes to turn lanes at the intersection of Garden/Ryrie Streets have been identified to direct through traffic (that does not have a destination for Malop Street) to continue along the arterial road network (along Ryrie Street). This change will be requested to Regional Roads Victoria.

  7. The installation of bike lanes specifically has not had an impact on traffic flow. It is considered that the removal of turning lanes is what has impacted traffic flow and the available options for signal phasing. The desired Green Spine streetscape and maximise landscaping opportunities results in reduced space to provide turning lanes.

  8. Subsequent traffic comparison will be commence in September 2019 to further revaluate the changes in traffic conditions and driver behaviour following the implementation of the above actions.

  9. Findings from the investigations will be used to inform the design of subsequent blocks of the Malop Street Green Spine.


[Back to List]

3. Amendment C372 – Hams Road, Waurn Ponds – Consideration of Submissions

Source:

Planning, Design and Development - Stragegic Implementation

Director:

Gareth Smith

Portfolio:

Sustainable Development


Purpose

  1. To consider submissions to Amendment C372 and Permit Applications 662/2017 and 663/2017 and refer them to an independent Panel appointed by the Minister for Planning.


Background

  1. The proposal is a combined rezoning to General Residential Zone, a Design and Development Overlay and two planning permit applications to allow multi lot subdivision of 35 & 69-93 Hams Rd, Waurn Ponds. The land is the last Farming Zone site inside the Ring Road/Anglesea Rd in this part of the municipality.

  2. Strategic justification for rezoning is provided by the Armstrong Creek Urban Growth Plan, the G21 Regional Growth Plan and the Settlement Strategy.

  3. A subdivision masterplan was submitted with the two planning permit applications and includes: linear open space along the creek with shared pathways, a large 0.9 ha park, upgrades to Hams Rd and a new roundabout at the Hams Rd/Ghazeepore Road intersection. The exhibited plan shows 258 residential lots (plus 2 medium density superlots which could yield 40 lots) - a total of around 300 lots.

  4. On 11 December 2018 Council resolved to support the public exhibition of the amendment and draft permits. It was exhibited from 21 March to 26 April 2019.

  5. A total of 164 submissions were received. Of these 159 submissions objected and 5 submissions either supported, did not object or provided comments.


Key Matters

  1. The two key issues raised in submissions are traffic and housing density.

  2. Traffic concerns include problems with the main road in the area – Ghazeepore Road - which in recent years has seen increases in traffic volumes due to Armstrong Creek development and the opening of the Waurn Ponds Railway Station. Housing density concerns centred on the small lots when compared to the adjoining Grange Park Estate which has very large residential lots.

  3. Other concerns raised in submissions include: potential for student housing, socio-economic issues, crime and safety, servicing, environmental impacts, flooding, drainage, noise and air quality, the buffer from the Boral quarry land and the consultation process.

  4. A number of submitters did not oppose rezoning of the site or development but objected to the masterplan due to it being perceived as high density and having small lot sizes.

  5. The proponents have provided a statement in response to the submissions and, as a way forward, have offered $0.5M as a contribution to improvements in Ghazeepore Road and a new masterplan which reduces the density of the proposed subdivision by:

    1. Removal of the two medium density sites capable of producing 40 dwellings.

    2. Removal of all lots less than 300 sq m and replace with lots of at least 400 sq m.

    3. Add an additional minimum of 30 lots that are at least 800 sq m through the removal of approx. 50 lots that are in the range from 300 to 400 sq m.

  6. Under the Planning and Environment Act 1987, Council must now either: change the Amendment in the manner requested by the submitters; refer the submissions to an Independent Panel; or abandon the Amendment or part of the Amendment.

  7. Officers recommend referring the submissions to a Panel and accepting “in principle” the proposed changes put forward by the proponents.

Councillor Nelson moved, Councillor Murnane seconded -

  1. That Council having considered all submissions to Amendment C372 and related planning permit applications resolves to:

    1. Request the Minister for Planning to appoint an Independent Panel under Part 5 of the Planning and Environment Act 1987 to consider submissions relating to the amendment;

    2. Refer all submissions to the Panel; and

    3. Submit to the Panel its response to the submissions generally as outlined in this report.

Carried.


Attachment 1

Financial Implications

  1. There are no significant financial implications to Council beyond that usually associated with the planning scheme amendment process. State Government fees associated with an independent panel hearing will be passed on to the developer. Council officer time and costs to review submissions are covered by a substantial statutory fee of $39,405 that Council is entitled to charge as the Planning Authority under the Planning and Environment (Fees) Regulations 2016.


Community Engagement

  1. Nearby landowners and occupiers, prescribed Ministers and other relevant agencies were directly notified during the public exhibition period. The broader community were notified through notices in local newspapers and the City of Greater Geelong website.

  2. The developer held its own information session separate to the Council process.

  3. Submitters will be able to engage in the planning process further by appearing at an independent panel hearing in the event that Council decides to refer submissions to a Panel.


Social Equity Considerations

  1. The amendment addresses social equity by potentially providing further housing choices to the Geelong community. The exhibited plan shows a range of lot sizes which would suit different homebuyers and demographics ranging from small conventional house lots to larger allotments of 850 square metre plus along Hams Rd. The revised plan has less diversity of housing due to the proposed removal of smaller lots and medium density sites. The site is well located close to public transport (train station and bus stop), Deakin University and the Epworth Hospital.


Policy/Legal/Statutory Implications

  1. The amendment is consistent with the following clauses of the Greater Geelong Planning Scheme Planning Policy Framework including:

    1. Clause 11.01-1S Settlement - The amendment supports this policy as it will facilitate residential growth in an orderly manner located close to educational, transport and community services.

    2. Clause 11.01-1R Settlement Geelong (G21) - The amendment supports this policy as the area is identified to support planned growth and optimises the use of existing infrastructure and services.

    3. Clause 15.01-1S Urban Design – The proposed rezoning, subdivision layout and open space are considered to meet the objective: “To create urban environments that are safe, healthy, functional and enjoyable and that contribute to a sense of place and cultural identity.”

    4. Clause 21.06 Settlement and Housing discusses the importance of urban consolidation. The proposal supports this policy by locating development in an area that is well serviced and has the capacity to accommodate sustainable development.

  2. The land is also within the proposed permanent settlement boundary in the Settlement Strategy adopted by Council on 9 October 2018.


Alignment to Council Plan

  1. The Amendment supports the Sustainable Built and Natural Environment strategic direction of the Council Plan 2018-2020 and is consistent with the strategic direction of community wellbeing and the priority of connected, creative and strong communities.


Conflict of Interest

  1. No Council officers involved in the preparation of this report have any direct or indirect interest in the matter to which this report relates, in accordance with Section 80C of the Local Government Act


Risk Assessment

  1. There are no notable risks associated with implementing the recommendations contained in this report.


Environmental Implications

  1. There are a range of environmental implications including stormwater and creek management, native vegetation and wildlife, buffers to the quarry land and noise from roads, the railway and the electricity substation. These issues are addressed in draft planning permit conditions and the proposed Design and Development Overlay.


Attachment 2

Background

  1. On 29 June 2017 Taylors Development Strategists, on behalf of the two landowners, lodged a combined planning scheme amendment and two planning permit applications to allow a multi lot subdivision at 35 & 69-93 Hams Road, Waurn Ponds.

  2. The amendment proposes the following:

    1. Rezoning of land from the Farming Zone (FZ) to the General Residential Zone (GRZ)

    2. Rezone the land within the Barwon Water reserve (north of the Geelong/Warnambool Railway line) from FZ to Public Use Zone (PUZ)

    3. Introduction of a Design and Development Overlay (DDO) to inform the key built form outcomes for the land

  3. The amendment is accompanied by two planning permit applications:

    1. PP662/2017 for multi lot subdivision of the land at 35 Hams Rd owned by Waurn Ponds Trust

    2. PP663/3017 for multi lot subdivision of the land at 69-93 Hams Rd owned by Echin Pty Ltd.

  4. The map below shows the proposed zoning changes (the DDO would apply to the area being rezoned to GRZ1).

  5. Proposed zoning changes
  6. The overall subdivision masterplan proposed for exhibition is provided in Attachment 3.

  7. A summary of the development as detailed in the exhibited masterplan includes:

    1. A total of 258 residential lots;

    2. 21 larger ‘interface’ lots on Hams Rd with an average of 850 square metres approx.;

    3. Two medium density ‘superlot’ sites (capable of approximately 40 medium density lots in total);

    4. A 0.9 ha local park central to the site to be delivered across the two developments;

    5. A creek reserve with an average width of 30m either side of the creek;

    6. Traffic treatments to discourage increased use of Grange Park Drive;

    7. Drainage retarding basins on each title; and

    8. A sewer pump station for the development.

  8. Draft planning permits, a Design and Development Overlay and a Section 173 Agreement were prepared by Council officers.

  9. At its meeting on 11 December 2018 Council resolved to exhibit the amendment and permits subject to Ministerial authorisation which was granted on 20 February 2019.

  10. The amendment and permits were placed on public exhibition between 13 March and 26 April 2019.

Summary of Submissions

  1. A total of 164 submissions were received as part of the public exhibition process. Five submissions either supported, did not object or provided comments and 159 submissions were objections (of which 77 submissions were a “Pro Forma Letter” meaning they were the same submission).

  2. A full summary of all the submissions is in Attachment 4 and a copy of the Pro forma letter is in Attachment 5.

  3. The proponent was provided with a copy of the submissions and invited to make a response to inform and assist Council officer’s response to submissions. The proponent’s consultant forwarded a statement in response to the submissions (see Attachment 6 for a full copy) and a draft revised Masterplan (Attachment 7).

  4. The issues raised can be grouped under the following themes: traffic, housing density, student housing, socio-economic issues, crime and safety, servicing, environmental impacts, flooding, drainage, noise and air quality, the buffer from the Boral quarry land and the consultation process. A description of the issues raised and a Council officer response is provided below.

Submission Themes and Council Officer Responses

Traffic - Ghazeepore Road

  1. The vast majority of submissions identified traffic impacts as the key issue. Many submissions commented on the current condition of Ghazeepore Road and the impact that additional traffic from the proposed development would have. Submitters pointed out the increases in traffic as a result of new housing estates in Armstrong Creek and Torquay and the opening of the Waurn Ponds Train Station. Access to the station is off Ghazeepore Road into Sugargum Drive which is also the intersection of Hams Rd and Ghazeepore Road. Submitters also referred to traffic coming from the south to access Colac Road, Deakin University and Waurn Ponds Shopping Centre. Issues raised include:

    1. Ghazeepore Road is too narrow, can’t handle current traffic volumes and is difficult to navigate when cars are parked on the road;

    2. Safety issues if bike lanes were added;

    3. Difficulty entering and exiting streets off Ghazeepore Road at peak times;

    4. Lack of implementation of Council’s 2015 transport report on the area;

    5. Railway upgrades and access to the station from the south need to occur before more development is allowed; and

    6. Difficulties with pedestrians crossing the road to access bus stops and train station.

Officer Response

  1. Many of the issues raised are existing issues and it is acknowledged that Ghazeepore Road has experienced increased traffic volumes due to residential development in Torquay and Armstrong Creek and the opening of the Waurn Ponds Train Station.

  2. The proponents refer to this in their statement, saying: "Since the opening of both Baanip Boulevard and the Waurn Ponds Train Station (WPTS), Ghazeepore Road usage, particularly between Hams Road and Burgundy Drive has increased. The increase in usage from before and after the opening of Baanip Boulevard and the WPTS has almost doubled based on additional traffic counts recently undertaken by the proponent."

  3. Council traffic engineers consider the most pressing issues on Ghazeepore Road are the impact to traffic caused by on-street parking and the two bus stops (between Oakwood Councillor and Acacia La), and the operation of the Ghazeepore Road/Hams Road/Sugargum Drive intersection. Other issues include illegal parking on nature strips, speeding and lack of on-road bike lanes.

  4. The offer by the developers of a contribution of $500,000 to improvements on Ghazeepore Road is welcomed by Council officers. This is a tangible way to help address exiting issues and to offset the impact of increased traffic volumes from the proposed development. This offer is in addition to upgrades to the Hams Road intersection.

  5. Potential improvements could include: indented car parking bays within the nature strips, indented bus stops and on-road bike lanes. An example of indented parking is provided below (Horseshoe Bend Road). Collation of data as to what the resident’s current parking demands are would need to occur and officers would need to consult with all residents and stakeholders and undertake design and construction work.

  6. Council officers recommend that this contribution could be included in the Section 173 Agreement that accompanies the amendment and permits.

  7. Figure 1 - Example of indented parking bays in Horseshoe Bend Road, Torquay that can be proposed for Ghazeepore Road

    Figure 1 - Example of indented parking bays in Horseshoe Bend Road, Torquay that can be proposed for Ghazeepore Road

Traffic - Intersection of Hams Rd, Ghazeepore Road and Sugargum Drive

  1. Several submitters commented on this intersection with issues including its inability to cope with additional traffic, comments for and against a new roundabout (as proposed as part of the C372 development) and requests for traffic lights rather than a roundabout.

Officer Response

  1. The proponent’s traffic engineers and Council officers have discussed this issue and further traffic counts and movement analysis has been undertaken at the intersection.

  2. It is considered that either a roundabout or traffic lights would be a good solution to safely control traffic flows at this intersection. Traffic lights provide a safe pedestrian crossing, however the analysis shows that vehicle queues would be longer. It is considered that a roundabout would allow better flow of traffic, make east-west through movement much safer and slow down speeds in Ghazeepore Road. A safe crossing with a pedestrian refuge in the road centre would be provided as part of the roundabout. A copy of the concept plan for the roundabout is provided below.

Ghazeepore Road - Waurn Ponsd, Hams Road - Sugargum Drive; concept layout plan

Traffic – Grange Park Drive

  1. Submissions have been received for and against the “no left turn” restriction proposed at the intersection of Hams Rd and Grange Park Drive to limit motorist short cutting down Grange Park Drive to access Ghazeepore Road. Submissions also raised concerns with additional traffic down this street which has no footpaths and is used by families and children.

Officer Response

  1. It is recommended that the permit and DDO continue to include requirements to make Grange Park Drive difficult to access from the proposed Hams Road development. This will minimise impacts on this street and neighbourhood. Planning permit conditions includes Local Area Traffic Management measure which could also include require offsite works to limit speeds down Grange Park Drive.

Traffic – Traffic report

  1. A number of submissions criticised the traffic report that was submitted by the proponents and pointed out the traffic surveys are out of date being at least 2 years old.

Officer Response

  1. The Traffic Engineering Assessment of October 2018 prepared by Traffix Group provides traffic counts from October 2016. More recent counts have been undertaken (referred to in Appendix 5) and a revised traffic report will be prepared by the developers.

Traffic – Single point of entry / Emergency vehicle access

  1. Submitter criticism of the proposal include comments that a 258 lot subdivision which will be entirely reliant on just one road in and out is inappropriate, especially considering Grange Park Drive will not be accessible from Hams Road. Other submitters are concerned about access in an emergency and that emergency vehicles may not be able to move down some of the narrower streets in the proposed estate.

Officer Response

  1. The upgrade of Hams Road and the proposed roundabout at the intersection with Ghazeepore Road will mean that the road will have much more capacity than required for the volume of traffic generated by the development. Hams Road will be improved with footpaths, cycle paths etc. If Hams Road was blocked in an emergency vehicles could still travel up Grange Park Drive. The CFA was referred the application and provided no objection on this issue.

Cycling

  1. The Department of Transport (DoT) made a submission commenting on cycle paths in and around the proposed subdivision. DoT supports removal of the 1.5m on road cycle lane on the condition the 3m wide shared user path in southern verge of Hams Road has adequate signage and markings. It also requests appropriate treatments at the western end of Hams Road for transition to and from shared path under Princess Freeway, requests the shared path along linear open space reserve to be 3.5m minimum for its entirety and suggests wayfinding signage to encourage pedestrian and cycling movements.

Officer Response

  1. The support for the removal of the 1.5m lane is noted. Council officers will further consider what treatment would be appropriate at the western end of Hams Road and the comments on shared path width and signage.

Housing Density - Lot sizes / Neighbourhood Character

  1. Many submissions were concerned at the density of the proposed subdivision, relatively small lot sizes and the two proposed medium density superlots. There is also widespread concern in submissions about the subdivision not being consistent with the character and density of the adjoining Grange Park Estate. Comments from submitters include:

    1. Not in keeping with surrounding area;

    2. Increased block size would reduce traffic volumes;

    3. Out of character with the existing surrounding residences which is one of larger homes on larger allotments (2000 sq m and above);

    4. Grange Park Estate has its own identity and the existing community would like it preserved;

    5. Tiny block sizes take the rural feel away from Waurn Ponds; and

    6. Super lots – an overdevelopment and unnecessary within this neighbourhood.

Officer Response

  1. Council officers were supportive of the exhibited masterplan as it would potentially provide further housing choices to the Geelong community. There are a range of lot sizes proposed which would suit different homebuyers and demographics ranging from medium density sites and small conventional house lots to larger allotments of 850 square metre plus along Hams Road. Officers consider the density and lot layout in the exhibited plan is in accordance with State and Local planning policies and is supportable on planning grounds.

  2. However, in response to the submissions and community sentiment the proponent has stated it wishes to alter the plan as follows (from statement in Attachment 6):

  3. “The proponent has attempted to acknowledge the neighborhood character and improve the interface with the Grange Park Estate through the provision of large lots on Hams Road of 800sq.m. or larger. The proponent acknowledges the concerns raised in some submissions with reference to the unknown – medium density housing sites and townhouse lots which are perhaps not common in the local area of Waurn Ponds and could be seen as a conflict to character. The proponents therefore propose to amend the plan of subdivision to find a balance between respecting local character and achieving development density objectives. The proposed changes include:

    1. Removal of the two medium density sites that were capable of producing 40 dwellings.

    2. Removal of all lots less than 300sq.m. and replace with lots of at least 400sq.m.

    3. Add an additional minimum of 30 lots that are at least 800sq.m. (primarily in the western end of the development away from the WPTS) through the removal of approximately 50 lots that are primarily in the range from 300 to 400 square metres.

  4. The net result of the above changes is a reduction of 50 dwellings from the subject site and the encouragement of larger lots as opposed to smaller lots. The total number of lots following the changes above is 245. It is noted that restrictions on title will stop these lots from being able to be further subdivided.”

  5. The proponent has also marked up the exhibited Masterplan to show the proposed changes (see Attachment 7).

  6. Council officers accept this revised position and, subject to Council resolution, will amend the planning permit and DDO to reflect the changes in the lead up to a Panel hearing.

Socio Economic/Crime

  1. Some submissions fear that the perceived high density of the development will create socio-economic problems. Submitters raise concerns that a “ghetto” will be created, others describe potential for an isolated, congested enclave. Crime and safety are also raised as issues. Comments from submitters include:

    1. Very small blocks…creating high density housing and higher risk of lower socio-economic housing;

    2. Increase in crime to the Grange Park Estate due to a significate price drop in housing between Grange Park Estate and proposed subdivision housing;

    3. Amendment could be responsible for creating an overcrowded pocket of ghetto living- small allotments, overcrowded, and unfavourable living situations;

    4. Stacking houses so close together is going to cause social issues on a large scale;

    5. Are we trying to cheapen Geelong with this type of development cheaper blocks, cheaper housing similar to Corio and Norlane.

Officer Response

  1. Council officers do not agree with these submissions and the proposition that smaller lot sizes or medium density housing will necessarily result in increased social issues, crime or creation of ghettoes. There are many areas across Geelong and cities such as Melbourne with thriving communities living in mixes of townhouses, apartments and conventional dwellings on small and medium sized lots.

Student Housing

  1. A number of submitters are concerned that either the super lots could be developed for student housing or students could rent out houses in the new subdivision. Concerns relate to potential social issues, traffic and parking problems.

Officer Response

  1. Students are entitled to buy or rent out houses built in the proposed subdivision and the planning system does not discriminate against this. It would only be if the houses contained excessive numbers of rooms or were turned into boarding houses that there may be a need for further approval. Car parking and traffic issues that may arise would be managed by Council as with any other residential area.

Flooding and Drainage

  1. Local residents have commented that the land is a flood plain and “who would want to build in a creek and the lowest area of land in the vicinity”. Another criticised the Surface Water Management Strategy as being flawed as it’s based on the 2014 C276 application not current application.

  2. Vic Track and DoT objects to the design of the storm water drainage system in the planning permit application. Vic Track states it does not usually permit drainage from new development into the rail corridor and this is reflected in the standard conditions it commonly recommends to Responsible Authorities. The issue relates to the C372 site draining into a culvert under the railway line which is blocked with sediment.

  3. Vic Track seeks more information and details on the culvert and design details of the proposed retarding basin and requests conditions be placed on permit (see submission 164 in Attachment 4)

Officer Response

  1. Council officers believe that Vic Tracks’ issues can be resolved and will arrange a meeting with the key stakeholders to reach a solution.

Servicing

  1. Some submitters are concerned that servicing infrastructure in the area cannot cope with additional population. Concerns include low water pressure and the lack of consideration of natural gas infrastructure strategic planning in the Armstrong Creek West PSP.

  2. Barwon Water submitted that the development can be supplied with water and sewerage services and it was satisfied with the permit conditions. It suggested that the site of the proposed sewerage pump station be rezoned to Public Use Zone 1 – Service & Utility.

Officer Response

  1. The proposal was referred to all relevant servicing authorities and their requirements are included as conditions in the draft planning permits.

  2. Council officers agree with Barwon Water that the pump station site should be rezoned to PUZ1, however it would be preferable to do this later as part of a tidy up amendment as a separate land title is required to determine the boundaries of the zone.

Environmental impacts, open space

  1. Submitters are concerned at potential impacts of the development on the environmental values of the site in particular the creek. A submitter considers the site would be better served as a reserve for wetlands and trees for carbon capture. Concerns were raised over the fauna and flora of the creek which a submitters believes has a special species of frog that are primal to this area. Another submitter is concerned about the removal of remnant ‘Grassy Woodland’ mature native vegetation on Hams Road.

  2. A submitter suggests the land should be a mixed passive and active open space reserve that celebrates natural wildlife and water qualities - a linear park/link from the Armstrong Creek corridor to the Waurn Ponds landscape. Lack of open space in Waurn Ponds was also raised.

Officer Response

  1. Officers consider the proposed linear open space along this tributary of Armstrong Creek is an excellent outcome and when fully established would add to the environmental values of the area. The linear reserve will continue the treatment that has occurred along the creek in the Armstrong Creek Growth Area. The creek reserve, 0.9 hectare park and new pathways will help address the lack of open space reserves in Waurn Ponds and add to the recreation options for existing and future residents of the area.

Noise Impacts

  1. Submitters consider the proposed estate would have “unfavourable living situations” with Geelong Ring Rd and Baanip Boulevard traffic noise, railway line noise and the power sub-station. The EPA submitted that Council will need to consider noise from the pump station in their assessment of the application which did not appear to have been included in the noise assessment. Another submitter queried “is there not a duty of care allowing a subdivision so close to the power substation?”

  2. Powercor has objected due to acoustic impacts from the existing Waurn Ponds Zone Substation (WPRZ). It considers the current Overall Subdivision Masterplan and associated technical reporting do not adequately address noise impacts from the WPZS. It has requested changes to the Amendment, draft Permits and Master Plan to address these impacts (see submission summary in Appendix 4).

Officer Response

  1. Condition 6 of the two draft planning permits requires acoustic treatment of dwellings in proximity to the railway line and Geelong Ring Road to address noise impacts.

  2. The issues raised by EPA and Powercor in relation to noise from the substation will be addressed by the Powercor suggested changes to the amendment and permit which Council officers accept.

  3. It is also noted that the developer’s propose to delete the medium density superlots next to the substation from the master plan. Conventional lots will be provided and will need appropriate buffers, restrictions and treatments to address noise issues.

Air Quality

  1. EPA submits that the health impacts of traffic related air pollution near major roads are significant and widely recognised. In view of this, EPA advises the Responsible Authority to consider traffic air emissions from the Geelong Ring Road and other major roads when assessing this application. It says the Responsible Authority should satisfy itself that the application provides a suitable response to this localised source of poor air quality.

Officer Response

  1. The proponent has previously undertaken air quality reports in relation to potential dust and emissions from future quarrying on the Boral land. Council officers will discuss this issue further with the EPA and will request a response to this issue from the proponent which may include another air quality report.

Boral Quarry Buffer

  1. The EPA submission states that the Boral quarry (land) is located to the west and south of the subject site. EPA’s recommended separation distances for industrial residual air emissions (EPA Publication 1518) can be met for the cement clinker grinding, cement manufacturing and quarry (with blasting) operations. However parts of the land being rezoned fall within the recommended 250m quarrying (without blasting) separation distance. A reduced buffer (as per GHD Buffer Study March 2018) is not supported by EPA.

Officer Response

  1. Council officers worked closely with the Department of Jobs, Precincts and Regions – Earth Resources Regulation Branch on the 250m buffer from the Boral land. The following condition is placed on the planning permits to address this issue:

    1. All Lots contained within stages 6,7,8 & 9 (whether wholly or partially) affected by the 250m extractive industry buffer as shown on the endorsed plan shall not be developed without the further written agreement of the Department of Jobs, Precincts and Regions.

Public Consultation

  1. Some submitters expressed that there was a lack of consultation and consideration given to the existing community. One submitter believes the process appears to have been deliberately misleading and would appear to be biased toward the developer.

Officer Response

  1. The amendment and permit application were subject to the usual public exhibition as required by the Planning and Environment Act. The developer did conduct its own information session but this was completely separate to the formal Council run process. Submitters will be able to engage in the planning process further by appearing at an independent panel hearing in the event that Council decides to refer submissions to a Panel.


Attachment 3 – Exhibited Subdivision Masterplan

Overall subdivision masterplan

Attachment 4 – Summary of Submissions

No.

Surname

First name

Address

Suburb

Summary

1

 

 

 

 

Objection due to:

  • Impact of high density housing on traffic in Ghazeepore Rd - not built for amount of current traffic. 2000+ car movements per day will bring stress to current households.

  • One road providing access - construction will cause considerable traffic issues.

  • Development density totally out of step with Waurn Ponds area.

2

 

 

 

 

Pro forma letter and Objection due to:

  • Not a suitable area for the planned subdivision.

  • Flood plain – who would want to build in a creek and the lowest area of land in the vicinity? In a flood those on the south side of the creek would be trapped, with the only exit, across it.

  • Development prevents wildlife access to water in creek , reject c372 proposal, area better served as reserve for wetlands, trees for carbon capture, leave a buffer zone for native wildlife.

  • Capacity of Ghazeepore Rd to handle extra traffic.

  • If housing development required it should be south of Baanip Blvd.

3

 

 

 

 

Objection due to traffic related issues:

  • Increase in traffic from planned development. Difficulty turning right onto Ghazeepore Rd. Could turn left down Grange Park drive to get to proposed new roundabout.

  • House blocks need to be larger to reflect opposite side of Hams Rd & lessen traffic.

  • Proposed roundabout not enough to prevent accidents - prefers traffic lights.

  • Traffic report from 2 years ago doesn't reflect current traffic conditions.

4

 

 

 

 

Pro forma letter.

5

 

 

 

 

Support

  • Barwon Water has reviewed Amendment C372 and raises no objections.

  • Development can be supplied with water and sewerage. Barwon Water servicing advice provided for C276 in 2014 and the general servicing advice remains unchanged.

  • Conditions on draft Permits PP662 & 663/2017 are satisfactory.

  • Masterplan - a sewerage pump station and rising main is required to service this development. Overall subdivision masterplan shows pump station on east side adj Ghazeepore Rd. Consider rezoning this site Public Use Zone 1 – Service & Utility as part of C372.

6

 

 

 

 

Pro forma letter.

7

 

 

 

 

Pro forma letter.

8

 

 

 

 

Objection due to traffic issues:

  • Concerned at through traffic along Grange Park Drive.

  • Traffic report is outdated.

  • Ghazeepore Rd isn’t able to account for increased traffic of 2500+ cars per day. The inter - section at top of Ghazeepore will become a nightmare for residents.

9

 

 

 

 

Objection due to traffic issues:

  • Concerned at through traffic along Grange Park Drive.

  • Traffic report is outdated.

  • Ghazeepore Rd isn’t able to account for increased traffic of 2500+ cars per day. The inter - section at top of Ghazeepore will become a nightmare for residents.

10

 

 

 

 

Objection due to traffic issues:

  • Already experiencing high volumes of traffic along Ghazeepore into Grange Park Dve. Cars speeding along Grange Park, lots of families, young children, fear of an accident happening.

  • Proposed subdivision will add to the already congested roads in and around Ghazeepore, road is unsealed and unsafe for extra cars…recipe for disaster.

  • No problems with the subdivision if the infrastructure e.g extra road and in good maintenance.

  • Road is also used by residents in other areas like Torquay, Anglesea adds to the congestion.

11

 

 

 

 

Pro forma letter.

12

 

 

 

 

Pro forma letter.

13

 

 

 

 

Pro forma letter.

14

 

 

 

 

Objection mainly due to traffic issues:

  • Reps of the overseas company wishing to develop the Hams Road area advised they had not informed Vic Roads etc.

  • Massive extension to the Waurn Ponds railway station car park is about to be made.

  • Ghazeepore Rd would be swamped with vehicles, trucks used to develop.

  • Already problems turning off this road left or right, slowing the traffic, and as a consequence, inconvenience to their annoyance other road users.

  • Vehicles parked in Ghazeepore Rd slow or stop the public and private vehicles.

  • Accidents have already happened on this road. Children in danger of crossing the road.

  • Hams Road area would be better as a public park or Community Centre

15

 

 

 

 

Pro forma letter.

16

 

 

 

 

Pro forma letter.

17

 

 

 

 

Objection due to traffic and density & Pro forma letter.

  • Doesn’t fit with larger blocks north of Hams Rd, should be minimum 1000sq meters

  • Increased traffic on Ghazeepore Rd will need upgrading.

18

 

 

 

 

Pro forma letter.

19

 

 

 

 

Objection due to traffic and density & Pro forma letter.

  • Proposal doesn’t meet community standards or address additional traffic on Ghazeepore Rd

  • Development would be acceptable with larger blocks meaning less traffic movement.

20

 

 

 

 

Objection due to traffic and density:

  • Have lived in Hams Rd last 10 years already had street truncated by a freeway.

  • With proposed plan we will also have no access to exit the area via Grange Park Dve.

  • Out of 3 previous exit points we will now only have one, which is already a traffic problem in the mornings with exiting onto Ghazeepore Rd.

  • Problem will be impacted by huge increase in traffic from proposed subdivision.

  • Recent developments in Armstrong Ck mean Ghazeepore busier drivers more impatient

  • New subdivision will lead to dangerous traffic problems and unrealistic wait times.

  • House blocks are also too small which is not in line with the style of the area

21

 

 

 

 

Pro forma letter.

22

 

 

 

 

Objection:

  • C372 is developer greed, not in best interest of current or future residents.

  • No issue with the decision to rezone the area as general residential, matters are with DDO

  • Development should not be allowed to take place in its current form, would like to see the requirements included in Design and Development overlay *DDO)

    • Lots must be a minimum of 450m2 in the entire development

    • Convert medium density to nature/tree reserves or strict density, parking provisions

    • Pedestrian pathway spaning the entire southern border of the development

23

 

 

 

 

Objection due to traffic and density:

  • Increase of traffic coming out on Hams Rd, the idea of a roundabout will increase the noise and traffic accidents, hold ups at the railway crossing, trucks unable to get onsite as no trucks allowed on Ghazeepore Rd.

  • Concerned about the dirt and dust caused by massive development.

  • Property will go down in value.

24

 

 

 

 

Pro forma letter.

25

 

 

 

 

Pro forma letter.

26

 

 

 

 

Objection due to traffic concerns.

  • Turning onto Ghazeepore from Hams increasingly difficult due to increased traffic from Armstrong Creek and station.

  • Approving a 258 lot subdivision entirely reliant on just one road in and out is ludicrous, especially considering Grange Park drive will not be accessible from Hams Rd.

  • Is for developing the land but with alternate access or at least increased block sizes.

27

 

 

 

 

Support.

28

 

 

 

 

Objection due to traffic, density, social economic:

  • High density housing means higher risk of lower socio-economic housing.

  • Blocks should be no less than 600m2 to allow more spacious and family friendly living.

  • Low water pressure in the area may be worse with high density housing.

  • Already traffic congestion on Ghazeepore Rd, when a bus stops or any vehicle needs to turn Right coming down Ghazeepore into Monterey Rd. Needs to be a turn in pick up point like at the bottom of Ghazeepore Rd at every bus stop and main road where cars turn right.

  • This addition of high density housing will add hundreds if not thousands of cars per day to this ill thought out road ie Ghazeepore Rd.

  • Huge safety issue if dedicated bike lanes were added down Ghazeepore Rd.

29

 

 

 

 

Comments

Quarry Interface:

  • The Boral quarry is located to west and south of the subject site. EPA’s recommended separation distances for industrial residual air emissions (EPA Publication 1518) can be met for the cement clinker grinding, cement manufacturing and quarry (with blasting) operations.

  • However parts of the land being rezoned fall within the recommended 250m quarrying (without blasting) separation distance.

  • Reduced buffer (as per GHD Buffer Study March 2018) is not supported by EPA.

Potentially Contaminated Land:

  • EPA has not undertaken a technical review of the Preliminary Site Assessment. Notes that the report concluded that the potential for contamination from the historical and current uses of the site is considered to be low.

  • Council, as the Planning Authority, must ensure that the land is suitable for its intended use and Council should review the report and determine whether the assessment is appropriate.

Noise

  • EPA has not undertaken a technical review of the noise report. Notes that the report concluded that:

    • Installation of boundary noise barriers 5 m high would enable compliance with the NIRV Recommended Maximum Noise Levels for the ‘day’ and ‘evening’ periods seven days per week.

    • However, it would not be possible to achieve compliance with the NIRV ‘night’ period Recommended Maximum Noise Level over the full extent of the subject land by the use of boundary noise barriers of reasonable dimensions.

  • Council will also need to consider noise from the pump in their assessment of the application which did not appear to have been included in the noise assessment.

Proximity to the Geelong Ring Road:

  • The health impacts of traffic related air pollution near major roads are significant and widely recognised. In view of this, EPA advises the Responsible Authority to consider traffic air emissions from the Geelong Ring Road and other major roads when assessing this application. The Responsible Authority should satisfy itself that the application provides a suitable response to this localised source of poor air quality.

30

 

 

 

 

Objection due to traffic and density:

  • Development out of character with low density development of Grange Park Dve area.

  • Ghazeepore Rd already busy & narrow with traffic crossing centre to avoid parked cars.

  • Will need widening and traffic management btw Waurn Ponds Drive – Baanip Blvd.

  • Hams Rd will need widening and foot paths. Currently foot traffic along Hams Rd is less than safe, increased vehicle traffic will make it more dangerous.

  • Grange Park Drive will need to be closed at its south end not just left turn only to stop Grange Park Drive becoming used as an alternative to Ghazeepore road.

  • A lower density development more in keeping with adjacent properties far more acceptable to those living nearby and put less strain on already congested roads.

31

 

 

 

 

Pro forma letter.

32

 

 

 

 

Pro forma letter.

33

 

 

 

 

Pro forma letter.

34

 

 

 

 

Pro forma letter.

35

 

 

 

 

Objection due to traffic, emergency services and environmental impacts:

  • Concerned at over development of this land, small block sizes and lack of access.

  • Troubled by the unacceptable massive increase this will mean to traffic in the area.

  • Knows from experience how hectic the intersection of Hams, Ghazeepore & Sugergum Drive can be waiting up to 5 minutes to turn, cars banked up at train line.

  • Ghazeepore Rd so busy now and unsafe with many buses and traffic congestion.

  • Proposed roundabout at the intersection will not be adequate to cope with the 3,000+ increase in traffic and unsafe being near the train line potentially a deadly bottleneck.

  • Concerned at unsustainable traffic volume it would create through Grange Park Drive .

  • No additional infrastructure concerning regarding emergency services access.

  • The removal of native vegetation will affect the wild life that rely upon it.

36

 

 

 

 

Pro forma letter.

37

 

 

 

 

Pro forma letter.

38

 

 

 

 

Objection due to traffic and drainage issues:

  • Presently Ghazeepore Rd carrying large amounts of traffic on narrow road not designed to do so.

  • Residents forced to park on nature strips to avoid side swiped and make it safer for cyclists.

  • Developments south of railway line = more residents using Ghazeepore to access station.

  • Another 700 cars to a congested roundabout a short distance from a level crossing can only spell disaster. Can’t believe all your traffic modelling does not make this perfectly clear.

  • Why can’t there be access to Ghazeepore Rd south of the railway line?

  • Is there not a duty of care allowing a subdivision so close to the power sub station?

  • Has looked at land over many years- wet and boggy with natural springs.

  • Can developers be 100% sure homes wouldn’t be subject to movement or moisture problems?

39

 

 

 

 

Pro forma letter.

40

 

 

 

 

Pro forma letter.

41

 

 

 

 

Pro forma letter.

42

 

 

 

 

Objection:

  • Concerns about traffic down Grange Park, Hams and Ghazeepore Rds.

  • Too much potential traffic funnelled into 1 roundabout Hams Rd-Ghazeepore Rd intersection, compounded by level crossing within a short distance of this intersection.

  • Safety concerns about emergency vehicles having access as roads are too narrow.

  • Concerns over the amount and size of allotments as they don't fit into current trends of allotment sizes being average 2000Sqm or larger.

  • Issues with car parking space as its located close to Deakin University.

  • Concerns over no plans for extra infrastructure to cater for 3000 extra cars.

  • No foot paths or extra bicycle lanes so people (Children) are forced onto the road.

  • Concerns at fauna and flora of the creek - special species of frog primal to this area.

43

 

 

 

 

Objection due to safety, traffic and lack of infrastructure:

  • Concern for safety of community due to lack of existing infrastructure, increase in traffic levels due to train station in last 2 years and failure to upgrade roads and infrastructure.

  • Unsafe crossing and travelling down Ghazeepore Rd due to narrow poorly maintained road busy with buses, trucks and cars.

  • No footpaths in Grange Park estate, forced to walk down roads, increasing traffic extremely unsafe for all residents.

  • Understand Geelong is getting busier but no excuse to put the community and lives in danger with ensuring the appropriate safety measures are in place.

  • Access and exit to proposed new estate very limited and bottleneck or disaster will mean safety vehicles have restricted access.

  • Does not align with current environs and neighbourhood overlay and not adequately supported from infrastructure perspective.

  • Upgrade the infrastructure to support new estate which has reasonable sized blocks.

44

 

 

 

 

Objection due to impacts on neighbourhood identity and character:

  • Neighbourhood identity is evident in other parts of Geelong.

  • Moved to Grange Park because of its uniqueness on the outskirts of Geelong with a distinct rural feel. (Larger blocks, no footpaths, open sky etc…). It has its own identity and the existing community would like to preserve it.

  • developers in their haste to earn a large return on their investment have presented a plan which is at odds with the existing homes.

  • Council is to ensure affordable and varied housing options for our growing population; however, another may be to protect and enhance significant environmental, landscape or neighbourhood character areas.

  • urge Council and planners to look closely at the current neighbourhood character and consider the impact of Taylors plan on existing residents.

45

 

 

 

 

Pro forma letter.

46

 

 

 

 

Objection due to traffic:

  • Lives in Peppertree Rise and exit onto Ghazeepore Rd from Grange Park Dve in mornings a very long wait to be able to turn right to take children to school.

  • Lot of traffic coming up and down Ghazeepore Rd. How will all the traffic from this subdivision get out? Ghazeepore Rd is already busy.

  • Going down Baanip to Torquay Rd is not an option in the mornings either because Torquay Road is already jammed.

  • Current roads don’t have the capacity to add that much traffic to.

47

 

 

 

 

Objection due to student housing, traffic, community infrastructure:

  • Current experiencing of living in a cul-de-sac in Waurn Ponds.

  • Student housing may be built in future leading to lower standard of upkeep by residents, more cars per household and more traffic.

  • Traffic access and egress to the development: Proposed roundabout will be restricted access for emergency services and residents.

  • Traffic survey out of date.

  • Impact on local community infrastructure: Waurn Ponds suburb does not have any community shops, halls or other areas which could be considered hubs.

  • Lack of consultation and consideration given to the existing community.

48

 

 

 

 

Objection due to traffic and potential student accommodation:

  • Increased traffic on Grange Park Drive.

  • Concerned for potential student accommodation with 7 or 8 cars per household.

49

 

 

 

 

Objection & Pro forma letter:

  • Only one exit onto Ghazeepore Rd seems ludicrous for the volume of vehicles.

  • Concerns about the additional rail line added to Waurn Ponds that will create more traffic from Sugargum Road.

  • Small house blocks and narrow roads will equate to ghetto in the near future.

  • Aging residents of Ghazeepore Rd have already seen a significant increase in traffic volume since the train station and Baanip Boulevard completed.

  • Finding it very difficult to exit the property by car and dangerous crossing the road to access bus stops and train stations.

  • Traffic flow reduces on Ghazeepore Rd during school times and many uses this road as a ‘speedway’ at other times and overnight.

50

 

 

 

 

Objection due to character, traffic, noise and flooding:

  • Out of character with the existing surrounding residences whichis one of larger homes on larger allotments (2000 sq m and above).

  • Traffic chaos will compromise the safety and ability of "free flow" of traffic up and down Ghazeepore Rd, to future residential developments in the COGG's Armstrong Creek.

  • COGG amendment could be responsible for creating an overcrowded pocket of ghetto living- small allotments, overcrowded, and unfavourable living situations, with Geelong Ring Rd and Baanip Blvd traffic noise, Railway Line noise and the power sub-station.

  • Land is so low lying, the possibility of flooding for many of the allotments.

  • A more appropriate use of this land, is for allotments of 2000 sq m plus.

51

 

 

 

 

Objection due to density and traffic:

  • Proposed development is not sympathetic with the nearby area. Proposed 300 sq m blocks, compared to existing 2000 sq m blocks.

  • Ghazeepore Rd traffic will be horrendous, 2500 plus cars from sub-division will try to access Ghazeepore, competing with growing traffic to the Waurn Ponds Train Station.

52

 

 

 

 

Conditional support:

  • Supports amendment if active transport infrastructure is improved in the area.

  • In 2015 there was a transport infrastructure in Waurn Ponds report stating Ghazeepore Rd needed cross section improvements, traffic calming works, complete the gaps in footpath network and install bicycle lanes. These need to be done as soon as possible.

  • Crossing of Ghazeepore Rd - for traffic calming suggests wombat crossings, especially near the Waurn Ponds Creek path and the train station as pedestrian islands not good enough, they still give full priority to motor vehicles.

  • Amendment will be great for people wanting to live close to the train station or the university if they can get to these safely and easily with active transport.

53

 

 

 

 

Objection due to amenity impacts and traffic:

  • Lives in Chablis Court - nice, quiet and lovely place to live. Doesn’t support such a high density new development in this area as it is not a local norm.

  • May create problems such as heavy traffic that affects emergency service, reduce sense of place, etc.

54

 

 

 

 

Objection due to traffic, character, superlots:

  • Proposed development will create significant increase to traffic and use of Ghazeepore Rd which is already used above a safe capacity.

  • Proposed lot sizes are not consistent with existing properties at adjacent Grange Park .

  • The proposed development does not respect the character of the neighbouring estate.

  • Proposed super lots would be a detrimental overdevelopment of the area and seem unnecessary within this neighbourhood.

55

 

 

 

 

Objection due to density, crime and traffic:

  • The Grange Park Estate as advertised by selling agents as a ‘sort after area’ currently comprises of an average block size of 2000m2 with restrictive covenants.

  • Blocks in new estate down to 250m2 therefore do not conform with the estate.

  • Increased traffic flow on Ghazeepore and Hams Rds. Without any added infrastructure will cause traffic delays and a higher volume of traffic accidents.

  • Increase in crime to the Grange Park Estate due to a significate price drop in housing between Grange Park Estate and the new proposed subdivision housing.

  • Medium Density Superlot has been placed on the corner of the Grange Park Estate which we can only assume will contain multi complex unit blocks (student accommodation and/or public housing) doesn’t conform with Grange Park Estate and will increase crime and traffic to the corner of Hams Rd and Ghazeepore Rds.

56

 

 

 

 

Objection due to lot size, rural feel impact:

  • Proposed development of Hams Rd is completely un realistic with tiny block sizes they take the rural feel away from Waurn Ponds.

  • Not opposed to development but the block sizes are just too small.

  • Ghazeepore Rd is already congested with people coming from Mt Duneed estate.

  • Lives next door to a uni occupied house and already 7 cars parked in our street.

57

 

 

 

 

Objection due to density, traffic, safety:

  • The proposal of more than 400 small, high density blocks is inconsistent with the areas current amenity e.g. 2000m2 + blocks.

  • Proposed subdivision would also create unmanageable increased traffic, environmental impact, construction traffic, 4 cars per home out of Hams Rd.

  • Would impact children, students who walk & catch daily buses, trains to school and crossing roads would become more dangerous for them & slow their daily commute.

  • No consideration to this area along with no planned additional infrastructure and serious concerns regarding emergency service access.

  • This subdivision would impact our safe neighbourhood community greatly.

58

 

 

 

 

Objection due to amenity impacts and traffic:

  • Lives in Chablis Court - nice, quiet and lovely place to live. Doesn’t support such a high density new development in this area as it is not a local norm.

  • May create problems such as heavy traffic that affects emergency service, reduce sense of place, etc.

59

 

 

 

 

Pro forma letter.

60

 

 

 

 

Objection due to density, traffic, flooding:

  • Area will become a high-density residential zone - does not fit the value of properties.

  • With high-density residential, infrastructure will no longer be able to support entire suburb. Roads such as Ghazeepore Rd will suffer overflowing traffic.

  • Primary school and medical centres will also overflow if there is no more to be built.

  • Due to the high-density population and narrow roads, there will never be enough space for parking.

  • Flooding zone as shown on plan is also unreliable as the entire area can store water.

  • Unless residential lot sizes are increased to 650-1200m2 instead of small residential lands such 180m2 will continue objecting this Amendment.

  • Disagree with the developer as they are reckless and only care about their own profits, ignoring the local residents' interest.

61

 

 

 

 

Objection due to environmental impact, density, character, policy, traffic, stormwater:

  • Suggests land should be a mixed passive and active open space reserve that celebrates natural wildlife and water qualities - linear park/link from the Armstrong Creek corridor to the Waurn Ponds landscape. Lack of open space in Waurn Ponds.

  • Suggests land be developed with comparable density to Grange Park Estate.

  • To claim this land is “a logical and orderly extension of the Armstrong Creek West Precinct” (Taylors 2018: 9), fails to recognise the integrity of different residential suburbs and landscapes, clear intent in the Henshall Hansen (1994) vision for Armstrong Creek to spatially, physically and aesthetically ensure a separation from existing Waurn Ponds and Grovedale suburbs.

  • Proposed development is not ‘aligned with’ nor the current amenity of the area, an allotment <200 square metres cannot be found in the existing residential Waurn Ponds suburb.

  • During construction phase 3‐6 vehicle and truck movements and parking arrangements per day will be required per house construction as per normal activities occurring per house construction in Armstrong Creek does not include the waste removal dumpster.

  • Ghazeepore Rd- provides detailed concerns about traffic reports, modelling and data.

  • If subdivision proceeds, Hams Rd bitumen surface west of Champagne Crt intersection be reduced from proposed 20.12m bitumen width to 16.0m.

  • The development proposal fails to address the natural gas infrastructure strategic planning in the Armstrong Creek West PSP.

  • Surface Water Management Strategy is flawed as it’s based on 2014 C276 application not current application.

  • Concerned about request to remove extant ‘Grassy Woodland’ mature native vegetation on Hams Rd, requests that Council re‐state this request as a mandatory requirement through a new Planning Permit condition.

  • Cultural heritage report (Young & Barker 2018) fails to understand the post‐contact heritage of this subject site.

62

 

 

 

 

Pro forma letter.

63

 

 

 

 

Pro forma letter.

64

 

 

 

 

Pro forma letter.

65

 

 

 

 

Pro forma letter.

66

 

 

 

 

Objection due to character and traffic:

  • Lived in Grange Park Dve 16 years in quiet, spacious environment, able to walk, drive safely within neighbourhood. Subdivision would dramatically change this character.

  • Not opposed to development in Waurn Ponds but opposed to overdevelopment.

  • This road is used as a rat run from the growth of the south, making their way to Deakin University, Epworth Hospital and the Ring road. It is a popular route for cyclists.

67

 

 

 

 

Pro forma letter.

68

 

 

 

 

Pro forma letter.

69

 

 

 

 

Pro forma letter.

70

 

 

 

 

Comment on traffic:

  • Not against the rezoning. However if it goes ahead traffic down Ghazeepore will get even busier. It is already bad in the mornings trying to cross with 2 kids on bikes!

  • Some cars fly down Ghazeepore Rd! It's scary. The road down the bottom needs a proper shoulder. Needs to be bike lanes, footpaths and wombat crossings. People before cars.

71

 

 

 

 

Pro forma letter.

72

 

 

 

 

Pro forma letter.

73

 

 

 

 

Pro forma letter.

74

 

 

 

 

Objection due to traffic:

  • Traffic is out of control now, adding 300 more blocks will be alarming.

  • Living with small children riding and walking to school is a safety issue now, adding 3000 more cars to this area will be a nightmare, major safety concern for his children.

75

 

 

 

 

Objection due to traffic, amenity, safety, Settlement Strategy:

  • Request that Council acknowledges over-development of this site will significantly increase traffic movement and congestion, decreasing safety and amenity.

  • Significantly increased levels of traffic- 300+ dwellings within the development, refers to Council report 17 Nov 2015 on the port infrastructure needs for Waurn Ponds

  • Decreased safety for pedestrians, cyclists and motorists.

  • Impact on current amenity of the area: not maintaining neighbourhood characteristic or community expectations.

  • Not aligned with the principles in the Geelong Settlement Strategy.

  • Not physical or geographical connection to Armstrong Creek development.

  • Inadequate consultation process with residents.

76

 

 

 

 

Pro forma letter.

77

 

 

 

 

Objection due to traffic and lot size:

  • Ghazeepore Rd won't be able to support the amount traffic that will be created by this proposed redevelopment.

  • Already a struggle to enter Ghazeepore Rd from Bourbon Way, along with the traffic from this estate plus all the new traffic from Armstrong Creek it will be even worse.

  • Entrance onto Colac Rd from Ghazeepore Rd already ridiculous .

  • Block sizes don't fit with area. Blocks of under 700m2 should not be even considered.

78

 

 

 

 

Objection

  • Traffic increase, environmental impact, impact on amenity of the area.

79

 

 

 

 

Objection

  • Concerns regarding traffic on Hams Rd. Alternate access to development needs to be considered particularly if Grange Park is inaccessible from Hams Rd as plans suggest.

80

 

 

 

 

Pro forma letter.

81

 

 

 

 

Objection

  • Lot sizes are far too small, proposal will lead to excessive population in Hams Rd area, too many vehicle movements onto/ along Ghazeepore Rd effecting the daily movements of all residents of Waurn Ponds who use Ghazeepore Rd.

  • Design of the alternative access through Grange Park Drive is totally inadequate to cater for any increase in traffic in the residential area west of Ghazeepore Rd.

  • Condition of subdivision of Hams Rd land should require lot sizes which generally accord with lot sizes in the adjoining subdivisions of approx.. 2000 square metres.

82

 

 

 

 

Pro forma letter.

83

 

 

 

 

Objection due to traffic and safety, emergency service access:

  • Number of blocks not in line with current residential environment of the Grange Park estates, blocks very small compared to Grange Park.

  • Large volume of blocks will result in gross increase in traffic on Hams & Ghazeepore.

  • Waurn Ponds train station has brought exponential increase in traffic on Ghazeepore .

  • Proposed roundabout will pose a serious safety hazard.

  • Emergency vehicle access to the proposed development.

  • Rushed through without proper community consultation.

84

 

 

 

 

Pro forma letter.

85

 

 

 

 

Pro forma letter.

86

 

 

 

 

Pro forma letter.

87

 

 

 

 

Objection due to traffic, safety, density:

  • Traffic Management Concerns - layout will dramatically increase traffic flow along both Grange Park Drive and Brentwood Way, impacts on amenity.

  • Safety of Pedestrians in Grange Park Estate - absence of footpaths will enhance the exposure and risk of pedestrians to increased traffic flows.

  • Environmental Impact - will eradicate local fauna by removing access to nearby waterways and native vegetation.

  • Incompatibility of proposed development with existing development: The scale (300 lots) and design (200-400 sq. m.) incompatible with Grange Park (1200-3000 sq.m).

88

 

 

 

 

Objection

  • Traffic report is based on data that is over 2 years old and does not consider a fully functioning Waurn Ponds train station and additional residential development.

  • Traffic counts undertaken in middle of university inter-semester break leading to a very subjective “down” estimate of vehicle movements.

  • Queuing of traffic already occurs from the rail crossing.

  • A no left turn will not work on Grange Park Drive.

  • Suitable understanding of local traffic conditions not known or appreciated and a evidence based decision to proceed cannot be considered until independently verified.

  • Precedent set with construction traffic prohibited from Ghazeepore Rd with developments such as Baanip Boulevard – needs to be enforced for this development.

  • Development doesn’t align with amenity of adjoining estates, within 200 metres of 2500m2 blocks, blocks will be less than 10% of sizes within the adjoining estate.

  • Council have referenced that this development is consistent with the Armstrong Creek Plan, it is not. It is wrong to coat tail on this independent assessment.

  • Blasting zone overlay exists 500 metres from the edge of the Boral lease and yet it is proposed to place blocks in the zone.

  • Until Boral formally relinquish this lease under the Mines act and it is rezoned no dwelling can be constructed in this zone.

  • Biggest failing of this proposed development has been on the lack of factual and timely consultation with the stakeholders and community.

89

 

 

 

 

Pro forma letter.

90

 

 

 

 

Pro forma letter.

91

 

 

 

 

Pro forma letter.

92

 

 

 

 

Pro forma letter.

93

 

 

 

 

Pro forma letter.

94

 

 

 

 

Pro forma letter.

95

 

 

 

 

Objection

  • Excessive traffic with inadequate infrastructure.

  • Fully functioning train station in Waurn Ponds, which has already seen a large increase in traffic volume in the area.

  • Likelihood of student housing with number of people sharing one dwelling and increase the number of cars parked in the estate.

  • No footpaths in grange park estate, traffic pose a danger to pedestrians/school children.

  • A blasting zone currently exists where the developers propose to place blocks of land.

  • Development on Hams Rd doesn’t reflect existing areas charm, quiet, peaceful lifestyle.

96

 

 

 

 

Objection

  • New subdivision plans C372 are not in keeping with lifestyle and housing in the area.

  • Ghazeepore Rd/Sugar Gum Drive/Bodega St/Hams Rd, are inadequate as main feeder roads at present to deal safely and efficiently with current traffic/ bus routes.

  • What will happen in times of emergency in C372 and surrounding streets with access only via 1 outlet/inlet at the east end of Hams Rd be safe? e.g. transformer explodes at the Substation at Hams Rd & Ghazeepore Rd, our only exit?

  • Railway station upgrades and access from Sth need to be completed before any more development.

  • Bikes and Pedestrians need to be separated from cars, busses & trucks to ensure safety for all users.

  • Traffic Counts and movements used to model traffic are way out of date.

  • Can garbage trucks turn at end of streets as there is no proper turn area for large units.

97

 

 

 

 

Pro forma letter.

98

 

 

 

 

Pro forma letter.

99

 

 

 

 

Objection due to density, traffic, train station access:

  • Proposed development is for high density living in an area that cannot sustain it.

  • Volume of traffic from Grange Park Drive onto Ghazeepore will be extreme.

  • Emergency services will also be affected by these possible traffic jams.

  • Railway station upgrade and resulting road traffic as more rail commuters will create a bottleneck at the intersection of Hams Rd and Ghazeepore.

  • Has consideration ever been given to constructing a walk-over across the rail line to a new car park on the other side? Space there for commuters from Waralilly, Torquay etc.

100

 

 

 

 

Pro forma letter.

101

 

 

 

 

Objection

  • Overdevelopment of the area, the amount of traffic it will cause, the impact on the amenity of the area, the prospect of dangerous traffic flows, the environmental impact and the lack of consultation by the proponents.

102

 

 

 

 

Objection & Pro forma letter:

  • Some blocks are ridiculously small, some blocks are 182 sq mts in size. No room for outside activities will create social issues.

  • Area comes under Ghazeepore-Anglesea Rd- Baanip Bvd TRIANGLE, and should be all large blocks.

  • Make the blocks big they will sell, not everybody wants small blocks.

  • Traffic on this estate is all directed to the intersection of Hams Rd and Ghazeepore Rd, 250 blocks serviced by one road (Hams Rd) and then one intersection at Ghazeepore.

103

 

 

 

 

Pro forma letter.

104

 

 

 

 

Objection due to consultation, environment, traffic:

  • Public Consultation Process: process appears to have been deliberately misleading and would appear to be biased toward the Developer.

  • Environment: Existing remnant native Grassy Woodland vegetation, located within the Council Road Reserve along Hams Rd is earmarked for removal.

  • Traffic: Concerns due to railway upgrade and will worsen with the development.

105

 

 

 

 

Objection & Pro forma letter:

  • Traffic when the railway crossing gate is down.

  • Smaller blocks and multi dwellings will increase traffic problem.

  • Most households will have at least two cars, current trend of small blocks and narrow streets making it hard for emergency services to pass through.

106

 

 

 

 

Pro forma letter.

107

 

 

 

 

Pro forma letter.

108

 

 

 

 

Objection

  • Area does not have the infrastructure to allow the amount of traffic to sustain so many houses

  • Sizes of the blocks are ridiculously small and will not suit the area it is in.

  • Has issues getting out of driveway because of the traffic moving down Ghazeepore Rd.

  • Road meant for local traffic only yet seems to be a highway for those heading to Mt Duneed, Torquay.

109

 

 

 

 

Objection - Refer to summary of submission 108 (same submission)

110

 

 

 

 

Pro forma letter.

111

 

 

 

 

Pro forma letter.

112

 

 

 

 

Pro forma letter.

113

 

 

 

 

Objection due to acoustic impacts from the existing Waurn Ponds Zone Substation (WPRZ):

  • The Traffic Noise Assessment prepared by Marshall Day Acoustics does not address the potential noise impacts on the development from the WPZS.

  • The noise levels emitted by the WPZS exceed the NIRV Recommended Maximum Noise Levels for the night time period by a significant margin over a large area of land proposed for residential development.

  • The current Overall Subdivision Masterplan and associated technical reporting does not adequately address noise impacts from the WPZS.

  • Powercor requested changes to the Amendment, draft Permits and Master Plan including:

    • Design and Development Overlay (DDO45) - amend DDO45 reference the noise guidelines and stronger protection to the WPZS.

    • Draft Planning Permit – 35 Hams Rd (Permit No: 662/2017) - amend Condition 6 to include noise attenuation treatments related to WPZS.

    • Overall Subdivision Master Plan, Explanatory Report, Noise Assessments - update to address noise from WPZS and demonstrate how compliance will be achieved.

  • Application of GRZ not appropriate adjacent to the WPZS and will result in a land use conflict.

  • Existing Powercor electrical easement on the development site is required to be retained.

114

 

 

 

 

Pro forma letter.

115

 

 

 

 

Pro forma letter.

116

 

 

 

 

Objection

  • Traffic: 2000 extra vehicle movement per day.

  • Problems for emergency vehicles to travel through.

  • Does not fit in current lot sizes, all lot sizes should be no less than 820sqm.

117

 

 

 

 

Objection due to traffic:

  • Increase of small housing blocks will result in high demand on traffic infrastructure & increased traffic congestion on Ghazeepore Rd MUST be taken into consideration.

  • No reason, except financial to do this subdivision, negative impact on our area.

  • Ghazeepore Rd needs speed humps, more off street parking on nature strips needs to be allowed & encouraged from a safety aspect, road itself is too narrow.

118

 

 

 

 

Pro forma letter.

119

 

 

 

 

Objection due to traffic, consultation, environmental and amenity:

  • Impact on traffic flow and increased safety concerns in adjoining roads and local area.

  • Impact on traffic safety, car parking allocated, access for emergency services and number of exits in the sub-division.

  • Lack of consultation associated with the rezoning proposal from Council and developer.

  • Environmental impact potential flooding may arises for house built in the development.

  • The proposed redevelopment does not take into consideration the amenity of the existing area. Blocks in Grange Park Drive are on average 2000m2.

120

 

 

 

 

Refer to summary of submission 88 (same submission)

121

 

 

 

 

Pro forma letter.

122

 

 

 

 

Objection

  • Development will have a major impact on residential peaceful living.

  • Children ride and walk to school from the courts and this will either change how they get to school or create a unsafe environment.

  • Obviously people making decisions on this development don't live in the area.

  • Traffic chaos would be horrendous as it is a significant problem now, especially after the arrival of a train, and a round-about would not fix the problem.

  • Children's bus pick up and drop off is opposite the transfer station. There's only room for one car to pass as the parents wait in their cars for their children to leave or arrive.

  • With only two exits into Hams Rd from the new development and all have to feed into Ghazeepore Rd is a joke (it is already extremely busy).

  • Emergency services entry and exit should raise significant concerns because of only one entry into Hams Rd leading to the development.

  • Ghazeepore and Hams Rd would become high accident areas.

  • Water holes and Dams will be polluted by run off from the house gardens .

123

 

 

 

 

Objection due to traffic, block size, amenity, process, Boral land, environmental:

  • The traffic report is 2 + years out of date, development in the area has been significant since last amendment with Waurn Ponds railway station and Bannip Bvd built.

  • The proposed 2500 car movements each day from C372 has only one way in and out as the land is locked in.

  • he current area is residential, with average block sizes around the 2000m2 mark. The proposed development is not aligned with the current amenity of the area.

  • The process has seemed to favour the developer. Being notified 1 week before the December council meeting (right before xmas) knowing that everyone was busy.

  • Construction of C372 will cause traffic chaos with only 1 road access in and out.

  • Significant problems with the overlay including not being able to build on a third of the block due to the Boral Blast Zone.

  • The land supports a wide and varied habitat for a variety of nature. The flooding in the area when we get high rain is significant.

124

 

 

 

 

Pro forma letter.

125

 

 

 

 

Objection

  • Overdevelopment on one parcel of land that’s not consistent with Grange Park Estate.

  • Close proximity to Deakin University will lead to properties being rented to students leading to problems with parked cars and rubbish, weeds and uncared for gardens.

  • Ghazeepore Rd was not built to take the amount of traffic that uses the road now and will not be able to handle the amount of traffic the development brings.

 

126

 

 

 

 

Pro forma letter.

127

 

 

 

 

Objection

  • Only 1 access road in/out of the entire estate.

  • Train line duplication surely alters the proposal.

  • Blocking Grange Park Drive as an exit point, emergency vehicle access/access out for all people in the event of an emergency Fire/flood etc.

  • Block sizes less than 200sqm encourages a different socioeconomic population group.

  • It encourages student accommodation.

  • Car numbers have been estimated on 2016 figures, which does not take into account of the surround estates that have established.

  • Risk of flooding.

  • Construction phase will have impact on our quality of life for a sustained period of time.

128

 

 

 

 

Objection due to traffic, block size, amenity, process, Boral land, environmental:

  • The traffic report is 2 + years out of date, development in the area has been significant since last amendment with Waurn Ponds railway station and Bannip Bvd built.

  • The proposed 2500 car movements each day from C372 has only one way in and out as the land is locked in.

  • he current area is residential, with average block sizes around the 2000m2 mark. The proposed development is not aligned with the current amenity of the area.

  • The process has seemed to favour the developer. Being notified 1 week before the December council meeting (right before xmas) knowing that everyone was busy.

  • Construction of C372 will cause traffic chaos with only 1 road access in and out.

  • Significant problems with the overlay including not being able to build on a third of the block due to the Boral Blast Zone.

  • The land supports a wide and varied habitat for a variety of nature. The flooding in the area when we get high rain is significant.

129

 

 

 

 

Objection due to safety, traffic, emergency service access:

  • What safety measures has the council made along the waterway for children and pets?

  • Does a fully developed and occupied development place extra load on the sub-station creating additional noise levels, especially peak times of summer and winter?

  • The access roads according to the traffic study are 7.3m wide, no room for a fire truck.

  • High density of the development, limited parking and only two entry points to the development, does development meet emergency exit standards e.g.fire, gas leakage.

  • Will Ghazeepore Rd be widened to cater for buses?

130

 

 

 

 

Pro forma letter.

131

 

 

 

 

Objection due to traffic, safety, amenity:

  • Traffic - development plan shows 300 blocks, all of existing estate only 120 blocks in same footprint, traffic increase through Grange Park estate will be not only inconvenient but a real danger to residents and young children due to no footpaths.

  • Developers own traffic study (TRAFFIX GROUP - Traffic Engineering Assessment), is not only outdated, but contains bus routes that no longer exist.

  • Neighbourhood Amenity - reason his family invested in a larger size house block, in an estate with similar sized blocks, was for that exact reason.

  • To now have this land chopped up into small blocks to maximise developers investment, with potentially 182m2 blocks, will destroy the amenity of this estate.

  • Refers to child care centre Council refused in 2008 and previous Amendment C272.

132

 

 

 

 

Objection

  • Amenity of such a large scale subdivision is inconsistent with the current amenity of the Grange Park estate, gross overdevelopment of a parcel of land this size.

  • Traffic & Community Safety number of proposed lots goes hand in hand with huge increase in traffic expected expected to increase by 2700 vehicle movements per day.

  • Traffic study 2 years old, doesn’t take into account increase in traffic due to the upgraded Waurn Ponds train station, completion of Baanip Blvd and the bus routes on of which no longer exists there are now 2 bus routes 41 & 42 which service this area Proposed roundabout at the Ghazeepore Rd/Sugargum Dv/Hams Rd intersection will make this intersection even more dangerous although it may keep traffic flowing.

  • Difficult for a CFA fire truck to access the houses. This would then also stand for a Waste Collection vehicle or a Bus.

  • After a discussion with P.Smith from planning department, read the planning permits, nothing in the section referring to Powercor Conditions re noise from substation.

  • Area within the 250m Boral Buffer Zone cannot be developed until Boral rescind their right to mine and this has not been done.

  • Requests Council as the Responsible Authority to abandon C372 & Permit Apps 662/2017 & 663/2017 - Hams Rd, Waurn Ponds.

  • If Council choose to review this application, the changes requested are: traffic lights at Ghazeepore/Sugargum/Hams intersection, min 1000m2 lots, requirement in Overlay that blocks over 600m2 must contain a restriction preventing more than one dwelling and being further subdivided.

  • Cut back on residential lots and build a secondary school.

133

 

 

 

 

Objection / Comments – lot sizes, student accommodation:

  • No objection to a development because it is inevitable. Must be limited to an absolute minimum block sizes of 900 m2 to fit with amenity, existing sizes of at least 2000m2.

  • All blocks must accommodate vehicles within property and not on the street.

  • Fear it will be ghetto like development at northern end of Grange Park estate Chablis crt, 2 storey rental houses, 6 bdrms for Deakin Uni students, 6 cars per house.

  • This is a Family oriented area and should be preserved, block sizes as small as 187 m2 is not justifiable as it too small for camping on let alone a permanent dwelling on.

  • Multiple small block opportunities in developments from Waurn Ponds - Torquay - Armstrong Ck supported by public transport to Deakin University for student accom.

134

 

 

 

 

Pro forma letter.

135

 

 

 

 

Objection

  • Overdevelopment of the site.

  • Average lot sizes proposed is 200sqm and is inconsistent with the current average lot size of 2000sqm, developer should create lots 1000sqm minimum.

136

 

 

 

 

Pro forma letter.

137

 

 

 

 

Pro forma letter.

138

 

 

 

 

Pro forma letter.

139

 

 

 

 

Pro forma letter.

140

 

 

 

 

Objection & Pro forma letter:

  • Would be a very irresponsible council that would allow such High Density Housing in an area where the modern blocks are approximately 2000 square metres.

  • Ghazeepore Rd now at its limit for traffic, Hams Rd intersection needs Traffic Lights.

  • Car parking at Waurn Ponds Railway Station is now overflowing.

  • No Left Turn into Grange Park Drive will not work. Grange Park Dve not wide enough for existing traffic flow, if 2 cars are parked opposite, no room for emergency vehicles, children play in Grange Park Drive now. That would cease with this development.

  • No footpaths or walking tracks on Hams Rd or Grange Park Drive.

  • Are we trying to cheapen Geelong with this type of development cheaper blocks, cheaper housing similar to Corio and Norlane.

 

141

 

 

 

 

Pro forma letter.

142

 

 

 

 

Pro forma letter.

143

 

 

 

 

Objection due to traffic and amenity:

  • Traffic: increase in vehicle movements on Hams Rd and safety concerns Mount Duneed bus pick-up and drop off site Hams Rd.

  • Amenity: Grange Park Estate has average block size of 2000m2, the proposed development does not fit in with the amenity of the area.

144

 

 

 

 

Pro forma letter.

145

 

 

 

 

Pro forma letter.

146

 

 

 

 

Objection due to density, student accommodation, traffic:

  • Subdivision takes development of area to all time low, potential of high density living with minimal blocks creation of a ‘slum’ like area aimed at student accommodation.

  • Traffic has increased to the point that trying to get out of street is now more difficult.

  • Ghazeepore Rd traffic has increased greatly as through road to Surfcoast / Princes Hwys and Anglesea Road.

  • Traffic caused by the construction.

  • Planned changes to the Waurn Ponds station, how area cope with commuters?

  • Subdivision sacrifices quality of life for residents for financial gain of a few people.

  • Need for traffic lights on Ghazeepore Rd at Monterey Rd intersection, need roundabout at Burgundy Drive / Ghazeepore intersection to slow hoon drivers.

147

 

 

 

 

Concerns regarding Noise Assessment:

  • Raises following concerns and questions regarding the Noise Assessment:

  • Assessment approach - unattended noise measurements undertaken at 3 locations near western boundary of site. Exposure of noise at 3 selected location would be different as freeway is at a gradient. Inappropriate to use average noise level of these 3 different locations, and use single number to project noise levels across entire site.

  • Assessment year – section 5.1 says traffic conditions for 2029 have been projected and adopted for traffic noise impact, VicRoads has following questions:

    1. According to “Requirements of Developers – Noise Sensitive Use”, adopted noise attenuation requirements should be met for 10 yrs after finalisation of development. Important to confirm the year by when the development is finalised as that determines the assessment year and design year of the noise mitigation. Section 5.1 indicates that 2029 will be the assessment year. This means the finalisation of the development will be in 2019. Consultant needs to clarify whether correct design year has been adopted.

    2. Paragraph under Table 6 and descriptions in Table 7 indicate the prediction noise level is for 2028.. inconsistent with what has been described in Section 5.1. Consultant needs to clarify which year of traffic noise level has been predicted for.

    3. Section 5.1 says an average growth 5% per annum from 2005 to 2016. The daily traffic volumes were calculated for 2028 (or 2029??) based on this growth rate. Following this assumption, it seems the traffic volumes predicted for 2029 would need to be reviewed. The figures as shown in Table 6 seem to be incorrect.

  • Report concludes that road traffic noise levels at site would be below noise objective of 63dB(A). However, due to above points VicRoads, has concerns over this conclusion.

148

 

 

 

 

Pro forma letter.

149

 

 

 

 

Objection

  • Concerned by increase of traffic this proposal will bring 300 housed close to the Deakin Uni will mean houses to rent, 3 bedroom house will mean 3 extra cars and so on.

  • No food paths in this area.

  • What will become of the fresh green open space it will be packed full of small houses.

  • Size of our blocks are not what you will be offering, the small homes don't fit this look.

  • The wildlife...Yes frogs and Eagles will be effected by the move.

  • The school bus that collects at the end of Hams rd will become a hazard.

  • The roundabout won't help the residents of Hams rd who at the moment.

  • Runs a family day care, home and my families will now struggle with parking as the opening to the new houses is opposite our house.

  • Will make it a tight fit for emergency vehicles and the garbage trucks.

  • The noise pollution will increase with it all.

  • The respite centre in Champagne court will make the bus exit and entrance harder.

150

 

 

 

 

Objection & Pro forma letter:

  • Would create significant vehicular movement to and from the area each day, intersection of Hams and Ghazeepore already extremely busy.

  • Traffic issues would be compounded by the proposed increase in residential vehicles from the estate, and increase in train movements affecting the nearby level crossing.

  • ‘No Left Turn’ sign in Hams Rd intersection with Grange Park - naïve to believe that this traffic control sign will prevent vehicles using this route, only way is blocking it.

  • No footpaths on Grange Park Drive and Hams Rd – many walkers, children playing.

  • Amenity - chose to live in this area due to the size of the blocks within the Grange Park Estate, proximity of proposed high density development will ruin the amenity.

  • If lots consistent with Grange Park Estate (min 2,000 sq m) would not object.

151

 

 

 

 

Objection due to traffic and lot size:

  • Increase in traffic on Ghazeepore Rd since Waurn Ponds Train Station and Bannip Bvd opened is significant additional traffic on this road would bring things to a standstill.

  • A roundabout would not be sufficient to manage the large flow of traffic.

  • Nor is the current setup of Ghazeepore Rd, people already travelling from Torquay, Mt Duneed, Charlemont, Armstrong Ck to access station, Epworth Hospital, Deakin Uni.

  • Proposed average block size is also not in keeping with the surrounding properties.

152

 

 

 

 

Support from proponent

  • Taylors continues to act for proponent Waurn Ponds Unit Trust for C372 applying to their land at 35 Hams Rd Waurn Ponds.

  • Submission in favour of C372 and Planning Permits 662/2017 & 663/2017 being approved by Council.

  • Should this matter progress to an independent hearing by Planning Panels Victoria requests opportunity to address the Panel directly.

153

 

 

 

 

Pro forma letter.

154

 

 

 

 

Pro forma letter.

155

 

 

 

 

Pro forma letter.

156

 

 

 

 

Objection

  • The development as such will not create "pleasant residential neighbourhoods in close proximity to jobs, services and recreational facilities" or develop the land "in a manner that will be functional and pleasant into the future ... ".

  • Will create an isolated, congested enclave heavily affected by surrounding water risk and infrastructure noise as indicated by the applicants' own acoustics report.

  • Proposal does not articulate how it relates to the use of Boral quarry land.

  • The proposal is for a pocket of blocks the bulk of which are in the order of 350m2.

  • Out of character with the existing residential area does not amount to a reasonable flow-on or interface with the areas to the north and east of the land.

157

 

 

 

 

Pro forma letter.

158

 

 

 

 

Pro forma letter.

159

 

 

 

 

Pro forma letter.

160

 

 

 

 

Objection due to safety, traffic:

  • Concerned development will present a significant safety concern to residents due to the fact that the proposed plan only has one road access in and out.

  • Proposed subdivision and corresponding numbers of people would have an extremely detrimental effect on local traffic flow.

  • Ghazeepore Rd sign-posted as being ‘local traffic’ access only, not designed for current volume of traffic, edges in poor repair, impossible for cars to park either side of road without impeding traffic.

  • Level train crossing close to the only access road from the proposed estate, would present another significant impact to local safety and traffic delays.

  • The busier Waurn Ponds train station becomes - especially with plans to double the size of the station in future, greater number of trains, boom gates will be down more.

161

 

 

 

 

Objection

  • Out of date traffic report does not take into account the development that has occurred in the area over the last 2 years, including Waurns Ponds Station and Bannip Bvd.

  • With the current residential area of block sizes around 2000m2, it would be most concerning if the council approved the block sizes of 180m2 as proposed.

  • Doesn't oppose a development just opposes an overdevelopment.

162

 

 

 

 

Objection due to traffic and density

  • Traffic data is over 2 years old and out of date. Development in the Waurn Ponds/Armstrong Creek area has been significant and continues at a fast pace.

  • Putting a further 2500 car movements in will create traffic issues in Hams Rd Ghazeepore/Sugar Gum.

  • proposal on Hams Rd allows 2 entrance/exit points for subdivision will dramatically increase number of vehicle movements in area, force all vehicles to Ghazeepore Rd.

  • Proposal doesn't blend with current amenity of the area which has larger blocks. Proposal to have 250 plus blocks in a 'landlocked' area with two exits is ridiculous.

163

 

 

 

 

Objection due to drainage under railway line / comments on cycling:

Cycling Movements

  • DoT supports removal of 1.5m on road cycle lane on the condition the 3m wide shared user path in southern verge of Hams Rd has adequate signage and markings.

  • Requests appropriate treatments at western end of Hams Rd for transition to and from shared path under Princess Fwy.

  • Shared path along linear open space reserve should be 3.5m minimum for its entirety.

  • Suggest wayfinding signage to encourage pedestrian and cycling movements.

Rail

  • Comments in conjunction with Vic Track on stormwater flow being directed to the rail corridor and the existing 1500mm culvert which is blocked with sediment

  • DoT does not support the proposed rezoning until such time that the drainage concerns are resolved to the satisfaction of DoT, VicTrack and the Accredited Rail Operator. Willing to meet to resolve this. Provides conditions for permits.

164

 

 

 

 

Objection to design of stormwater drainage system

  • notes that the “relevant agency comments” on p. 7 of Taylor’s Planning Report that accompanies the application does not include consultation with VicTrack.

  • Seeks more information about proposed drainage design

    • More detailed drawing of location and alignment of the VicTrack culvert

    • Design details of the retarding basin.

  • VicTrack objects to the design of the stormwater drainage system in the planning permit application. VicTrack does not usually permit drainage from new development into the rail corridor and this is reflected in the standard conditions it commonly recommends to Responsible Authorities.

  • Refers to Clause 221ZI of the Transport (Compliance and Miscellaneous) Act 1983, (see extract) which states: “A person must not cause or permit drainage or sewage to flow or empty from any premises occupied by the person onto land or premises the property of Rail Track.”

  • In other respects, VicTrack has no objection to the general layout of the subdivision, as 15 metre wide reserve for electrical lines provides buffer between site and rail corridor.

  • Request the following conditions be placed on permit:

  1. Except with the written consent of VicTrack, no drainage or effluent must enter or be directed to VicTrack land and must be connected to the legal point of discharge.

  2. No waste, soil or other materials from the works are to be stored or deposited on VicTrack land.

  3. All works including hoardings must be undertaken within the subject land and must not encroach onto VicTrack land.

  4. No entry onto railway land is permitted without the written consent of the rail operator.

  5. No permanent or temporary ground anchors are permitted within VicTrack land.



Attachment 5 – Pro forma letter

Pro forma letter - page 1

Pro forma letter - page 2

Attachment 6 – Statement from Proponents

STATEMENT FROM THE PROPONENT – RESPONSE TO SUBMISSIONS

There are a number of themes that emulate from the submissions received from Amendment C372.

Two themes that stand out from the rest are traffic conditions on Ghazeepore Road and the character/density of the proposed development. These two items are discussed below:

Traffic on Ghazeepore Road

Since the opening of both Baanip Bld and the Waurn Ponds Train Station (WPTS), Ghazeepore Road usage, particularly between Hams Road and Burgundy Drive, has increased. The increase in usage from before and after the opening of Baanip Bld and the WPTS has almost doubled based on additional traffic counts recently undertaken by the proponent.

This marked increase in usage is evidenced in the vast majority of submissions received by Amendment C372. Local residents have noted substantial increases in usage coupled with increased waiting times at intersections, increased near misses and other safety concerns. These traffic changes and concerns were constantly referred to at the information session held with local residents and again throughout submissions.

While traffic consultant modelling (and even Council’s own traffic engineers) will attest that development of the subject site and future growth in the area will not create unreasonable usage levels on Ghazeepore Road and its intersections (based on daily volumes, queuing times, AM and PM peak projects etc); we note that local residents are not convinced. This seems to be because while Ghazeepore Road is classified as a ‘collector road’, it is not operating at its collector status potential.

While Ghazeepore Road has significant road pavement area, it has bus stops on the road pavement and also the ability for local residents to park either side of the road, narrowing the two-way passing traffic area of the road.

This situation could be dramatically improved by implementation one or a number of the following actions:

It has been made clear to the proponent that there are no current plans, briefs or budgets from Council to make any improvements to Ghazeepore Road. The proponent is mindful that the proposed development will generate increased usage of Ghazeepore Road (although that increased usage will not be perceptible in the context of current traffic volumes).

The proponent is eager to create and ensure improvements not only for existing residents but also for its future residents and it is therefore willing to make a contribution towards a traffic study and any rectification works recommended by that study that are necessary to improve the capacity, capability and safety of Ghazeepore Road for the current and future community.

The proponent suggests that a significant investment of $500,000 be made available via the development of the subject site to Council. The payment can be facilitated via the Section 173 agreement. While the development of the subject site will likely take some 7 to 8 years to reach completion, it is proposed that a time limit of 2 years is placed on the collection and expenditure of the funding, inclusive of a traffic study and any recommended subsequent capital works so they are completed well in advance of any increased usage of Ghazeepore Road.

Character & Density

A large number of submissions spoke to the local unique character of Waurn Ponds. While the majority of the suburb is characterised by standard residential sized lots between 300 and 600sq.m., there is one estate to the north of the Amendment C372 that has much larger lots of 800sq.m.+ being the Grange Park Estate, from which the vast majority of submissions have originated.

Large lot estates (800sq.m.+) are now extremely rare in Victoria due to environmental pressures and planning policy objectives which encourage maximizing limited urban land resources within township boundaries to minimise urban sprawl into more sensitive environments.

It is appreciated however, that new housing estates should complement and enhance their surrounding circumstances whilst acknowledging environmental pressures and good town planning principles that have been refined after many years of urban planning throughout Victoria.

The creation of a large lot estate (as suggested by many submissions) within the subject site is not good planning and contradicts local and state planning policies. The site is within close proximity to the Waurn Ponds Train Station and as such, urban planning should encourage density to maximise public transport usage, particularly when people can comfortable walk or ride to the station as is the circumstance with the subject site.

The proponent has attempted to acknowledge the neighborhood character and improve the interface with the Grange Park Estate through the provision of large lots on Hams Road of 800sq.m. or larger. The proponent acknowledges the concerns raised in some submissions with reference to the unknown – medium density housing sites and townhouse lots which are perhaps not common in the local area of Waurn Ponds and could be seen as a conflict to character. The proponents therefore propose to amend the plan of subdivision to find a balance between respecting local character and achieving development density objectives. The proposed changes include:

The net result of the above changes is a reduction of 50 dwellings from the subject site and the encouragement of larger lots as opposed to smaller lots. The total number of lots following the changes above is 245. It is noted that restrictions on title will stop these lots from being able to be further subdivided.


[Back to List]

4. Revocation of Flood Prone Area Designation of New Lots at Ashbury Estate, Stages 8 and 10

Source:

City Services - Engineering Services

Director:

Guy Wilson-Browne

Portfolio:

Social and Infrastructure Planning


Purpose

  1. To consider revoking Councils designation of 12 December 2006 of flood affected land Ashbury Estate, Stages 8 and 10 inclusive as liable to flooding pursuant to regulation 153 of the Building Regulations 2018.


Background

  1. Council has a statutory obligation under the Building Regulations 2018 to designate land as liable to flooding where it reasonably knows it to be prone to flooding. Conversely, there is an obligation to remove the encumbrance of designation from land that is no longer considered to be flood-prone.

  2. The current designated flood mapping (Attachment 2) was designated by Council at its meeting of 12 December 2006.

  3. This revocation will result in another stage of new lots in Ashbury Estate fronting 282 – 400 Horseshoe Bend Road, Armstrong Creek being free of their flood prone status, paving the way for owners to build homes on their land.


Key Issues

  1. The flood mapping is subject to a revision due to the subdivision and development at 282 – 400 Horseshoe Bend Road, Ashbury Estate. Prior to subdivision the parent lot was considered to be liable to flooding. This development site, which is also known as Ashbury Estate, Stages 8 and 10 inclusive, achieves flood immunity for newly created lots for flood events up to and including the 100 year Average Recurrence Interval (ARI) event due to approved internal earthworks.

  2. The decision by Council engineers that the flood prone status can be removed includes assessment of internal drainage, road construction and earthworks to contain potential floodwaters from the 100 year ARI event within road and drainage reserves (Attachment 3).

  3. It should be noted that designation is separate to the creation of flood overlays within the Planning Scheme, which generally follows designation. In the case of this development, the planning scheme amendment to create post-development flood zones or overlays is proposed after the design of the proposed precincts.

Councillor Murnane moved, Councillor Nelson seconded -

  1. That Council revoke the Council designation of 12 December 2006 of flood affected land Ashbury Estate, Stages 8 and 10 inclusive as liable to flooding pursuant to regulation 153 of the Building Regulations 2018.

Carried.


Attachment 1

Discussion

  1. No impact to budget.


Community Engagement

  1. A revocation of designation does not warrant public consultation as it constitutes the removal of an encumbrance on land.

  2. Relevant Council databases and flood maps will be revised and updates sent to the Corangamite Catchment Management Authority and Building Control Commission.


Social Equity Considerations

  1. Council have a responsibility to the community to provide the best possible information on areas that are flood prone. The removal of flood prone designation allows owners to build on their land without a special permit from the City, and without raising the floor level of their home. It also reduces the cost of property insurance.


Policy/Legal/Statutory Implications

  1. The City has various statutory responsibilities for drainage management and flood management (prevention, response and recovery) as set out in the Local Government Act 1989, Local Government Regulations 1990, Planning and Environment Act 1987, Building Regulations 2018, Water Act 1989, Subdivision Act 1988 and Emergency Management Act 1986.

  2. The works have resulted in the lots being protected from flooding during a major storm event that has a one per cent probability of occurring in any one year, and occurs on average once in 100 years. This is the required standard for new subdivisions.


Alignment to Council Plan

  1. The recommendations of this report are consistent with Council Plan, in relation to planned sustainable development.


Conflict of Interest

  1. There are no officer direct or indirect interests with respect to this report.


Risk Assessment

  1. Council also has some risk exposure with any failure to disclose the flood-prone status of a property in a Land Information Certificate.

  2. The revocation of the designation is the final step in minimising Council’s risk.


Environmental Implications

  1. The revocation of flood-prone areas designation and designation of revised flood data through the design of this stage is considered unlikely to result in any known adverse environmental impacts.


Attachment 2 - Current Flood Map

Current Flood Map

Attachment 3 - Revised Flood Map

Revised Flood Map


[Back to List]

5. Procurement Policy Update

Source:

Customer & Corporate Services – Property, Procurement & Assets

Director:

Michael Dugina

Portfolio:

Finance


Purpose

  1. To provide an update to the Procurement Policy following the annual review.


Background

  1. The Local Government Act (Vic) 1989 (Act) was amended in 2008 requiring the City to develop, approve and annually review its procurement policy.


Key Matters

  1. The review of the policy is in line with the Council’s obligations under the Act.

  2. The Procurement Policy provides a framework for the purchase of goods, works, and services that emphasises value-for-money while conducting business in a fair and equitable manner. The purpose of the policy is to:

    1. Provide guidance, consistency, and controls over procurement activities;

    2. Demonstrate accountability to rate payers;

    3. Provide guidance on ethical behaviour in public sector purchasing;

    4. Demonstrate best practice elements in purchasing; and

    5. Increase probity of obtaining the right outcome when purchasing goods, works, and services.

  3. This is revision has been based on feedback received from internal and external stakeholders, as well as current trends in the field. A summary of changes to the policy are located on Attachment 2 and the updated Procurement Policy is at Attachment 3.

  4. The changes to the Policy are designed to continue the City’s focus on social and sustainable procurement outcomes. Key elements and outcomes of the Procurement Policy are detailed in Attachment 1.

  5. Through procurement strategies, over the twelve-month period between April 2018 and March 2019, 63.19% of the total Council procurement spend was made with businesses in the Geelong region (or $144,417,104.00).

  6. The City is commencing a Procurement Strategy, which is aimed at addressing the proposed changes to the Act as well as continuing to focus on social and sustainable procurement methods. The Procurement Strategy will provide direction for City in the following key areas:

    1. Maximising the positive social impact of the City’s purchasing power;

    2. Continuing focus on local purchasing;

    3. Focussing on supporting small and medium enterprises including faster payment terms and greater opportunities for work for Geelong-based businesses;

    4. Moving towards a mixed risk and threshold-based procurement model;

    5. Improving procurement systems, allowing for better reporting and savings identification; and

    6. Maximising the combined buying power of G21 Councils collectively.

Councillor Nelson moved, Councillor Murnane seconded -

  1. That Council approve the amended Procurement Policy at Attachment 3 as required under the Local Government Act (Vic) 1989.

Carried.


Attachment 1

Discussion

  1. The City expends in the order of $200 million annually on procuring goods, works and services. Our commitment to local spend, job creation and value for money continues with these policy amendments.

  2. The City is committed to buying from local businesses on a value-for-money basis and supports the engagement of local suppliers, sub-contractors, and apprentices. The City continues to improve its local spend commitments through the application of relevant criteria being applied to tenders and quotations through social and sustainability outcomes, engagement of apprentices and trainees, engagement with local Aboriginal and Torres Strait Islander enterprises and persons, and the ongoing commitment with the GROW initiative.

  3. The criteria for local content and engagement is applied at 10% of the total weighted score for all procurement activity, and 5% applied to the other criteria that is applied when applicable based on the category of goods, services or works being procured.


Community Engagement

  1. There are no community engagement implications associated with updates to this policy, however, once approved the updated policy will be published and communicated via the website.


Social Equity Considerations

  1. The policy articulates the City’s ongoing commitment to the principles of social equity in procurement and strengthened through our partnership with G21’s Region Opportunities for Work Compact (GROW). The City of Greater Geelong has been a signatory to the G21 GROW Compact since November 2015 and continues to be an active supporter of the program.

  2. The City recently partnered with GROW in developing a Lighthouse Project in relation to the City's Civic Accommodation Office Building and Precinct Project, where the tenderers and their consortiums are being encouraged to engage with GROW and become signatories. Tenderers who take the opportunity to become GROW signatories will create employment opportunities for GROW target job seekers, which will have positive social outcomes for local people.

  3. The Policy also encourages any social procurement initiative put forward by a supplier and list a number that the City supports through our strategies and policies.


Policy/Legal/Statutory Implications

  1. Review of the policy is an accordance with Section 186 of the Act.


Alignment to Council Plan

  1. The policy has been reviewed and updated to align with our 30-year vision, Greater Geelong Clever and Creative and the community aspirations.


Conflict of Interest

  1. No officer involved in the preparation of this report have a direct or indirect interest in matters to which this report relates.


Risk Assessment

  1. The policy accords with the Enterprise Risk Management Framework and applies risk management strategies at all stages of the procurement process.


Environmental Implications

  1. The policy states that sustained value must be demonstrated, where applicable in the City’s procurement, including the built and natural environment.


Attachment 2

Summary of Changes within Policy

3.4 - Probity Advisor Requirement

The need for a Probity advisor will still be a requirement for purchases over $1m, however this will based on a risk assessment for each procurement.

4.11 Request for Quote Exemptions

This is formalising an exemption process for processes where three quotes cannot be sought. This may include instances of sole suppliers, emergency purchases or instances where confidential information forms a part of the request.

6.2 Other Local and Sustainable Value

The changes to this section are based on feedback from suppliers around the relevance to some of the criteria.

The changes allow the City to create categories where different criteria can be utilised for maximum effect. For example, the supply of locally sourced employees are more likely to be included in a construction related tender as a opposed to a software solution.

We have also created a criteria to address gender equity and supplier preference social outcomes. The model of supplier preference is the direction the City would like to head into the future, to encourage our suppliers to look at different areas within the municipality that could possibly receive benefits as a result of winning work for the City. An example of this may be a percentage of profits from a job may be directed to local charity or non-sporting not for profit organisation.


[Back to List]

6. Planning Authorisations - Council to Staff

Source:

Planning, Design & Development – City Development

Director:

Gareth Smith

Portfolio:

Sustainable Development


Purpose

  1. To appoint a City officer as an authorised officer under the Planning and Environment Act 1987 (P&EA).


Background

  1. City officers are appointed as authorised officers to exercise statutory powers under various Acts and regulations. Appointments as authorised officers are to individual staff members.

  2. The P&EA regulates enforcement and is reliant on authorised officers acting on behalf of the responsible authority (Council).


Key Matters

  1. Where there is a specific power within an Act, Council should appoint authorised officers pursuant to that Act. This is the case for the P&EA.

  2. A planning staff member has recently been employed by the City and is required to be authorised under the P&EA.

  3. Attachment 2 sets out the Instrument of Appointment and Authorisation under the P&EA and lists the staff member to whom this authorisation applies (instrument).

Councillor Mason moved, Councillor Asher seconded -

  1. In the exercise of the powers conferred by section 224 of the Local Government Act 1989 and the other legislation referred to in the Greater Geelong City Council Instrument of Appointment & Authorisation - Planning & Environment Act 1987 only (instrument) (Attachment 2), Greater Geelong City Council (Council) resolves that the:

    1. member of City staff referred to in the instrument be appointed and authorised as set out in the instrument;

    2. instrument comes into force immediately upon the common seal of Council being affixed to the instrument, and remains in force until Council determines to vary or revoke it;

    3. instrument be sealed.

Carried.



Attachment 1

Discussion

  1. There are no financial implications arising from the subject of this report.


Community Engagement

  1. Relevant City managers have been consulted regarding this recommended appointment and authorisation.


Social Equity Considerations

  1. There are no social equity implications arising from the subject of this report.


Policy/Legal/Statutory Implications

  1. The recommended appointment and authorisation of this staff member complies with the relevant provisions of the P&EA and the Local Government Act 1989.


Alignment to Council Plan

  1. The recommended appointment and authorisation of this staff member supports the delivery of Council planning services.


Conflict of Interest

  1. No City officers who have provided advice in relation to this report have declared a conflict of interest regarding the matter under consideration.


Risk Assessment

  1. There are no significant or high risks associated with the subject of this report.


Environmental Implications

  1. There are no environmental implications arising from the subject of this report.


[Back to List]

7. Audit and Risk Committee Summary Report

Source:

Governance, Strategy & Performance - Governance

Acting Director:

Rebecca Leonard

Portfolio

Leadership and Governance


Councillor Nelson moved, Councillor Kontelj seconded -

That in accordance with Section 89 (2)(h) of the Local Government Act 1989, this report which relates to contractual matters and legal advice be considered at the conclusion of all other business at which time the meeting be closed to members of the public.

Carried.


[Back to List]

Contents | Previous Page: Section A - Procedural Matters | Next Page: Section C - Notice of Motion