Reports tabled at the Ordinary Meeting of Council on Tuesday date held at City Hall, Little Malop Street in Geelong.


  1. Rippleside – Amendment to Planning Permit

  2. Planning Permit Application 1587/2011 for 41-79 Curlewis Road, Curlewis

  3. Windsor Park Master Plan 2012

  4. Review of Council Policy – Electoral Advertising Signage

  5. Belmont Street, Belmont – Proposed Carpark Construction SRC304 – Declaration of Charge

  6. O’Briens Road, Lara – Road Construction SRC317 – Finalisation of Scheme

  7. Princess Street, Drysdale SRC325 – Finalisation of Scheme


Cr S Kontelj declared a Conflict of Interest by Close Association in Agenda Item 1, Rippleside – Amendment to Planning Permit, in that his sister has purchased a property in Balmoral Crescent, North Geelong, and left the meeting room at 7:22pm, prior to discussion.

Cr E Kontelj declared a Conflict of Interest by Close Association in Agenda Item 1, Rippleside – Amendment to Planning Permit, in that his sister has purchased a property in Balmoral Crescent, North Geelong, and left the meeting room at 7:22pm, prior to discussion.


1. Rippleside – Amendment to Planning Permit

Portfolio:

Planning- Cr Macdonald

Source:

Statutory Planning – City Development

General Manager:

Peter Bettess

Index Reference:

Application 647/2004/B


Summary

Cr Macdonald moved, Cr Abley seconded -

That the Responsible Authority considers the proposed amendment of Planning Permit 647/2004 is inappropriate based on the following ground:

  1. The subdivision of the super lots into smaller allotments is inappropriate and will result in lots being created which are less than 300 square metres in area and a poor urban design outcome.

  2. The subdivision will unreasonably reduce views beyond what has been approved by Planning Permit 647/04 and the Rippleside Comprehensive Development Plan, 2000.

  3. To ensure a good urban design outcome for the site, an integrated development should be submitted for the site which would allow Council to properly assess views, energy efficiency, urban design and visual appearance and to ensure that the site is developed in a co- manner that complements and enhances the area. The approval of an integrated development for the site will ensure that lots are not created which may be difficult to develop in the future.

  4. It is not appropriate to stage the provision of the Waterside Pedestrian Link.

  5. The proposal is a significant change from that approved and should be a new application rather than an amendment.

Carried.


Report

Background

The site and surrounding area

The Rippleside Shipyard site occupies a 2.8 hectare parcel of reclaimed land that extends out from the escarpment or cliff below Balmoral Crescent. It is located between the beaches of St Helen’s Park to the north and Rippleside Park to the south. Access to the site is provided via Liverpool Street.

The site is currently developed with a number of industrial buildings and sealed areas, with a jetty located to the east of the site extending over the water. An escarpment is located to the west of the site, apart from the escarpment the site falls towards the bay, with a fall of around 3.5 metres from west to east.

A number of large dwellings have been developed along the cliff top in Balmoral Crescent and these dwellings are designed to capture the views available of the coast and the ocean.

A Locality Map is provided at Appendix 1-1.

A summary of the applicable planning controls is provided at Appendix 1-2.


History of the site

In the 1990’s the Port of Geelong determined that the shipyard, other than as a berth for its tug boats, was surplus to its needs and sold the site to the permit applicant. The permit applicant has also obtained a lease over the Crown land of the seabed under the jetty. The resultant site also includes the foreshore area in front of the site.

Following gazettal of Amendment R245, the land, other than the jetty, was rezoned to Comprehensive Development Zone– Schedule 2 (CDZ2) and an Environmental Audit Overlay was applied to the land. The Comprehensive Development Zone was put into place to ensure the integrated redevelopment of the site which is sympathetic to the surrounding residential and recreational environment.

A Planning Permit (PP647/04) which sought the redevelopment of the site was lodged with Council in May 2004. A total of 100 objections were lodged in relation to the development, along with 65 submissions in support of the proposal. Council failed to make a decision on the application within the time prescribed by the Planning and Environment Act 1987, and an application was made to VCAT. Ultimately VCAT supported the application which allowed for the redevelopment of the site with a convenience shop, restricted recreation facility, marina and more than 98 dwellings (178 dwellings).

The Planning Permit has since been extended by VCAT and is still valid. The development must now commence by 28 February 2013 and must now be completed within six years of the date of commencement.


Proposal

An application has been made to amend the Planning Permit. As the original Planning Permit was issued by VCAT, they are required to decide upon an amendment to the permit.

The amendment seeks to create nine super lots which do not strictly accord with the positioning of buildings that were approved in the original permit, but are generally in the positions of these buildings. The amendment would also allow the further subdivision of the super lots into smaller residential sized allotments.

A Masterplan Lot Schedule is proposed to be a restriction on the further subdivision of the land, with the Schedule setting out the minimum/maximum number of lots which can be achieved from each super lot and the minimum/ maximum frontage for each lot.

It is also proposed to restrict the height of development which is undertaken on the lots. The height restrictions appear to be designed to reflect the approved development under the original planning permit.

The total number of lots which can be developed on the site will be restricted to 124 lots, with only a single dwelling allowed on each lot.

The plan of the proposed superlots is included at Appendix 1-3.

The specifics of the Masterplan Lot Schedule and Masterplan Floor Level and Height Schedule are included in Appendix 4.

It is also proposed to retain the ability to construct Buildings A and H in the manner contemplated by the original permit. Building H is located in the south western corner of the site adjacent to Balmoral Crescent, while Building A is located to the north of the site. In addition, the marina component of the application would be retained, as would the construction of the waterside pedestrian link.

The permit applicant has submitted draft permit conditions to VCAT; however it is considered that these would require further modification. The draft conditions can be seen at Appendix 1-5.


Discussion

Assessment

Key Planning Considerations

It is considered that the amendment could be supported, provided that the matters listed below are adequately addressed:

Timing of subdivision and size of lots

The application seeks approval to create superlots and also to allow the further subdivision of these lots in accordance with a Masterplan Lot Schedule. The Schedule sets out frontages which can be achieved in the further subdivision of the superlots, allowing lots to have frontages of between 5.5 metres and 9.5 metres and depths of 25-30 metres. In every case this would result in the creation of lots which are less than 300 square metres in area.

The objectives and standards of Clause 56 (Subdivision) apply to the assessment of this application. It is noted that Clause 56.04-2 (Lot area and building envelope objective) sets out to ensure that lots are provided with areas and dimensions that enable the appropriate siting and construction of a dwelling, solar access, private open space, vehicle access and parking, water management, easements and retention of significant vegetation and site features. It specifically states that an application to subdivide land that creates lots of less than 300 square metres should be accompanied by information that shows:

No such information has been submitted. In creating new lots, it would be typical to require that the lots can accommodate a building envelope of 9 metres by 15 metres and this cannot be achieved on lots which are proposed to be created.

Concern is raised in relation to the ability of these small lots to be developed with high quality dwellings that achieve a reasonable amenity outcome, especially in circumstances where piecemeal development might result that would include a multiple level, terraced form. The east-west orientation of many of the superlots lots is noted.

It is not considered appropriate to allow the further subdivision of the superlots without the prior approval of the development proposed for the lots or, at the least, a significant proportion of a superlot. That is, via a separate planning permit. It is suggested that the further subdivision of the lots should then reflect the approved development.

It is also noted that the plans showing the superlots are not to scale and discrepancies in the lot sizes appear to exist. For example, Block B is shown in the Masterplan Lot Schedule as having a depth of 30 metres. However, its depth appears less than other Blocks. This may impact upon lot size, the road network and views.


Clarification of what permissions are sought through the permit

On close reading of the permit preamble and the conditions which have been proposed by the permit applicant, it appears that the application also seeks permission for the development of dwellings on the further subdivided lots. As stated, such an approach is not supported. However, it is not known whether this was intended by the applicant.


Urban Design Outcomes

As stated, it is recommended that Council’s position to VCAT should be that the future development of the lots should be subject to a ‘fresh’ application. The provisions of the CDZ2 are such that all buildings and works must be generally in accordance with the Rippleside Urban Design Guidelines, 2000 (RUDG). The RUDG is an Incorporated Document of the Planning Scheme.

The Urban Design Guidelines document is divided into three parts; Context Analysis, Urban Design Framework and Detailed Guidelines. The Detailed Guidelines seek to address issues of detailed design within the parameters established by the urban design framework and are directed towards ensuring that any development does not have unreasonable detrimental impacts on the surrounding community, will be functional and safe, is of a high urban and architectural quality and addresses existing site conditions.

The RUDG is a detailed document which addresses the issue of urban design in relation to the parameters established by the Urban Design Framework. It promotes:

The lots which can be created under the Masterplan Lot Schedule are in all cases less than 10 metres in width, which limits the scope of design solutions for these lots. The number of individual lots and stand-alone developments limits the ability for an integrated design solution for the entire site that adequately respond to the RUDG.


Zone

The CDZ2 seeks to facilitate the development of the site with a development which is sympathetic to the surrounding residential and recreational environment and provides linkages with surrounding open space networks.

At issue is whether the subdivision of the site first into super lots and then into smaller lots would achieve the purposes of the zone. At this stage, the future development of the lots is unknown, however the approval of the subdivision of the land will set parameters into which development can be undertaken. As set out above, the Masterplan Lot Schedule allows for the creation of long narrow lots which can have frontages of between 5.5 metres and 9.5 metres, restricting the type of development which can be undertaken on each lot.


Views

Views and view corridors have consistently been a contentious issue with this site. An analysis of views did not form part of the amendment material.

Presumably, this is because the applicant considers that the super lots are designed to reflect the location of the buildings which were approved under Planning Permit 647/2004, and because the Masterplan Floor Level and Height Schedule is designed to ensure that the maximum height of future development is restricted in line with the development which was approved under Planning Permit 647/2004.

In determining Planning Permit 647/2004, VCAT made the following comment at Paragraph 31 of its decision:

We do however accept the argument put by Mr Finanzio that considerable weight should be given to the Comprehensive Development Plan envelopes as a primary measure or benchmark for determining the extent of built form that the respondent objectors should reasonably expect to have constructed within the view shed of their dwellings.

In approving Planning Permit 647/2004, VCAT accepted that the development was in accordance with the CDP.

However, when the siting of Blocks is checked against the approved development on the site, there are some instances where parts of the blocks, in particular Block G, Block C and K extend beyond the footprint of the development approved under Planning Permit 647/2004. In addition, the ‘squaring off’ of blocks associated with Block J ¾ and Block E could impact on the views available from the properties along Balmoral Crescent. In the case of these two blocks, areas which were undeveloped and which could provide a view corridor function could be developed with buildings and the view corridor opportunity lost.

There is some confusion about the heights which on the Masterplan are shown to Australian Height Datum (AHD), while on the endorsed plans in some cases are shown as Reduced Levels (RL). This is an issue which will need to be raised at VCAT. Assuming that the RLs relate to a height above sea level, the heights of the development have been checked against the Masterplan. There appears to be one discrepancy relating to Block D where the lower section of the building closest to the foreshore is shown on the plans at 9.7 RL, while the Masterplan shows the height as 13.5 AHD. This could impact on views and needs to be drawn to the attention of the Tribunal.


Appropriate permit conditions

Appropriate permit conditions will need to address the servicing of the site with the required infrastructure, provision of the waterside pedestrian waterside link, provision of appropriate supplementary reports and staging of the subdivision.

It is noted that the application continues to provide the waterside pedestrian link, which is a positive outcome as this link will ultimately become an important piece of community infrastructure.

The provisions of the CDZ2 are such that such that the provision of the waterside pedestrian link must be completed to the satisfaction of the Responsible Authority prior to the issue of a Statement of Compliance for any stage of the subdivision. The permit applicant is seeking to stage the construction of the waterside pedestrian link, however this is not considered acceptable and is contrary to the CDZ2.

The draft amended permit that accompanied the application (Appendix 5) is written in a manner that facilitates the outcome sought be the permit applicant. Concern has been raised in relation to aspects of the amended proposal. Various amendments to conditions would be required to address these concerns.


Environmental Implications

It is considered there are no environmental implications for Council associated with this application.


Financial Implications

It is considered that there will be no financial implications for Council associated with this application.


Policy/Legal/Statutory Implications

The proposal has been assessed against the provisions of the Greater Geelong Planning Scheme as detailed in Appendix 2.


Officer Direct or Indirect Interest

No Council officers have any direct or indirect interest in the matter to which this report relates, in accordance with Section 80 (C) of the Local Government Act.


Risk Assessment

It is considered that there will be no risk to Council associated with this application.


Social Considerations

It is considered that there will be no social implications for Council, however it is important to ensure that the waterside pedestrian link is provided as part of Stage 1 of the subdivision. This will ensure that the link is available for public use at an early stage.


Communication

The application was referred to various internal departments of Council for comment. None have raised concern with the application.


Appendix 1-1

Locality Map

Locality Map of 1-3 Balmoral Crescent, Rippleside showing the subject site


Appendix 1- 2

Greater Geelong Planning Scheme

Zone

Comprehensive Development Zone – Schedule 2

The subject site and is located in the Comprehensive Development Zone – Schedule 2. The purpose of the zone is:

An application to subdivide land for residential development, other than an application to

subdivide land into lots each containing an existing dwelling or car parking space, must meet the requirements of Clause 56


Overlay

Environmental Audit Overlay

The Environmental Audit Overlay applies to the site, the purpose of the overlay is:

Permit triggers

The planning permit triggers relevant to the amendment are:

Clause 37.02-3– Subdivision of land.


THE PLANNING POLICY FRAMEWORK

11– Settlement

Planning is to anticipate and respond to the needs of existing and future communities through provision of zoned and serviced land for housing, employment, recreation and open space, commercial and community facilities and infrastructure.

Planning is to recognise the need for, and as far as practicable contribute towards:

Planning is to prevent environmental problems created by siting incompatible land uses close together.

Planning is to facilitate sustainable development that takes full advantage of existing settlement patterns, and investment in transport and communication, water and sewerage and social facilities.

13.01-1–Coastal inundation and erosion

Objective

To plan for and manage the potential coastal impacts of climate change.

13.03-2 Erosion and landslip

Objective

To protect areas prone to erosion, landslip or other land degradation processes.

15.01-1 Urban design

Objective

To create urban environments that are safe, functional and provide good quality environments with a sense of place and cultural identity.

15.01-2 Urban design principles

Objective

To achieve architectural and urban design outcomes that contribute positively to local urban character and enhance the public realm while minimising detrimental impact on neighbouring properties.

15.01-3 Neighbourhood and subdivision design

Objective

To ensure the design of subdivisions achieves attractive, liveable, walkable, cyclable, diverse and sustainable neighbourhoods.

15.01-5 Cultural identity and neighbourhood character

Objective

To recognise and protect cultural identity, neighbourhood character and sense of place.

15.02-1 Energy and resource efficiency

Objective

To encourage land use and development that is consistent with the efficient use of energy and the minimisation of greenhouse gas emissions.

16.01-1 Integrated housing

Objective

To promote a housing market that meets community needs.

16.01-4 Housing diversity

Objective

To provide for a range of housing types to meet increasingly diverse needs.

21.06-2 Urban growth

Objectives

21.06-3 Urban consolidation

Objectives

21.06-4 Neighbourhood character

Objectives

Appendix 1-3

Plan of Superlots

Plan of superlots


Appendix 1-4

Masterplan Lot Schedule and Masterplan Floor Level and Height Schedule

Masterplan Lot Schedule and Masterplan Floor Level and Height Schedule


Crs S and E Kontelj re- entered the meeting room at 7:36pm

Cr Farrell declared a Conflict of Interest by Close Association in Agenda Item 2, Planning Permit Application 1587/2011 for 41-79 Curlewis Road, Curlewis in that the applicant is known to her. Mr Murray employed her son during his carpentry apprenticeship and she worked with him some years ago, and left the meeting room at 7:36pm, prior to discussion.
[Back to List]

2. Planning Permit Application 1587/2011 for 41-79 Curlewis Road, Curlewis

Portfolio:

Planning - Cr Macdonald

Source:

Economic Development, Planning & Tourism

General Manager:

Peter Bettess

Index Reference:

Application 1587/2011


Summary

Cr Macdonald moved, Cr Harwood seconded -

That the Responsible Authority having considered all matters which the Planning and Environment Act, 1987, requires it to consider, decides to Grant a Planning Permit for Change of Use to Winery and Place of Assembly (Function Centre) and Buildings and Works Associated with Driveway and Car Park at 41-79 Curlewis Road, Curlewis in accordance with the plans submitted with the application and subject to the following conditions:

Amended plans

  1. Prior to the commencement of the use and/or development, three (3) copies of amended plans to the satisfaction of the Responsible Authority must be submitted to and approved by the Responsible Authority. When approved, the plans will be endorsed and will then form part of the permit. The plans must be drawn to scale with dimensions and must be generally in accordance with the plans submitted with the application but modified to show:

    1. The location of the outdoor area which is to be used;

    2. The use of self-closing doors in the building.

Endorsed plans

  1. The use and development as shown on the endorsed plans must not be altered without the written consent of the Responsible Authority.

Winery hours

  1. Unless otherwise approved in writing by the Responsible Authority, the winery may only operate between the following hours:

Function centre

  1. Unless otherwise approved in writing by the Responsible Authority, the function centre must only operate between the following hours:

  2. The function centre hereby approved must not operate more than ten times per calendar year. A diary must me kept of functions held and must be made available for inspection on request by the Responsible Authority.

  3. Unless otherwise approved in writing by the Responsible Authority, when the function centre is in operation the winery must not be open to the public.

  4. Unless otherwise approved in writing, not more than 200 persons may be present on the premises at any one time, to the satisfaction of the Responsible Authority.

  5. While the function centre is in operation, every effort must be made to ensure that the doors to the premises are kept closed and the doors must not be kept propped open to the satisfaction of the Responsible Authority.

Amenity

  1. All security alarms or similar devices installed on the land must be of a silent type in accordance with any current standard published by Standards Australia International Limited and be connected to a security service to the satisfaction of the Responsible Authority.

  2. External amplified equipment, loud speakers or public address system must not be used in conjunction with the use hereby permitted.

  3. The amenity of the area must not be detrimentally affected by the use or development through the:

    1. Transport of materials, goods or commodities to or from the land;

    2. Appearance of any building, works or materials;

    3. Emission of noise, artificial light, vibration, odour, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil;

    4. Presence of vermin;

    to the satisfaction of the Responsible Authority.

  4. No bottles or other waste materials may be removed from the site or emptied into external bins between the hours of 6:00pm and 9:00am.

  5. Outdoor lighting must be designed, baffled and located to the satisfaction of the Responsible Authority to prevent any adverse effect on adjoining land or road reserve.

  6. Noise levels emanating from the premises must not exceed those required to be met under State Environment Protection Policy (Control of Music from Public Premises), No. N-2.

Construction of driveway and car parking areas

  1. Before the use starts areas set aside for parked vehicles and access lanes as shown on the endorsed plans must be:-

    1. Constructed to the satisfaction of the Responsible Authority;

    2. Properly formed to such levels that they can be used in accordance with the plans;

    3. Surfaced with an approved material for all weather use to the satisfaction of the Responsible Authority.

    4. Drained and maintained to the satisfaction of the Responsible Authority.

    Parking areas and access lanes must be kept available for these purposes at all times and maintained to the satisfaction of the Responsible Authority.

Construction of vehicle access

  1. Prior to the use commencing, a rural vehicle crossing at least 4 metres wide, and constructed generally in accordance with Council's standard detail drawing (CGG603, with modifications to include a minimum 4 metre radial on both edges of the crossing that abuts Curlewis Rd and a diversion in the table drain to allow provision of a culvert close to the property boundary to the satisfaction of the Responsible Authority.

Expiry

  1. This permit will expire if one of the following circumstances applies:

    1. The use and/or development is not commenced within two (2) years of the date of this permit.

    2. The development is not completed within four (4) years of the date of this permit.

    3. The Responsible Authority may extend the periods referred to if a request is made in writing within three (3) months of the date of expiry.

Carried.


Report

Background

The site and surrounding area

Proposal

A new vehicle accessway and internal access will be constructed to serve the new uses, along with a large car parking area. The new driveway is six metres in width and will be constructed with a gravel surface while 1200 square metres of car parking area will be provided. Overflow parking can also be accommodated in nearby paddocks.

It is proposed to operate the winery between the following hours:

The longer hours are sought to allow visitors to do wine tastings in the evening.

It is proposed to operate the place of assembly between the following hours:

The cellar door sales will not be in operation when a function is being held and the function centre will not operate more than ten times in a calendar year. Seating within the building is informal, with tables and chairs being set out in a similar way as to a restaurant. A small outdoor area will be available for smokers, located to the east of the building.

A licence is required to sell liquor from the site; the applicant has advised that a beer and wine producer’s licence will be sought. There is no need for a planning permit for this type of licence.


Discussion

Assessment

Key Planning Considerations

The key considerations in this case are considered to be:

These matters are considered below.


State and Local Planning Policies

There is policy support within the planning policy framework for tourism uses in rural areas. The use of the site for a winery and limited function centre complies with these policies, assisting to maximise the tourism potential of the Bellarine Peninsula, which is increasingly becoming known as a wine destination. Although it is recommended to restrict the hours of operation of the winery beyond what was applied for, it is still considered that the use can contribute to the region’s potential as a tourist destination. It is considered that there needs to be a balancing of the needs of the business and the purpose of the zone, along with the reasonable expectations for the zone.

Planning policy also seeks to ensure that noise emissions are controlled. To this end, planning permit conditions restrict the hours of operation of the uses, such that the use is not likely to unreasonably impact on the amenity of the area through noise emissions and other forms of disturbance.


Zone

The site is located in the Farming Zone; the purpose of the zone is to:

It is considered that the use of the land is complementary to the purpose of the zone. The use allows, predominantly, for a cellar door sales operation which complements the agricultural use of the land, where grapes are grown. The agricultural use will continue to operate from the site.

It is considered that the hours proposed are excessive having regard to the purpose of the zone. It is not considered reasonable to allow a cellar door sales operation, which could accommodate 200 people, to operate for the hours proposed. There are potential noise impacts from people using the venue and also from vehicle movements. These noise impacts could extend into traditional sleeping hours and cause an unreasonable amenity impact. It is noted that there are a number of dwellings in the general vicinity of the site and as the area is located in the Farming Zone, there is a low level of background noise. As a result, noise generated by the use which is proposed is likely to be more evident than it may be in a different location where there is higher levels of background noise and a reasonable expectation that a late night use would operate.

The cellar door sales component would operate beyond the hours approved for other cellar door sales businesses on the Bellarine Peninsula, which generally operate until 6:30 in the evening. This is a point of difference which could mean that the proposed cellar door sale is quite popular and bus tours would end at this site. It is not considered appropriate to allow the use to operate late into the night, particularly when the building in which it is to operate is set up in the manner of a bar/ tavern. It is considered that a 7pm closing time better aligns with the zoning of the site and the reasonable expectations of activity which could occur in this zone.

The function centre will be allowed to operate until 11:30pm, given that this occurs only ten times per calendar year, these hours have been accepted.

In relation to the decision guidelines of the Farming Zone, it is considered:


Environmental Implications

It is considered that there will be no environmental implications for Council in the granting of this permit.


Financial Implications

It is considered that there will be no financial implications for Council in the granting of the permit.


Policy/Legal/Statutory Implications

The proposal has been assessed against the provisions of the Greater Geelong Planning Scheme as detailed in Appendix 2-2.


Officer Direct or Indirect Interest

No Council officers have any direct or indirect interest in the matter to which this report relates, in accordance with Section 80 (C) of the Local Government Act.


Risk Assessment

It is considered that there will be no risk to Council in the granting of this permit.


Social Considerations

It is considered that the hours proposed are excessive having regard to the purpose of the zone. It is not considered reasonable to allow a cellar door sales operation, which could accommodate 200 people, to operate for the hours proposed. There are potential noise impacts from people using the venue and also from vehicle movements. These noise impacts could extend into traditional sleeping hours and cause an unreasonable amenity impact.


Communication

The application was referred to various internal departments of Council for comment, as can be seen in the report.


Appendix 2-1

Locality Map

Locality map for 41-79 Curlewis Road, Curlewis

41-79 Curlewis Road, Curlewis


Appendix 2-2

Greater Geelong Planning Scheme

Definition and Nesting

Place of Assembly is defined as follows:

Land where people congregate for religious or cultural activities, entertainment, or meetings.

Function Centre is defined as follows:

Land used, by arrangement, to cater for private functions, and in which food and drink may be served. It may include entertainment and dancing.

Winery is defined as follows:

Land used to display, and sell by retail, vineyard products, in association with the growing of grape vines and the manufacture of the vineyard products. It may include the preparation and sale of food and drink for consumption on the premises.


Zone

Farming Zone

The subject site and surrounding properties are located in the Farming Zone. The purpose of the Farming Zone is:


Overlay

No overlays apply to the site.

Permit required clause and condition

A planning permit is triggered for this application pursuant to the following clauses of the Greater Geelong Planning Scheme:


Restrictive Covenant

There are no restrictive covenants registered on Title. A right of carriageway over the laneway to the rear (east) benefits Lots 3 and 4 (the Palais).


Cultural Heritage Management Plan (CHMP)

The Aboriginal Heritage Regulations 2007 specify the circumstances in which a Cultural Heritage Management Plan is required for an activity or class of activity.

Areas of cultural heritage sensitivity are defined within Part 2 - Division 3 of the Aboriginal Heritage Regulations 2007. Part 2 - Division 3 does not identify the site or part of the site as within an area of cultural heritage sensitivity.

In accordance with the above, a Cultural Heritage Management Plan is not required.


Coastal Hazard Vulnerability Assessment

Clause 13.01 of the State Planning Policy Framework requires Councils to plan for and manage the potential coastal impacts of climate change. To meet the objective of Clause 13.01, Councils must, inter alia:

The criterion that Council has adopted to trigger the requirement for a Coastal Hazard Vulnerability Assessment (CHVA) to be prepared for a proposal is: the site must have an AHD (Australian Height Datum) level of less than 5m and must be within 1km of the coastline or Barwon River.

The subject site is over one kilometre from the coast and the Barwon River. Therefore a CHVA was not required for this proposal.


Clause 52.06– Car parking

There is a requirement for car parking for a place of assembly at a rate of 0.3 spaces to each seat or each square metre of floor area, this equates to a requirement for 70 car spaces. A total of approximately 30 car spaces are provided on site in an informal gravel area. This is considered acceptable based on the fact that a number of people will travel to functions or wineries on buses. There is also the ability for overflow car parking to be accommodated on the site in a nearby paddock. Consequently, all car parking associated with the use can be accommodated on the site without impacting on the road network or adjoining properties. It is considered that an adequate level of car parking is provided on the site and the application accords with the decision guidelines of Clause 52.06-1.


THE STATE PLANNING POLICY FRAMEWORK (SPPF):

SPPF

17.03-1– Facilitating tourism

To encourage tourism development to maximise the employment and long-term economic, social and cultural benefits of developing the State as a competitive domestic and international tourist destination.

14.01-2– Sustainable agricultural land use

Objective

To encourage sustainable agricultural land use.

13.04-1– Noise abatement

Objective

To assist the control of noise effects on sensitive land uses.

THE LOCAL PLANING POLICY FRAMEWORK (LPPF) AND MUNICIPAL STRATEGIC STATEMENT (MSS):

MSS

The following policies of the Municipal Strategic Statement are applicable to this application:

21.07-5– Rural areas

Objectives

21.07-6– Tourism in rural areas

Objectives

To support tourism development in rural areas that respects the open farmed landscape of the area, and contributes to the economy.

LPPF

There are no Local Planning Policies relevant to this application.


Appendix 2-3

Amended plans

  1. Prior to the commencement of the use and/or development, three (3) copies of amended plans to the satisfaction of the Responsible Authority must be submitted to and approved by the Responsible Authority. When approved, the plans will be endorsed and will then form part of the permit. The plans must be drawn to scale with dimensions and must be generally in accordance with the plans submitted with the application but modified to show:

    1. The location of the outdoor area which is to be used;

    2. The use of self-closing doors in the building.

Endorsed plans

  1. The use and development as shown on the endorsed plans must not be altered without the written consent of the Responsible Authority.

Winery hours

  1. Unless otherwise approved in writing by the Responsible Authority, the winery may only operate between the following hours:

Function centre

  1. Unless otherwise approved in writing by the Responsible Authority, the function centre must only operate between the following hours:

  2. The function centre hereby approved must not operate more than ten times per calendar year. A diary must me kept of functions held and must be made available for inspection on request by the Responsible Authority.

  3. Unless otherwise approved in writing by the Responsible Authority, when the function centre is in operation the winery must not be open to the public.

  4. Unless otherwise approved in writing, not more than 200 persons may be present on the premises at any one time, to the satisfaction of the Responsible Authority.

  5. While the function centre is in operation, every effort must be made to ensure that the doors to the premises are kept closed and the doors must not be kept propped open to the satisfaction of the Responsible Authority.

Amenity

  1. All security alarms or similar devices installed on the land must be of a silent type in accordance with any current standard published by Standards Australia International Limited and be connected to a security service to the satisfaction of the Responsible Authority.

  2. External amplified equipment, loud speakers or public address system must not be used in conjunction with the use hereby permitted.

  3. The amenity of the area must not be detrimentally affected by the use or development through the:

    1. Transport of materials, goods or commodities to or from the land;

    2. Appearance of any building, works or materials;

    3. Emission of noise, artificial light, vibration, odour, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil;

    4. Presence of vermin;

    to the satisfaction of the Responsible Authority.

  4. No bottles or other waste materials may be removed from the site or emptied into external bins between the hours of 6:00pm and 9:00am.

  5. Outdoor lighting must be designed, baffled and located to the satisfaction of the Responsible Authority to prevent any adverse effect on adjoining land or road reserve.

  6. Noise levels emanating from the premises must not exceed those required to be met under State Environment Protection Policy (Control of Music from Public Premises), No. N-2.

Construction of driveway and car parking areas

  1. Before the use starts areas set aside for parked vehicles and access lanes as shown on the endorsed plans must be:-

    1. Constructed to the satisfaction of the Responsible Authority;

    2. Properly formed to such levels that they can be used in accordance with the plans;

    3. Surfaced with an approved material for all weather use to the satisfaction of the Responsible Authority.

    4. Drained and maintained to the satisfaction of the Responsible Authority.

    Parking areas and access lanes must be kept available for these purposes at all times and maintained to the satisfaction of the Responsible Authority.

Construction of vehicle access

  1. Prior to the use commencing, a rural vehicle crossing at least 4 metres wide, and constructed generally in accordance with Council's standard detail drawing (CGG603, with modifications to include a minimum 4 metre radial on both edges of the crossing that abuts Curlewis Rd and a diversion in the table drain to allow provision of a culvert close to the property boundary to the satisfaction of the Responsible Authority.

Expiry

  1. This permit will expire if one of the following circumstances applies:

    1. The use and/or development is not commenced within two (2) years of the date of this permit.

    2. The development is not completed within four (4) years of the date of this permit.

    The Responsible Authority may extend the periods referred to if a request is made in writing within three (3) months of the date of expiry.

Cr Farrell re-entered the meeting room at 7:42pm

Cr Fisher declared an Indirect Interest in Agenda Item 3, Windsor Park Master Plan 2012, in that her residence backs onto Windsor Park, and left the meeting at 7:42pm prior to discussion.


[Back to List]


3. Windsor Park Master Plan 2012

Portfolio:

Sport & Recreation - Cr Mitchell

Source:

Projects, Recreation & Central Geelong

A/General Manager:

Scott Cavanagh

Index Reference:

Property: #291789, 39A Rose Avenue, Norlane

Summary

Cr Granger moved, Cr Harwood seconded -

That Council endorses the Windsor Park Master Plan (2012).

Cr Richards entered the meeting room at 7:42pm

Carried.


Cr Granger left the meeting room at 7:48pm


Report

Background

Windsor Park, Rose Ave Norlane, provides a range of sport, recreation and community facilities, including two ovals and associated pavilions, two netball courts, skate park, cricket nets, playground and open space areas. Windsor Park is also home to the Norlane Community Centre and Norlane RSL and shares a boundary with the Northern Bay P-12 College - Tallis St P-6 Campus.

The sport and recreation activities based at Windsor Park are primarily provided by the North Shore Recreation Club – incorporating football, netball, cricket and little league.

The aim of the Windsor Park Master Plan (2012) (copy available in Councillors Lounge) is to examine the existing Windsor Park Master Plan (1997) and develop a guide for the future development of the reserve having regard to user and community aspirations, whilst enhancing the natural ambience and character of the reserve.


Discussion

The purpose of this report is for Council to endorse the Windsor Park Master Plan (2012).

The aim of the Windsor Master Plan is to examine the existing Windsor Park Master Plan (1997) and develop a guide for the future development of the reserve. The planning process involved a review of background information, including a detailed review of the existing Windsor Park Master Plan (1997).

A summary of the level of completion of recommendations from the existing Master Plan is included in the Master Plan (2012).

Key outcomes of the Windsor Park Master Plan include the upgrade of pedestrian links, improved traffic circulation and parking, upgrades to sports facilities and improved appearance of the reserve through landscaping.

Formal reference groups were established to provide input into the planning process:

The consultation and research undertaken during the Windsor Park Master Plan confirmed a number of opportunities for implementation within the reserve:

Initial consultation with key stakeholders through the PCG, PWG and PRG has indicated support for the vision, objectives and resultant report.

Key recommendations of the Windsor Park Master Plan (2012) include:

Implementation of recommendations will improve the overall amenity and functionality of the reserve, including improved access to the wider community for informal use of open space, enhanced traffic management, safety and pedestrian circulation. The current and future needs of all stakeholders and the wider community have been considered in allowing for improved facilities and amenities.


Environmental Implications

The Windsor Park Master Plan (2012) seeks to support initiatives that facilitate long-term environmental sustainability within the park, including water use, vegetation management and ongoing maintenance.

The Windsor Park Master Plan (2012) recognises that the community values the reserves ability to cater for a wide range of uses. The Windsor Park Master Plan (2012) respects the initiatives of previous Councillors and Council Officers in setting aside this space for public recreation. Future development will seek to enhance the landscape quality of the reserve, promote improvement of facilities, infrastructure and functioning for broad community use, whilst retaining the natural ambience of the precinct.

Community feedback gained during consultation has indicated a strong desire for the improvement of the landscape quality of the reserve, including the planting of trees and other vegetation within the reserve.


Financial Implications

The Windsor Park Master Plan (2012) provides a number of recommendations and indicative costings for recommended projects.

Where implementation of specific recommendations requires a new capital allocation from Council, these will be presented and considered as part of the overall annual budget process. Opportunities for contributions from Government, Clubs and other funding sources are listed against specific projects within the Master Plan.

The implementation plan provides a broad estimate of cost specific to each of the recommended actions. These actions are assessed as Mandatory, Critical, High, Medium and Low to guide Council decision making in terms of development.

The Windsor Park Master Plan (2012) outlines the recommended implementation schedule and indicative capital costs for the works identified in the Master Plan. The total cost of all works is estimated at $2,537,850 and is represented by the following prioritised breakdown:


Mandatory:

Nil

Critical:

Nil

High:

$957,840

Medium:

$870,950

Low:

$709,060


Whilst the adoption of this report does not have any direct financial implications, the listed actions within the plan will cost in the order of $2,537,850. It is expected that the Master Plan will be implemented over an approximate timeframe of 10-15 years.


Policy/Legal/Statutory Implications

The Equal Opportunity Act (1995) protects Victorians against discrimination based on a wide range of personal characteristics or associations. These include (but are not limited to) age, gender, ethnicity, disability, pregnancy, religion and employment status. The Windsor Park Master Plan (2012) recognises that all community members have equal rights to participate in and enjoy the benefits of sport and physical activity. The development of the reserve will consider design solutions to help facilitate access for all.


Officer Direct or Indirect Interest

No Council staff or persons engaged under contract have a direct or indirect interest in the development of the Windsor Park Master Plan (2012).


Risk Assessment

The Windsor Park Master Plan (2012) provides guidance for the development of this important piece of open space over the next 10-15 years.

There are no immediate risks associated with this report. Appropriate risk management measures will be put in place when implementing the recommendations of the report.


Social Considerations

The Windsor Park Master Plan (2012) will enhance recreational and social experiences within the park. Improvements in the design, layout and functionality of the reserve, together with improved landscape and path networks will increase safety for visitors to the park.

The Windsor Park Master Plan (2012) recognises that participation in sport and physical activity brings about a range of personal, social, health and economic benefits for individuals and communities.

Windsor Park has an established history of active recreational use, including formal sports such at football, cricket and netball. Future development of the reserve will support ongoing use of the area for a range of formal and informal sport and recreation activities.

The Windsor Park Master Plan (2012) recognises that formal sporting clubs support more that just participation in physical activity. Sporting clubs are recognised as providing a range of broader benefits to the community, including contributions to social capital, community cohesiveness, community connection and building local leaders.


Communication

The Windsor Park Master Plan (2012) has been overseen by a three tiered management structure. These include:

The planning process involved a comprehensive review of background material and the establishment of formal reference groups to guide the planning process. The project has involved extensive consultation with stakeholders, Council staff and the community.

The main consultation tasks have included:

In total, 83 individual surveys were completed. A summary of consultation results and key findings are included in Appendix 4: Community Consultation Findings of the Windsor Park Master Plan (2012) (previously supplied). The consultation results have been used to inform the identification of critical issues and major themes within the Windsor Park Master Plan (2012).

The draft Windsor Park Master Plan was released by Council for public comment between 4 November 2011 and 2 December 2011. The following steps were taken to provide opportunities for the community to provide feedback on the report:

A summary of the comments received by Council regarding the draft Windsor Park Master Plan is provided below:

Respondent

Summary of comments

Response

Mr David Milsome – North Shore Recreation Club

  • Safety improvements required to car parks and roadways required.

  • Upgrade of second oval required.

  • Social rooms are currently under-utilised, however upgrade works could improve usage.

  • Supported. Significant upgrades to car parks and roadways included in recommendations.

  • Supported. Upgrade works to second oval included in recommendations.

  • Supported. Investigation of improvements to social rooms required.

Dr Anita Pearson – Deakin University

  • What is planned for the corner of Tallis St and Gerbera Ave?

  • Is a community garden planned?

  • Is the inclusion of public art, park benches and drink fountains planned?

  • Are more barbeques planned?

  • This is the planned site for the Family Services Hub.

  • Not supported. There is a community garden established within the Norlane Community Centre.

  • Supported. There are significant improvements recommended to the landscape and park furniture.

  • Not supported. No additional barbeques are recommended.

Mrs Liz Winning – Resident and Norlane Community Centre

  • The entrance to the park in the South-Western corner may be problematic and cause traffic concerns.

  • Car spaces will be lost for the Norlane Community Centre, especially disabled parking.

  • The skate park should not be moved.

  • Not supported. The new entrance will provide additional options for traffic circulation and will include appropriate traffic calming measures. This will also be gated to allow user groups to control traffic flows.

  • Not supported. The reconfiguration of car parking will provide additional parking space and will increase safety, especially at the rear of the clubrooms and front of the Norlane Community Centre.

  • Partially supported. There are no current plans to move the skate park. Should additional skate facilities be constructed in the future, the status of existing facilities should be reviewed.

3. WINDSOR PARK MASTER PLAN (2012) CONT’D

The final report for the Windsor Park Master Plan (2012) was delayed due to discussions between Council and the Department of Education & Early Childhood Development (DEECD) regarding the exchange of land in Peacock Ave and Gerbera Ave, Norlane as part of the Norlane Family Services Hub project. A report to Council on 28 February, 2012 confirmed Council’s intention to support the exchange of land with DEECD.

A summary of the level of completion of recommendations from the existing Master Plan is included in the Master Plan (2012).

Key outcomes of the Windsor Park Master Plan include the upgrade of pedestrian links, improved traffic circulation and parking, upgrades to sports facilities and improved appearance of the reserve through landscaping.

Formal reference groups were established to provide input into the planning process:

The consultation and research undertaken during the Windsor Park Master Plan confirmed a number of opportunities for implementation within the reserve:

3. WINDSOR PARK MASTER PLAN (2012) CONT’D

Initial consultation with key stakeholders through the PCG, PWG and PRG has indicated support for the vision, objectives and resultant report.

Key recommendations of the Windsor Park Master Plan (2012) include:

Implementation of recommendations will improve the overall amenity and functionality of the reserve, including improved access to the wider community for informal use of open space, enhanced traffic management, safety and pedestrian circulation. The current and future needs of all stakeholders and the wider community have been considered in allowing for improved facilities and amenities.


The Windsor Park Master Plan (2012) seeks to support initiatives that facilitate long-term environmental sustainability within the park, including water use, vegetation management and ongoing maintenance.

The Windsor Park Master Plan (2012) recognises that the community values the reserves ability to cater for a wide range of uses. The Windsor Park Master Plan (2012) respects the initiatives of previous Councillors and Council Officers in setting aside this space for public recreation. Future development will seek to enhance the landscape quality of the reserve, promote improvement of facilities, infrastructure and functioning for broad community use, whilst retaining the natural ambience of the precinct.

Community feedback gained during consultation has indicated a strong desire for the improvement of the landscape quality of the reserve, including the planting of trees and other vegetation within the reserve.

Financial Implications

The Windsor Park Master Plan (2012) provides a number of recommendations and indicative costings for recommended projects.

Where implementation of specific recommendations requires a new capital allocation from Council, these will be presented and considered as part of the overall annual budget process. Opportunities for contributions from Government, Clubs and other funding sources are listed against specific projects within the Master Plan.

3. WINDSOR PARK MASTER PLAN (2012) CONT’D

The implementation plan provides a broad estimate of cost specific to each of the recommended actions. These actions are assessed as Mandatory, Critical, High, Medium and Low to guide Council decision making in terms of development.

The Windsor Park Master Plan (2012) outlines the recommended implementation schedule and indicative capital costs for the works identified in the Master Plan. The total cost of all works is estimated at $2,537,850 and is represented by the following prioritised breakdown:

Mandatory: Nil

Critical: Nil

High: $957,840

Medium: $870,950

Low: $709,060

Whilst the adoption of this report does not have any direct financial implications, the listed actions within the plan will cost in the order of $2,537,850. It is expected that the Master Plan will be implemented over an approximate timeframe of 10-15 years.

Policy/Legal/Statutory Implications

The Equal Opportunity Act (1995) protects Victorians against discrimination based on a wide range of personal characteristics or associations. These include (but are not limited to) age, gender, ethnicity, disability, pregnancy, religion and employment status. The Windsor Park Master Plan (2012) recognises that all community members have equal rights to participate in and enjoy the benefits of sport and physical activity. The development of the reserve will consider design solutions to help facilitate access for all.

Officer Direct or Indirect Interest

No Council staff or persons engaged under contract have a direct or indirect interest in the development of the Windsor Park Master Plan (2012).

Risk Assessment

The Windsor Park Master Plan (2012) provides guidance for the development of this important piece of open space over the next 10-15 years.

There are no immediate risks associated with this report. Appropriate risk management measures will be put in place when implementing the recommendations of the report.

Social Considerations

 

The Windsor Park Master Plan (2012) will enhance recreational and social experiences within the park. Improvements in the design, layout and functionality of the reserve, together with improved landscape and path networks will increase safety for visitors to the park.

The Windsor Park Master Plan (2012) recognises that participation in sport and physical activity brings about a range of personal, social, health and economic benefits for individuals and communities.

Windsor Park has an established history of active recreational use, including formal sports such at football, cricket and netball. Future development of the reserve will support ongoing use of the area for a range of formal and informal sport and recreation activities.

The Windsor Park Master Plan (2012) recognises that formal sporting clubs support more that just participation in physical activity. Sporting clubs are recognised as providing a range of broader benefits to the community, including contributions to social capital, community cohesiveness, community connection and building local leaders.

Communication

The Windsor Park Master Plan (2012) has been overseen by a three tiered management structure. These include:

The planning process involved a comprehensive review of background material and the establishment of formal reference groups to guide the planning process. The project has involved extensive consultation with stakeholders, Council staff and the community.

The main consultation tasks have included:

 

In total, 83 individual surveys were completed. A summary of consultation results and key findings are included in Appendix 4: Community Consultation Findings of the Windsor Park Master Plan (2012) (previously supplied). The consultation results have been used to inform the identification of critical issues and major themes within the Windsor Park Master Plan (2012).

The draft Windsor Park Master Plan was released by Council for public comment between 4 November 2011 and 2 December 2011. The following steps were taken to provide opportunities for the community to provide feedback on the report:

A summary of the comments received by Council regarding the draft Windsor Park Master Plan is provided below:

Respondent

Summary of comments

Response

Mr David Milsome – North Shore Recreation Club

  • Safety improvements required to car parks and roadways required.

  • Upgrade of second oval required.

  • Social rooms are currently under-utilised, however upgrade works could improve usage.

  • Supported. Significant upgrades to car parks and roadways included in recommendations.

  • Supported. Upgrade works to second oval included in recommendations.

  • Supported. Investigation of improvements to social rooms required.

Dr Anita Pearson – Deakin University

  • What is planned for the corner of Tallis St and Gerbera Ave?

  • Is a community garden planned?

  • Is the inclusion of public art, park benches and drink fountains planned?

  • Are more barbeques planned?

  • This is the planned site for the Family Services Hub.

  • Not supported. There is a community garden established within the Norlane Community Centre.

  • Supported. There are significant improvements recommended to the landscape and park furniture.

  • Not supported. No additional barbeques are recommended.

Mrs Liz Winning – Resident and Norlane Community Centre

  • The entrance to the park in the South-Western corner may be problematic and cause traffic concerns.

  • Car spaces will be lost for the Norlane Community Centre, especially disabled parking.

  • The skate park should not be moved.

  • Not supported. The new entrance will provide additional options for traffic circulation and will include appropriate traffic calming measures. This will also be gated to allow user groups to control traffic flows.

  • Not supported. The reconfiguration of car parking will provide additional parking space and will increase safety, especially at the rear of the clubrooms and front of the Norlane Community Centre.

  • Partially supported. There are no current plans to move the skate park. Should additional skate facilities be constructed in the future, the status of existing facilities should be reviewed.

3. WINDSOR PARK MASTER PLAN (2012) CONT’D

The final report for the Windsor Park Master Plan (2012) was delayed due to discussions between Council and the Department of Education & Early Childhood Development (DEECD) regarding the exchange of land in Peacock Ave and Gerbera Ave, Norlane as part of the Norlane Family Services Hub project. A report to Council on 28 February, 2012 confirmed Council’s intention to support the exchange of land with DEECD.

A summary of the level of completion of recommendations from the existing Master Plan is included in the Master Plan (2012).

Key outcomes of the Windsor Park Master Plan include the upgrade of pedestrian links, improved traffic circulation and parking, upgrades to sports facilities and improved appearance of the reserve through landscaping.

Formal reference groups were established to provide input into the planning process:

The consultation and research undertaken during the Windsor Park Master Plan confirmed a number of opportunities for implementation within the reserve:

3. WINDSOR PARK MASTER PLAN (2012) CONT’D

Initial consultation with key stakeholders through the PCG, PWG and PRG has indicated support for the vision, objectives and resultant report.

Key recommendations of the Windsor Park Master Plan (2012) include:

Implementation of recommendations will improve the overall amenity and functionality of the reserve, including improved access to the wider community for informal use of open space, enhanced traffic management, safety and pedestrian circulation. The current and future needs of all stakeholders and the wider community have been considered in allowing for improved facilities and amenities.

Environmental Implications

The Windsor Park Master Plan (2012) seeks to support initiatives that facilitate long-term environmental sustainability within the park, including water use, vegetation management and ongoing maintenance.

The Windsor Park Master Plan (2012) recognises that the community values the reserves ability to cater for a wide range of uses. The Windsor Park Master Plan (2012) respects the initiatives of previous Councillors and Council Officers in setting aside this space for public recreation. Future development will seek to enhance the landscape quality of the reserve, promote improvement of facilities, infrastructure and functioning for broad community use, whilst retaining the natural ambience of the precinct.

Community feedback gained during consultation has indicated a strong desire for the improvement of the landscape quality of the reserve, including the planting of trees and other vegetation within the reserve.

Financial Implications

The Windsor Park Master Plan (2012) provides a number of recommendations and indicative costings for recommended projects.

Where implementation of specific recommendations requires a new capital allocation from Council, these will be presented and considered as part of the overall annual budget process. Opportunities for contributions from Government, Clubs and other funding sources are listed against specific projects within the Master Plan.

The implementation plan provides a broad estimate of cost specific to each of the recommended actions. These actions are assessed as Mandatory, Critical, High, Medium and Low to guide Council decision making in terms of development.

The Windsor Park Master Plan (2012) outlines the recommended implementation schedule and indicative capital costs for the works identified in the Master Plan. The total cost of all works is estimated at $2,537,850 and is represented by the following prioritised breakdown:

Mandatory: Nil

Critical: Nil

High: $957,840

Medium: $870,950

Low: $709,060

Whilst the adoption of this report does not have any direct financial implications, the listed actions within the plan will cost in the order of $2,537,850. It is expected that the Master Plan will be implemented over an approximate timeframe of 10-15 years.

Policy/Legal/Statutory Implications

The Equal Opportunity Act (1995) protects Victorians against discrimination based on a wide range of personal characteristics or associations. These include (but are not limited to) age, gender, ethnicity, disability, pregnancy, religion and employment status. The Windsor Park Master Plan (2012) recognises that all community members have equal rights to participate in and enjoy the benefits of sport and physical activity. The development of the reserve will consider design solutions to help facilitate access for all.

Officer Direct or Indirect Interest

No Council staff or persons engaged under contract have a direct or indirect interest in the development of the Windsor Park Master Plan (2012).

Risk Assessment

The Windsor Park Master Plan (2012) provides guidance for the development of this important piece of open space over the next 10-15 years.

There are no immediate risks associated with this report. Appropriate risk management measures will be put in place when implementing the recommendations of the report.

Social Considerations

 

The Windsor Park Master Plan (2012) will enhance recreational and social experiences within the park. Improvements in the design, layout and functionality of the reserve, together with improved landscape and path networks will increase safety for visitors to the park.

The Windsor Park Master Plan (2012) recognises that participation in sport and physical activity brings about a range of personal, social, health and economic benefits for individuals and communities. Windsor Park has an established history of active recreational use, including formal sports such at football, cricket and netball. Future development of the reserve will support ongoing use of the area for a range of formal and informal sport and recreation activities.

3. WINDSOR PARK MASTER PLAN (2012) CONT’D

The Windsor Park Master Plan (2012) recognises that formal sporting clubs support more that just participation in physical activity. Sporting clubs are recognised as providing a range of broader benefits to the community, including contributions to social capital, community cohesiveness, community connection and building local leaders.

Communication

The Windsor Park Master Plan (2012) has been overseen by a three tiered management structure. These include:

The planning process involved a comprehensive review of background material and the establishment of formal reference groups to guide the planning process. The project has involved extensive consultation with stakeholders, Council staff and the community.

The main consultation tasks have included:

In total, 83 individual surveys were completed. A summary of consultation results and key findings are included in Appendix 4: Community Consultation Findings of the Windsor Park Master Plan (2012). The consultation results have been used to inform the identification of critical issues and major themes within the Windsor Park Master Plan (2012).

The draft Windsor Park Master Plan was released by Council for public comment between 4 November 2011 and 2 December 2011. The following steps were taken to provide opportunities for the community to provide feedback on the report:

A summary of the comments received by Council regarding the draft Windsor Park Master Plan is provided below:

Respondent

Summary of comments

Response

Mr David Milsome – North Shore Recreation Club

  • Safety improvements required to car parks and roadways required.

  • Upgrade of second oval required.

  • Social rooms are currently under-utilised, however upgrade works could improve usage.

  • Supported. Significant upgrades to car parks and roadways included in recommendations.

  • Supported. Upgrade works to second oval included in recommendations.

  • Supported. Investigation of improvements to social rooms required.

Dr Anita Pearson – Deakin University

  • What is planned for the corner of Tallis St and Gerbera Ave?

  • Is a community garden planned?

  • Is the inclusion of public art, park benches and drink fountains planned?

  • Are more barbeques planned?

  • This is the planned site for the Family Services Hub.

  • Not supported. There is a community garden established within the Norlane Community Centre.

  • Supported. There are significant improvements recommended to the landscape and park furniture.

  • Not supported. No additional barbeques are recommended.

Mrs Liz Winning – Resident and Norlane Community Centre

  • The entrance to the park in the South-Western corner may be problematic and cause traffic concerns.

  • Car spaces will be lost for the Norlane Community Centre, especially disabled parking.

  • The skate park should not be moved.

  • Not supported. The new entrance will provide additional options for traffic circulation and will include appropriate traffic calming measures. This will also be gated to allow user groups to control traffic flows.

  • Not supported. The reconfiguration of car parking will provide additional parking space and will increase safety, especially at the rear of the clubrooms and front of the Norlane Community Centre.

  • Partially supported. There are no current plans to move the skate park. Should additional skate facilities be constructed in the future, the status of existing facilities should be reviewed.


The final report for the Windsor Park Master Plan (2012) was delayed due to discussions between Council and the Department of Education & Early Childhood Development (DEECD) regarding the exchange of land in Peacock Ave and Gerbera Ave, Norlane as part of the Norlane Family Services Hub project. A report to Council on 28 February, 2012 confirmed Council’s intention to support the exchange of land with DEECD.

Cr Fisher re-entered the meeting room at 7:48pm [Back to List]

4. Review of Council Policy – Electoral Advertising Signage

Portfolio:

Community Development – Cr Fisher
Democracy and Governance – Cr Mitchell

Source:

Community Services – Health & Local Laws

General Manager:

Jenny McMahon

Index Reference:

Subject: Policies & Procedures / document development

Summary

Cr Macdonald moved, Cr Nelson seconded -

That Council endorses the Electoral Advertising Signage policy (Appendix 4-1).


Carried.


Report

Background

Council policies are developed to clearly articulate Council’s intent and preferred method of operation.

Policies are reviewed regularly to ensure that they are current and remain relevant.


Discussion

The following policies have been reviewed and minor changes have been made and are summarised below:

Policy

Electoral Advertising Signs on Road Reserves CPL45.8

Responsible Manager

Manager Health and Local Laws

Purpose

Establishes Council’s position in relation to the placement of electoral signs

Comment

Minor change – updated reference to correct Division and retention period for correspondence.


Environmental Implications

There are no environmental considerations in the review of this policy.


Financial Implications

The policies provide Council with direction for the effective management and control of its resources, however there is no impact on budget.


Policy/Legal/Statutory Implications

The policies have been developed with reference to relevant legislation and will enable Council to more effectively meet compliance requirements.


Officer Direct or Indirect Interest

No officer had a direct or indirect interest in the development of this report.


Risk Assessment

Clearly articulated policies provide Council with a consistent and publicly declared attitude to specific topics. This will assist in reducing the risk and negative consequences to Council that may occur through inconsistent decision making, actions or practices.


Social Considerations

Social considerations have been taken into account in the development of Council Policies.


Communication

The adopted policy will be available on Council’s internet site.


Appendix 4-1

COUNCIL POLICY

Electoral Advertising Signs On Road Reserves and Council Land

Document No:

CPL45.8

Approval Date:

 

Approved By:

Council

Review Date:

10 July 2012

Responsible Officer:

Expiry Date:

N/A

General Manager Community Services

Version No

01

Authorising Officer:

Chief Executive Officer


1. PURPOSE

The purpose of this policy is to provide direction on the placement of electoral advertising signs on any Council land, municipal building or road, and to avoid excessive sign clutter.


2. SCOPE

This policy applies to all electoral candidates and prohibits any electoral advertising signs on Council land, municipal buildings or roads.

Candidates in all levels of Government elections –

are subject to this policy.


3. REFERENCES


4. DEFINITIONS


5. COUNCIL POLICY

The Council has the responsibility for approving an application for the placement of temporary signs on Council land, roads and in or on Municipal Buildings.

Council must remain totally impartial in relation to the promotion of a candidate/s at any democratic election at either Federal, State or Local Government level. It is therefore the policy of Council to refuse any application for the location of an election sign on any Council land, roads or Municipal Buildings within the City of Greater Geelong.

Compliance with this Policy will be monitored and enforced in accordance with Council’s operating guidelines.


6. QUALITY RECORDS

Quality Records shall be retained for at least the period shown below.

Record

Retention/Disposal Responsibility

Retention Period

Location

Correspondence in relation to election signage

class 8.2.7 of the Retention and Disposal Authority for Records of Local Government Functions (PROS 09/05),

4 years after the election

Document Management Services

 

 


[Back to List]

5. Belmont Street, Belmont – Proposed Carpark Construction SRC304 – Declaration of Charge

Portfolio:

Infrastructure - Cr Richards

Source:

City Services - Engineering Services

General Manager:

Gary Van Driel

Index Reference:

Street: Belmont Street, Belmont
Subject: Carpark, Special Rates and Charges


Summary

Cr Harwood moved, Cr Abley seconded -

That consideration of the report be deferred.


Carried.


[Back to List]

6. O’Briens Road, Lara – Road Construction SRC317 – Finalisation of Scheme

Portfolio:

Infrastructure - Cr Richards

Source:

City Services - Engineering Services

General Manager:

Gary Van Driel

Index Reference:

Subject: Special Rates and Charges
Street: O'Briens Road, Lara


Summary

Cr Granger moved, Cr Abley seconded –


That consideration of the report be deferred.


Carried.


[Back to List]

7. Princess Street, Drysdale SRC325 – Finalisation of Scheme

Portfolio:

Infrastructure - Cr Richards

Source:

City Services - Engineering Services

General Manager:

Gary Van Driel

Index Reference:

Special Rates and Charges; Princess Street, Drysdale


Summary

Cr Richards moved, Cr Macdonald seconded -

That Council having declared a special charge on 10 August 2010 for the purposes of defraying the expenses in relation to the construction of footpath, kerb and channel and road widening in Princess Street Drysdale, west side between Eversley Street and Newcombe Street, Drysdale (Appendix 7-2 – Plan) in accordance with Section 163 of the Local Government Act 1989 (the Act) resolves that:

  1. the special charge as declared be confirmed in accordance with actual costs incurred on the project as required by Section 166 of the Act as shown in Schedule A – Appendix 7-1;

  2. the General Manager of Corporate Services is authorised to levy and recover the special charges by sending notices to the persons who are liable to pay in accordance with Section 166 of the Act and the Regulations; and;

  3. in accordance with Section 172, the rate of interest which is payable on the special charges which have not been paid by the specified date is set at Council’s overdraft rate, reviewed every three months (provided that it shall not exceed the rate fixed by the Governor in Council by Order for the purposes of Section 172 2A in which case the rate of interest shall be the maximum fate fixed by the Governor in Council by Order for the purposes of the Section). The interest is to be calculated from the date the special charge is due, with a six months interest free period, providing those persons who choose to pay by instalments adhere to their repayment plan.

Carried.


Report

Background

This report relates to the finalisation of a special charge scheme for footpath, kerb and channel and road pavement in Princess Street, Drysdale, west side between Newcombe Street and Eversley Street.

This block was one with “missing” infrastructure, no footpath, kerb and channel or road widening.

Council had received enquiries and complaints particularly in relation to footpath as there is a residential area to the west and close proximity to the High Street Shopping Centre.

A combined footpath and kerb and channel scheme was undertaken. The actual costs for the special charge scheme components were only marginally above the estimate and in this case it is considered appropriate to charge the estimated cost.


Discussion

The works have now been completed and it is appropriate for Council to finalise the scheme.

The financial details are as follows:

 

Estimated Cost

Actual Cost

Footpath component

$36,732

$36,766

Kerb and channel component

$20,095

$20,660


As there is very little difference between the estimated cost and the actual cost, the estimated costs have been adopted as the finalised figures. Therefore the cost to be distributed to property owners is $38,461 which is made up of half the footpath component and the kerb and channel component (both based on estimated cost).

Council undertook a considerable amount of additional pavement and drainage works as part of the project at a cost of $90,808.


Environmental Implications

There are no environmental implications including sustainability, energy use, water use or alternative material use, in Council’s decision to finalise this scheme. The process is an administrative matter only.


Financial Implications

There are no financial implications associated with Council proceeding to finalise the scheme. Property owners will be advised of the cost adjustment.


Policy/Legal/Statutory Implications

The scheme has been administered in accordance with the special rate and charge provisions of the Local Government Act as well as Council’s Special Rates and Charges Policy. There are no issues regarding the Human Rights Charter.


Officer Direct or Indirect Interest

No Council Officer involved with this process has any direct or indirect interest in the properties.


Risk Assessment

Provision of a footpath has provided safer walking conditions for pedestrians by minimising the risk of personal injuries through falls and conflict between pedestrians and vehicles. There are no risk assessment issues in Council proceeding to finalise the scheme.


Social Considerations

There are no social considerations associated with Council proceeding to finalise the scheme.


Communication

Communication with property owners has taken place during the course of the project. Owners will be advised of Council’s decision and the final cost.


Appendix 7-1

Special Charge Scheme for the Construction of Footpath and Kerb & Channel in Princess Street Drysdale

Prop Key

Property Details

Property Address

Actual
Costs

258654

Lot 4 LP 98033

34-36 Princess Street, Drysdale VIC 3222

$10,464

258660

Lot 3 LP 93189

42 Princess Street, Drysdale VIC 3222

$4,806

258661

Lot 2 LP 93189

53 Newcombe Street, Drysdale VIC 3222

$ 8,304

258655

Lot 1 SP 20532

1/38-40 Princess Street, Drysdale VIC 3222

$ 2,977

258656

Lot 2 SP 20532

2/38-40 Princess Street, Drysdale VIC 3222

$ 2,977

258657

Lot 3 SP 20532

3/38-40 Princess Street, Drysdale VIC 3222

$ 2,977

258658

Lot 4 SP 20532

4/38-40 Princess Street, Drysdale VIC 3222

$ 2,977

258659

Lot 5 SP 20532

5/38-40 Princess Street, Drysdale VIC 3222

$ 2,977


Appendix 7-2

PLAN

Plan


Attachment 7-1

PROCESS CHART

SPECIAL CHARGE PROJECTS – (Section 163 – Local Government Act 1989)

PRINCESS STREET, DRYSDALE

Stage

Status

Description

Approval to prepare scheme

Tick – success icon

Decision made to prepare scheme following consideration of surveys of property owners and feed back from the community. Council may then place the project in the budget system or proceed immediately to prepare a scheme. Scheme preparation involves survey, design and preparation of an apportionment of costs.

Intention to Declare Scheme

Tick – success icon

Report to Council providing information on scheme including advice of impending advertising of scheme and declaration of charge. Seeks Council approval by resolution to proceed with process. 10 September 2009

Advertisement

Tick – success icon

The scheme is advertised in the local newspaper and all allotted property owners are notified by mail. This advertisement indicates Council’s intention and notification to ‘declare’ a scheme in a month’s time. 19 December 2009

Submissions

Tick – success icon

From the time of advertising property owners have 28 days (as set down by the Local Government Act) to lodge submissions, either in support or opposition to the scheme.

Submissions Review Panel Hearing

 

Tick – success icon

A Submissions Review Panel is convened (quorum of three Councillors) and meets to consider submissions. Some submissions are written only, and other submitters may wish to be heard before the Panel. The Panel makes a recommendation to Council regarding the scheme. 22 March 2010

Declaration Report

Tick – success icon

Any time 28 days after advertising the scheme and after the Submissions Review Panel has met and considered submissions, Council considers a report and may proceed to “declare” the charges in accordance with its advertised intent.

Subsequent to this the Finance Manager issues the levy notices and there is a formal charge placed on the property.

This is the final step in the process for Council to make a decision on the scheme. 10 August 2010

Appeal

N/A

Property owners may lodge an application for review with the Victorian Civil and Administrative Tribunal (VCAT) within one month of issue of the levy notice. An appeal is listed, heard and determined by the Tribunal and this process generally takes three to four months. Decisions made by VCAT are binding on all parties.

Construction

Tick – success icon

Council may then proceed to construct the works. Invoices are issued seeking payment of the estimated cost within one month of commencement.

Final Cost Report

Tick – success icon

At the completion of the works the scheme is “finalised” taking into account actual costs incurred and payments are adjusted accordingly.